Detailed Description
Contents | Folder | ||||
---|---|---|---|---|---|
Accretion: B0700-85 |
|||||
Folder 1 | 1 |
Contents |
---|
DATA DRAWING ASSEMBLY STAIRCASE CAPITOL ALBANY NY |
NORTH WALL NORTH GALLERY 4TH FLOOR (STAIRCASE N) |
NORTH WALLK NORTH GALLERY 4TH FLOOR (STAIRCASE N) |
UNTITLED |
Folder 2 | 2 |
Contents |
---|
ROLL TOP DESK "R" AND LOUNGING BED "E" |
LEATHER BACKS AND PERFORATED LEATHER SEATS F, G, H |
DESKS AND DESK LAMPS D, I, Q |
DESKS O, Y, N |
PERFORATED LEATHER SEATS T, U, K, M, L |
LEATHER COVERED SEATS AND BACKS, Z, V, W, X |
LEATHER COVERED SEATS AND BACKS, E, B, C, A |
Folder 3 | 3 |
Contents |
---|
DETAIL OF STAIRS TAX DEPT ROOM 431 CAP ALBANY NY NC CLAOSEN ARCH IRON CO |
FSD OF LUPTEN STEEL SASH |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
FLOOR AREA STATE DEPARTMENT |
FLOOR AREA STATE DEPARTMENT |
Folder 4 | 4 |
Contents |
---|
STATE CAPITAL ALTERATION FULL SCALE DWG FOR TWO KAL. PARTITIONS SHOP DETAIL 720 |
DETAIL OF STEEL STAIR ROOM 435 STATE TAX DEPT |
DRAWING RACK FRAMES |
DETALS OF STEEL TAX DEPARTMENT ROOM 431 |
F.S. DETAILS SHOWING NEWELS AND STRING ROOM 435 |
Folder 5 | 5 |
Contents |
---|
DUMB WAITER CABINET |
DETAIL OF TWO SPECIAL TRANSOMS IN WEST WALL OF ROOM 609 DEPT OF ARCHITECTURE |
DETAILS OF STAIR TO MEZZANINE AND TRANSOMS ROOM 609 AND STAIR TO MEZZANINE ROOM 409 |
DETAILS OF STRUCTURAL STEEL FOR NEW MEZZANINE IN ROOM 609 DEPT OF ARCHITECTURE |
DETAILS OF STAIR TO MEZZANINE AND TRANSOMS ROOM 609 AND STAIR TO MEZZANINE ROOM 409 |
Folder 6 | 6 |
Contents |
---|
ELECTRIC REPLACEMENTOF ELECTRICAL WORK EAST SECTION INTERIOR FIXTURE FOR ASSEMBLY LOBBY |
SMALL VENTURA LANTERN T-3746081 |
REHABILITATE SLOP SINK ROOM FIRST FLOOR DETAILS |
CAPITOL CONSTRUCTION REHABILITATE SLOP SINK RM FIRST FLOOR PLANS & SECTIONS |
Folder 7 | 7 |
Contents |
---|
FIRST FLOOR |
4TH FLOOR |
5TH FLOOR |
2ND FLOOR |
Folder 8 | 8 |
Contents |
---|
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
EAST FAÇADE (NORTH SECTION) |
Folder 9 | 9 |
Contents |
---|
CENTRAL COURT |
PLAN OF FOOTINGS NORTH WEST QUARTER |
PLAN OF FOOTINGS |
PLAN OF FOOTINGS |
PLAN OF FOOTINGS OF CENTER COURT |
Folder 10 | 10 |
Contents |
---|
NEW CAPITAL ALBANY NY NO. 4 SUB CELLAR PLAN |
NEW CAPITAL ALBANY NY NO. 5 BASEMENT FLOOR PLAN |
NEW STATE CAPITAL NY NO. 6 ENTRANCE FLOOR |
STATE LIBRARY PLAN OF GENERAL READING ROOM PRINCIPAL FLOOR #38A |
NY STATE LIBRARY N0 33 |
Folder 11 | 11 |
Folder 12 | 12 |
Contents |
---|
PLAN & SECTION OF RED GRANITE BEAMS FOR CEILING OF EAST CORRIDOR WESTERN |
SECOND STORY PLAN |
PLAN OF FOOTINGS OF CENTER COURT |
FIRST STORY PLAN |
ELEVATION AS BUILT OF WEST CHIMNEY SOUTH EAST PAVILION |
Folder 13 | 13 |
Contents |
---|
DETAIL OF WEST CHIMNEY SOUTH EAST PAVILION |
SECTION THROUGH SOUTH CHIMNEY ON COURT |
DORMER WINDOWS ON NORTH SIDE OF ASSEMBLY CHAMBER |
BASEMENT PLAN |
ROOF OVER PAVILION |
Folder 14 | 14 |
Contents |
---|
ELEVATION ON HAWK STREET NO 3 |
ELEVATION ON PARK DWG NO 1 |
ELEVATION ON WASHINGTON AVE. NO 2 |
MAP OF LOTS PROPOSED TO BE TAKEN BY THE STATE FOR ENLARGING THE NEW CAPITOL GROUNDS IN BLOCK BOUNDED BY HAWK, SWAN, STATE STS & WASHINGTON AVE |
MAP OF LOTS PROPOSED TO BE TAKEN BY THE STATE FOR ENLARGING THE NEW CAPITOL GROUNDS IN BLOCK BOUNDED BY HAWK, SWAN, STATE STREETS AND WASHINGTON |
Folder 15 | 15 |
Contents |
---|
PLAN OF FIRST COURSE OF FOOTINGS OUTSIDE WALLS |
FRONT EAGLE STREET |
PLAN OF TOWER FOOTING |
PORTION OF MAP # 6 OF CITY OF ALBANY |
PLAN OF FIRST COURSE OF FOOTINGS OF OUTSIDE WALLS |
Folder 16 | 16 |
Contents |
---|
WIRING PLAN FOR ROOM 260 |
UNTITLED |
EAST CORRIDOR VENTILATING PLAN OF FOURTH FLOOR TOWER |
ELEVATION SHOWING TRUSS AND POSTS SUPPORTING DIAGONAL RIBS IN LARGE CENTRAL ARCH ASSEMBLY CHAMBER |
BASEMENT FOUNDATIONS OF WEST STAIRCASE |
Folder 17 | 17 |
Contents |
---|
SECTION THROUGH CENTER OF EASTERN APPROACH |
PLAN OF DRIVEWAY EASTERN APPROACH |
PLAN OF VENTILATING DUCTS CMSN RM 2ND FLOOR |
DRIVEWAY 798-10 |
CENTER OF DRIVEWAY 798-54 |
Folder 18 | 18 |
Contents |
---|
SUPPORT OF GALLERY SENATE CHAMBER |
GIVING BASE OF GREAT COLUMNS OF GALLERY SENATE CHAMBER, ARRANGEMENT OF BALUSTRADE |
UNTITLED |
EAST FRONT DETAIL OF GABLE (SIDE) #10 |
ELEVATION OF SOUTH WALL STATE LIBRARY |
798-33 |
Folder 19 | 19 |
Contents |
---|
DETAIL OF NORTH EAST CHIMNEY ON SENATE CHAMBER ROOF |
DRIVEWAY & EASTERN APPROACH |
DETAILED SECTION EAST & WEST THROUGH CENTER EASTERN APPROACH 798-20 |
ELEVATION OF OUTER FACE OF ARCH PRINCIPAL FLOOR WESTERN STAIRCASE |
UNTITLED |
Folder 20 | 20 |
Contents |
---|
DETAIL OF NORTH WEST CHIMNEY OF SENATE CHAMBER ROOF |
DRIVEWAY 798-31 |
PLAN OF CEILING OVER DRIVEWAY EASTERN APPROACH |
798-36 |
ELEVATION ON LINE O NORTH LOOKING TOWARD STATE LIBRARY |
Folder 21 | 21 |
Contents |
---|
798-38 |
PRINCIPAL FLOOR DETAILS HALF PLAN OF BEAMS & PANELS FOR CEILING EAST & WEST CORRIDOR WESTERN STAIRCASE |
FOUNDATION PLAN OF EASTERN APPROACH BACK TO FRONT WALL OF ROADWAY |
PLAN OF IRON BEAMS FOR PLATFORM TOP OF FOURTH RUN EASTERN APPROACH |
PLAN OF EASTERN ENTRANCE (TAKEN ON TOP OF ABACUS) SECOND FLOOR |
Folder 22 | 22 |
Contents |
---|
CENTRAL DORMER WINDOW ON EAST FRONT |
UNTITLED |
SECTION OF FOUNDATION |
CENTRAL DORMER WINDOWS ON EAST FRONT (CORRECT DWG) |
ELEVATION OF WINDOWS SECOND FLOOR TOWER EAST SIDE OF CENTRAL COURT |
Folder 23 | 23 |
Contents |
---|
PLAN OF CEILING EASTERN APPROACH |
ELEVATION ON TRANSVERSE TRESTLE |
PLAN SHOWING CONSTRUCTION OF TIE BEAMS |
PLAN OF ELECTRIC LIGHTING PORTICO LOBBIES & TOWER |
WEST WALL WEST CORRIDOR WESTERN STAIRCASE AT CEILING OF 4TH FLOOR |
Folder 24 | 24 |
Contents |
---|
PLAN & ELEVATION ABOVE LINTEL OF SOUTH CORRIDOR WESTERN STAIRCASE |
PLAN OF N & S BALCONY GALLERY FLOOR WESTERN STAIRCASE |
PLAN OUTSIDE DOUBLE DOORS FOR WEST ENTRANCE LOBBY |
CLOSET PARTITION NORTH EAST SIDE OF WESTERN STAIRCASE FIRST STORY |
UNTITLED |
Folder 25 | 25 |
Contents |
---|
UNTITLED |
UNTITLED |
NORTH & SOUTH PORCHES 1A |
FOURTH FLOOR SOUTH CORRIDOR WESTERN STAIRCASE 30 |
UNTITLED |
Folder 26 | 26 |
Contents |
---|
WAINSCOTING ENTRANCE FLOOR NORTH WEST CORRIDOR |
MEZZ FLOOR OFFICE OF SUPT OF PRISONS |
SKYLIGHT OVER SOUTH EAST STAIRCASE, MAIN TRUSSES |
GALLERY & MEZZANINE PLAN |
SOUTH EAST STAIRCASE SECTION THROUGH LINE C-D LOOKING SOUTH |
Folder 27 | 27 |
Contents |
---|
WINDOWS IN EAST & SOUTH WALLS OF SENATE STAIRCASE |
SOUTH EAST STAIRCASE SECTION THROUGH LINE C-D LOOKING NORTH |
PRINCIPAL FLOOR PLAN SHOWING LOCATION OF ELECTRIC LIGHT WIRES, STEAM, GAS & OTHER PIPES |
DETAIL AT E-F OF SECTION ON LINE A-B LOOKING EAST |
SOUTH EAST STAIRCASE |
Folder 28 | 28 |
Contents |
---|
GALLERY FLOOR PLAN SHOWING LOCATON OF ELECTRIC LIGHT WIRES, STEAM, GAS, WATER & OTHER PIPES |
GROUND FLOOR PLAN SHOWING LOCATION OF ELECTRIC LIGHT WIRES, STEAM, GAS & OTHER PIPES |
PRINCIPAL FLOOR ELEVATION OF STAIRCASE SIDE OF EAST & WEST CORRIDORS WESTERN STAIRCASE |
UNTITLED |
PLAN & ELEVATION ABOVE LINTEL OF NORTH CORRIDOR WESTERN STAIRCASE |
Folder 29 | 29 |
Contents |
---|
CEILING FRAMING OF ASSEMBLY CHAMBER |
PLANS OF GIRDERS & PANELS-BEAMS FOR ASSEMBLY-CEILING FOR SULLIVAN EHLERS |
PLAN OF ASSEMBLY FLOOR |
ELEVATION OF TRANSVERSE TRESTLE |
UNTITLED |
Folder 30 | 30 |
Contents |
---|
TRANVERSE SECTION THROUGH ASSEMBLY CHAMBER FOR SULLIVAN AND EHLERS |
LONGITUDINAL SECTION THROUGH ASSEMBLY CHAMBER FOR SULLIVAN AND EHLERS |
GIRDERS FOR STAIRCASE (ASSEMBLY) FOR SULLIVAN AND EHLERS 788-1 |
ASSEMBLY CEILING GIRDER D FOUR FOR SULLIVAN AND EHLERS |
PLAN OF FLOOR BEAMS OVER ASSEMBLY CEILING FOR SULLIVAN AND EHLERS |
Folder 31 | 31 |
Contents |
---|
EASTERN APPROACH CIRCULAR CORNER PLAN OF NORTH CORNER THROUGH BALUSTER |
PLAN OF STAIRCASE FOUNDATION AS ORIGINALLY CONSTRUCTED |
UNTITLED |
ASSEMBLY CHAMBER CEILING |
GIRDER ON CENTER LINE WITH SECTIONS |
Folder 32 | 32 |
Contents |
---|
ASSEMBLY CHAMBER DESIGN OF PAPIER MACHE CEILING |
DETAIL OF WINDOW OPENINGS EAST SIDE OF EAST CORRIDOR (COURT WALL) 3RD FLOOR WESTERN STAIRCASE |
UNTITLED |
NORTH WALL NORTH GALLERY 4TH FLOOR |
WESTERN STAIRCASE |
Folder 33 | 33 |
Contents |
---|
ELEVATION OF NORTH & SOUTH SIDES OF STAIRCASE GALLERY FLOOR DETAIL |
PLAN OF FOUNDATION STONES UNDER NEW FRONT GABLE |
PLAN OF FOUNDATION STONES UNDER NEW FROUNT GABLE |
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
PLAN OF FOUNDATION STONES UNDER NEW FRONT GABLE |
Folder 34 | 34 |
Contents |
---|
ELEVATION OF CURVED BALCONIES NORTH & SOUTH SIDE THIRD FLOOR WESTERN STAIRCASE |
TRANSVERSE SECTION THROUGH CENTRAL READING ROOM LOOKING SOUTH |
PLAN OF PORTION OF ENTRANCE SHOWING PROPOSED ALTERATIONS IN GOLDEN CORRIDOR & COURT OF APPEALS 2ND DIVISION |
PLAN OF CIRCULAR CORNERS SOUTH SIDE OF EASTERN APPROACH |
SECTION THROUGH WEST CHIMNEY SOUTH EAST PAVILION |
Folder 35 | 35 |
Contents |
---|
GALLERY FLOOR DETAILS PANELS FOR CEILING EAST CORRIDOR |
GALLERY FLOOR DETAILS PLAN OF I BEAMS EAST CORRIDOR |
FOUNDATION PLAN SHOWING IRON BEAMS EASTERN APPOACH |
PLAN OF TERRACE SOUTH EAST CORNER |
PLAN OF AREA SOUTH SIDE EAST TERRACE |
Folder 36 | 36 |
Contents |
---|
PLAN OF APPROACH SHOWING BASE COURSE & FOUNDATION UNDER PORTICO |
PLAN OF CIRCULAR CORNER EASTERN APPROACH |
PLAN OF TERRACE SHOWING FLAGGING 798-13 |
PLAN & ELEVATION OF NORTH SIDE OF NORTH CORRIDOR, WESTERN STAIRCASE |
EASTERN APPROACH-CIRCULAR CORNER PLAN OF NORTH CORNER THROUGH BALUSTERS |
Folder 37 | 37 |
Contents |
---|
WEST SIDE OF WEST CORRIDOR WESTERN STAIRCASE GALLERY FLOOR |
PRINCIPAL FLOOR DETAILS, PANELS FOR CEILING, WEST CORRIDOR, WESTERN STAIRCASE |
NORTH SIDE OF NORTH CORRIDOR WESTERN STAIRCASE GALLERY FLOOR |
EAST SIDE OF WEST CORRIDOR WESTERN STAIRCASE |
NORTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
WEST ELEVATION SOUTHEAST SUPPORT GIRDERS OVER WESTERN STAIRCASE |
Folder 38 | 38 |
Contents |
---|
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR GALLERY FLOOR |
IN SCALE DRAWING OF THIRD RUN OF STEPS EASTERN APPROACH 798-26 |
WESTERN STAIRCASE #12 SECTION ON LINE R-S ELEVATION OF EAST WALL GROUND FLOOR |
PLAN SHOWING LIGHT TELEPHONE & FIRE ALARM OUTLETS ROOMS 306 307 308 THIRD FLOOR |
UNTITLED |
Folder 39 | 39 |
Contents |
---|
DWG OF EAST FRONT ENTRANCE FLOOR |
EASTERN APPROACH DETAILS PLAN OF IRON BEAMS SOUTH SIDE TERRACE |
ELEVATION & PLAN SHOWING RAIL CONNECTION WITH PEDESTAL AT THE EAST INTERSECTION OF DRIVEWAY & SOUTH SIDE TERRACE NO 798-42 |
PLAN OF CEILING WESTERN APPROACH & PORTICO |
FLOOR PLAN |
Folder 40 | 40 |
Contents |
---|
PLAN & ELEVATION OF SOUTH SIDE OF WEST LOBBY |
PLAN & ELEVATION OF WEST SIDE OF WEST CORRIDOR WESTERN STAIRCASE |
SECTION THROUGH SOUTH CORRIDOR LOOKING SOUTH GALLERY & ATTIC FLOORS |
PLAN OF EAST ENTRANCE ENTRANCE FLOOR |
ELEVATION OF SOUTH WALL EAST ENTRANCE SECOND FLOOR |
Folder 41 | 41 |
Contents |
---|
FOUNDATION PLAN WESTERN APPROACH & PORTICO |
ELEVATION OF NORTH WALL EAST ENTRANCE SECOND FLOOR |
TERRA COTTA FINIAL FOR NORTH EAST PAVILLION |
EAST SIDE OF EAST CORRIDOR GALLERY FLOOR WESTERN STAIRCASE |
PLAN OF DOME OVER WESTERN STAIRCASE |
Folder 42 | 42 |
Contents |
---|
PLAN ELEVATION & SECTION OF NORTH CORRIDOR ROOF |
GALLERY FLOOR DETAILS HALF ELEVATION OF EAST & WEST SIDES OF STAIRCASE LOOKING FROM CENTER |
PLAN OF LIGHTING DOME OVER WESTERN STAIRCASE |
ELEVATION OF NORTH & SOUTH WALLS GALLERY FLOOR WESTERN STAIRCASE |
PLAN OF CEILING WESTERN STAIRCASE |
Folder 43 | 43 |
Contents |
---|
SECTIONS THROUGH SOUTH EAST PAVILION SHOWING OFFICES FOR STATE HISTORIAN |
ALTERATIONS AND REPAIRS CAPITOL BOILER HOUSE ALBANY NY NO 1 |
SECOND FLOOR PLAN OF MAIN TOWER SHOWING NEW PARTITIONS ETC FOR NY DEPT OF THE GAR DWG NO 1 |
FRAMING PLAN OF EAST ENTRANCE ENTRANCE FLOOR |
ELEVATION SHOWING BALUSTERS & RAIL ON THIRD FLOOR WEST SIDE OF CENTRAL COURT |
Folder 44 | 44 |
Contents |
---|
ENCLOSED PASSAGE IN CAPITOL COURT DWG NO 1 |
ENCLOSED PASSAGE IN CAPITOL COURT DWG NO 2 |
ELEVATION & SECTION OF NEW ROOM LOOKING EAST |
UNTITLED |
UNTITLED |
Folder 45 | 45 |
Contents |
---|
UNTITLED |
NEW TRANSOM OPENERS FOR ROOMS 516 & 522 |
ACCESS DOOR & FRAME AT THIRD FLOOR CORRIDOR OPPOSITE RM #308 LOCK FOR WASTE PAPER CHUTE DOOR 1ST FLOOR |
UNTITLED |
UNTITLED |
Folder 46 | 46 |
Contents |
---|
PARTITIONS & GALLERY IN GENERAL OFFICE STATE CIVIL SERVICE COMMISSION |
UNTITLED |
VENTILATING WORK & CHANGES IN GOVERNOR'S OFFICES SECTIONS SHOWING PRESENT WORK DWG NO 3 |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE EQPT OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 SECOND FLOOR |
Folder 47 | 47 |
Contents |
---|
VENTILATING WORK GOVERNOR'S OFFICES PLANS SHOWING NY NO 4 |
GALLERY IN OFFICE OF SECRETARY OF STATE |
DORMER ON NORTH ROOF ETC |
ALTERATIONS DEPT OF LABOR N0 32 |
5TH FLOOR SOUTH EAST PAVILLION ELEVATION AND SECTION |
STANDARD DETAIL ELECTRIC FIXTURES |
Folder 48 | 48 |
Contents |
---|
FIFTH FLOOR CORRIDOR FROM SOUTH EAST PAVILLION TO ELEVATIORS TILING |
FIFTH FLOOR SOUTH EAST PAVILION PLAN OF NEW ROOMS |
COURT OF APPEALS VENTILATING SYSTEM |
ALTERATIONS IN TOWER ROOM 5TH FLOOR |
Folder 49 | 49 |
Contents |
---|
INSTALLING NEW ELECTRIC PLANT ENGINES GENERATORS & SWITCHBOARD |
DATA SHEET TABLE OF PRESENT PIPING NY ST CAPITOL ALBANY NY ALTERATIONS TO PLUMBING |
DATA ASSEMBLY STAIRCASE CAP ALBANY |
ASSEMBLY STAIRCASE CAPITOL ALBANY |
STANDARD DETAILS SHOWING INSTALLATION OF ELECTRIC CONDUIT BOXES & OPEN WEATHERPROOF WIRING ON CHANNEL BARS |
Folder 50 | 50 |
Contents |
---|
PROPOSED LIBRARY SITE PORTIONS OF MAP & DIAGRAMS Q & R CITY OF ALBANY DATA DRAWING |
CAPITOL REMOVING TOWER WALLS ABOVE SIXTH STORY |
REMOVING & REPLACING COLUMNS FIRST STORY ASSEMBLY STAIRCASE |
DATA DRAWING NEW YORK STATE CAPITOL ALBANY NY |
STANDARD DETAIL COMBINATION GAS & ELECTRIC FIXTURES |
Folder 51 | 51 |
Contents |
---|
ALTERATIONS IN TOWER ROOM 5TH FLOOR AMENDING DWG 122 |
ALTERATIONS TO PLUMBING |
NEW YORK STATE CAPITOL |
METALLIC LEDGER DESK CLERKS OFFICE EXECUTIVE DESK |
ELEVATION OF MEZZ FLOOR CLERK'S OFFICE EXEC DEPT |
Folder 52 | 52 |
Contents |
---|
PLANS OF MEZZANINE FLOOR EXEC DEPT |
MEZZANINE FLOORS OFFICES OF PUBLIC SERVICE COMM FIRST FLOOR |
ELECTRIC TABLES & DIAGRAMS OFFICES OF PUBLIC SERVICE COMMISSION 1ST & 2ND FLOOR |
WOOD GLAZED PARTITIONS FOR OFFICES, DEPT OF PUBLIC WORKS FIRST FLOOR OF TOWERS |
NEW RAILING ANTE ROOM EXEC CHAMBER |
Folder 53 | 53 |
Contents |
---|
MEZZ FLOOR OFFICE OF FOREST FISH & GAME COMM |
ENLARGING & IMPROVING POST OFFICE FACILITIES |
ST ARCHITECT'S OFFICE ONE CASE OF DRAWERS |
CHANGES IN STORE ROOM FISCAL SUPERVISOR'S OFFICE 5TH FLOOR |
TRANSOM SASH ENLARGING & IMPROVING POST OFFICE FACILITIES |
Folder 54 | 54 |
Contents |
---|
OFFICES ON 1ST FLOOR SOUTH ENTRANCE DEPT OF STATE INSURANCE ELEVS PLANS & SECTIONS |
PARTITION FOR PORTER'S CLOSET UNDER ASSEMBLY STAIRCASE 1ST FLOOR |
NEW GLASS PARTITION PRISON DEPT ELEV & DETAILS |
METAL FILING CASES NY ST FISCAL SUPERVISORS OFFICE |
CHANGES IN CLERKS ROOM FISCAL SUPERVISOR'S OFFICE 5TH FLOOR |
Folder 55 | 55 |
Contents |
---|
METAL FILING CASES FOR THE ADJUTANT GENERAL'S OFFICE |
ALTERATIONS IN OFFICE OF SUPERINTENDENT OF PRISONS CONSTRUCTION & ELECTRIC WORK |
ALTERATIONS TO GIRDER G30 |
UNTITLED |
UNTITLED |
Folder 56 | 56 |
Contents |
---|
UNTITLED |
UNTITLED |
UNTITLED |
UNTITLED |
PLAN ONE HALF SOUTH EAST |
Folder 57 | 57 |
Contents |
---|
DETAIL OF KALAMEINED DOORS |
OFFICES OF THE SECRETARY OF STATE NEW FINISH FLOORS |
SKETCH OF LATRINE FOR CAPITOL WORKMEN |
SKLIGHT IN PURCHASING COMMITTEE'S ROOM FISCAL SUPERVISORS OFFICE FIFTH FLOOR |
UNTITLED |
Folder 58 | 58 |
Contents |
---|
DETAIL OF DOOR BETWWEN ROOMS 213 & 214 ATTORNEY GENERALS OFFICE |
FOURTH FLOOR MEZZ FRAMING ALTERATIONS |
ALTERATIONS TO ELEVATOR SHAFT SOUTH OF CENTER SECTION |
ALTERATIONS TO 3RD STORY PLAN SHOWING 4TH FLOOR FRAMING |
ALTERATIONS & NEW WAINSCOTING IN ROOM 200 EXEC OFFICES |
Folder 59 | 59 |
Contents |
---|
GIRDERS G22-G27-G28-G29 |
GIRDERS G24-G25 ALTERATIONS |
GIRDERS G23 & G26 FOURTH FLOOR ALTERATIONS |
GIRDERS G14-G15-G16-G17 FIFTH FLOOR |
GIRDER G11 FIFTH FLOOR ALTERATION |
Folder 60 | 60 |
Contents |
---|
GIRDER G21 FIFTH FLOOR ALTERATIONS |
ALTERATIONS TO 4TH STORY PLAN SHOWING 5TH FLOOR FRAMING |
ALTERATIONS TO STATE CAPITOL BUILDING |
ALTERATIONS TO FIFTH FLOOR TRUSS T2 |
FIFTH FLOOR GIRDERS G12-G13-G19-G20 |
Folder 61 | 61 |
Contents |
---|
ALTERATIONS TO STATE CAPITOL |
GIRDERS G5 & G8 ALTERATIONS TO CEILING GIRDERS |
GIRDERS G6 & G7 ALTERATIONS TO CEILING GIRDERS |
UNTITLED |
ALTERATIONS TO 5TH STORY PLAN SHOWING CEILING FRAMING |
Folder 62 | 62 |
Contents |
---|
HIP RAFTERS HR1 TO HR6 TOWER ALTERATIONS |
UNTITLED |
UNTITLED |
UNTITLED |
BOOKSHELVES-ATTORNEY GENERAL'S OFFICE ROOM 208 |
Folder 63 | 63 |
Contents |
---|
VALLEYS ALTERATIONS |
CEILING GIRDERS G3-G4 ALTERATIONS |
COLUMNS C1-C2-C3-C4 ALTERATIONS |
ALTERATIONS TO FIRST SECOND & THIRD FLOOR FRAMING |
COLUMNS C5 TO C12 (INCL) ALTERATIONS |
Folder 64 | 64 |
Contents |
---|
ALTERATIONS TO GIRDERS G9-G10 |
STEEL FILING CASES FOR INSURANCE DEPT |
DETAIL OF DORMERS SOUTH WEST TOWER ALTERATIONS |
GIRDER G2 & PLATES P2-P3-P4 TOWER GIRDERS |
GIRDER G1 & PLATE P1 ALTERATIONS TOWER GIRDERS |
Folder 65 | 65 |
Contents |
---|
VALLYS & DORMER RAFTERS ALTERATION |
ALTERATIONS TO FRAMING IN NORTH & SOUTH ELEVATOR SHAFTS |
ALTERATION TO HIP RAFTERS R7R/L |
HIP RAFTERS ALTERATIONS |
ALTERATIONS TO ROOF FRAMING PLAN |
Folder 66 | 66 |
Contents |
---|
TOWER RAFTERS HANGERS ETC |
OFFICE PARTITION DEPT OF WEIGHTS & MEASURES ROOM 429 |
ALTERATIONS TO VALLYS & RAFTERS SOUTH WEST TOWER |
ALTERATIONS TO TEE PLAN |
ALTERATION TO SOUTH WEST TOWER & ROOFS EAST OF TOWER |
Folder 67 | 67 |
Contents | |||
---|---|---|---|
Accretion: 20916-07 |
|||
PROPOSED STEEL SHELVING FOR ATTORNEY GENERAL'S ROOM 210 | |||
Accretion: B0700-85 |
|||
PROPOSED STEEL FILES FOR ATTORNEY GENERAL'S ROOM 215 | |||
SCALE & FULL SIZE DETAILS OF 5TH STORY COURT WINDOWS | |||
DETAIL SECTION AT BASE OF WEST DORMERS | |||
EXTRA LINTELS OVER 5TH FLOOR ELEVATION OPENINGS |
Folder 68 | 68 |
Contents |
---|
DETAIL OF FLUES IN EAST CHIMNEY OF SOUTH WEST TOWER |
DOUBLE SWING DOOR IN PARTITION OF ROOM 121, STATE FIRE MARSHALL |
STEEL FILING CASE IN OFFICE OF FISCAL SUPERVISOR OF STATE CHARITIES |
ALTERATIONS TO INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES SOUTH SIDE ALSO CONCEALED PLUMBING WORK |
ALTERATIONS DETAILS OF INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES S SIDE ALSO CONCEALED PLUMBING WORK |
Folder 69 | 69 |
Contents |
---|
PLAN OF ST ARCHITECT'S OFFICE ON 4TH FLOOR |
STATE ARCHITECT'S OFFICE DETAILS OF CABINET |
ALTERATIONS TO NORTH & SOUTH BULKHEADS ON ROOFS EAST OF TOWERS |
FLOOR PLANS |
FLOOR PLANS |
Folder 70 | 70 |
Contents |
---|
PLAN OF STATE ARCHITECT'S OFFICE ON 5TH FLOOR |
NEW PARTITIONS FOR ROOMS 220 & 221 SECOND FLOOR |
DETAILS OF PLASTER CORNICE FOR ROOM 218 2ND FLOOR |
DETAILS OF SOUTH ELEVATOR SHAFT & DOORS TO SAME NORTH SHAFT |
ALTERATIONS TO FLOOR FRAMING OF TOILETS SHOWING POSITION OF FLOOR BEAMS |
ALTERATIONS RESTORING SANDSTONE & SKYLIGHT OVER SOUTH CORRIDOR WEST STAIRCASE FOURTH STORY |
Folder 71 | 71 |
Contents |
---|
RECONSTRUCTION OF CORRUGATED IRON DOORS FOR STORE ROOMS IN BASEMENT |
ALTERATIONS TO METAL WINDOW FRAMES SASH & GLAZING DETAILS |
ALTERATIONS TO SKETCH & DETAIL OF TERRA COTTA CRESTING ON MAIN ROOF AT N & S TOWERS |
ALTERATION TO HEATING & VENTILATION ELECTRIC-ATTIC FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION DETAILS OF STEAM WORK IN BASEMENT |
ALTERATIONS HEATING & VENTILATION DETAILS OF FLUES IN TOILET ROOMS |
Folder 72 | 72 |
Contents |
---|
ALTERATIONS HEATING & VENTILATION ELEVATIONS OF INDIRECT SYSTEM IN BASEMENT |
ALTERATIONS TO HEATING & VENTILATION DETAILS OF INTAKES & DUCTS |
ALTERATIONS TO HEATING & VENTILATION PLUMBING 4TH FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION PLUMBING 5TH FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION DETAILS OF STACKS DOORS & FLUES |
Folder 73 | 73 |
Contents |
---|
PLAN SHOWING LOCATION OF OFFICES OF STATE TREASURER & STATE BOARD OF TAX CMSNS |
ALTERATIONS TO ELECTRIC WORK WIRING TABLES |
EXIT FROM ROOM 609 & IRON STAIRS ATTIC |
DETAILS OF PLASTER CORNICE FOR ROOM 244 SECOND STORY |
REVISED DETAIL OF PLASTER CORNICE FOR ROOM 218 SECOND FLOOR FULL SIZE |
Folder 74 | 74 |
Contents |
---|
STRUCTURAL STEEL FOR MEZZANINE FLOOR REFINISHING ROOMS |
ALTERATIONS DETAILS OF INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES NORTH SIDE ALSO CONCEALED PLUMBING WORK IN MEZZANINE FL CONSTRUCTION RM |
REFINISHING OFFICES OF THE STATE TEASURERS 1ST FLOOR PLAN |
REFINISHING OFFICES FOR THE EXCISE DEPT IRON CIRCULAR STAIRCASE & MEZZANINE RAILING FOR ROOM 244 |
GLAZED PARTITIONS & TELEPHONE BOOTH REPAIRS IN OFFICES OF EXCISE DEPARTMENT |
Folder 75 | 75 |
Contents |
---|
NEW PARTITION IN ROOM 115 INSURANCE DEPT |
ALTERATIONS TO OPENINGS IN FLOOR OF ATTIC FOR CEILING LIGHTS IN CENTER SECTION |
REFINISHING OFFICES FOR THE STATE COMMISION IN LUNACY FIRST STORY |
DETAILS OF NEW WOOD WORK IN CONNECTION WITH REFINISHING ROOMS 135 & 234 |
ALTERATIONS DETAIL SHOWING VENTILATING DUCT FOR THE REAR ASSEMBLY LOBY 3RD FLOOR |
Folder 76 | 76 |
Contents |
---|
STATE ARCHITECTS OFFICE EQUIPMENT & FILING ROOM 403 |
FULL SIZE DETAILS OF NORTH & SOUTH BULKHEADS ON DOORS EAST OF TOWERS |
DETAIL OF KALAMINED DOOR |
ALTERATIONS OF STAIRS AND DOORS TO PROVIDE FOR ACCESS TO ATTIC FROM FIFTH FLOOR |
CIVIL SERVICE COMMISSION FLOOR PLAN OF OFFICES |
Folder 77 | 77 |
Contents |
---|
FINISHING OFFICES FOR LUNACY COMMISSION BRONZE SADDLES FOR DOORS ROOMS 124 126 127 |
NEW IRON STAIRS TO BASEMENT |
MOVING ELEVATOR TANK |
NEW PARTITION & ALTERATIONS TO CASE ROOM 413 |
REFINISHING REAR ASSEMBLY LOBBY |
Folder 78 | 78 |
Contents |
---|
CAPITOL REPAIRS ELECTRIC MANHOLE ENGINE ROOM |
SHAFTING SUPPORTS FOR PRESENT WATER FILTERING APPARATUS |
REFINISHING OFFICES OF THE EXCISE DEPARTMENT SECOND FLOOR |
FULL SIZED DETAIL OF PLASTER COVE IN TOILET ROOMS |
PAINTING, DECORATING & CERTAIN ALTERATIONS & REFINISHING OFFICES OF SUPERINTENDANT OF INSURANCE |
Folder 79 | 79 |
Contents |
---|
ALTERATIONS TO ST CAP ALBANY NY DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
ALTERATIONS ST CAP ALBANY NY DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
PLAN DETAIL OF SETTING & ANCHORING TERRA COTTA HIPS ALTERATIONS |
OFFICES-INSURANCE DEPT STEEL FITTING FOR OFFICE ROOM NO 117 |
OFFICES-INSURANCE DEPT STATE CAPITOL ALBANY NY STEEL FITTING FOR GENERAL OFFICE ROOM #117 PLANS AND DETAIL |
Folder 80 | 80 |
Contents |
---|
DETAILS OF ELEVATION SCREENS DOORS & CAR ALTERATIONS |
ELEVATIONS FOR THE STATE CAPITOL DETAILS OF ELEVATIONS PITS |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
Folder 81 | 81 |
Contents |
---|
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
REWIRING OF STATE CAP ALBANY NY ROOM NO 610 |
DETAIL OF RAIL & GATE BETWEEN ROOMS 244 & 245 EXCISE DEPT |
Folder 82 | 82 |
Contents |
---|
DETAILS OF DOOR & SCREEN BETWEEN ASSEMBLY REAR LOBBY & SPEAKERS ROOM |
REWIRING OF ST CAP ALBANY NY SPECIAL FITTINGS |
PRIVATE ELEVATOR FOR THE ST ARCHITECT'S OFFICE |
ALTERATIONS OF PARTION WORK IN ROOM 138 |
DUMBWAITER FOR ST ARCHITECT OFFICE |
Folder 83 | 83 |
Contents |
---|
WEST CORRIDOR 4TH FLOOR WEST ELEVATION |
F S D OF IRONWORK FOR CEILING CORNICE ROOM 342 |
TREASURERS OFFICE METAL FURNITURE |
PROPOSED PARTITION IN THE STATE ARCHITECTS PRIVATE OFFICE |
ROOM NO 260 PANELED PARTITION |
Folder 84 | 84 |
Contents |
---|
NEW BOOK SHELVES IN ROOM 200 EXECUTIVE OFFICES |
FINISHING ROOMS & CORRIDORS STONEWORK AROUND DOORS TO ROOMS 435, 436 & 437 |
SAFETY PLATES FOR ELEVATOR DOOR SADDLES |
PARTITION BETWEEN ROOMS 228 & 229 |
PLAN AND DETAILS OF PARTITION FOR ST HOSPITAL COMMISSION'S OFFICE RM 124 CAPITOL ALBANY NY |
Folder 85 | 85 |
Contents |
---|
ENTRANCE TO ASSEMBLY EAST & WEST CORRIDOR 3RD FLOOR 3/4 INCH DETAIL OF ARTIFICIAL STONE WORK CORRIDORS |
THIRD FLOOR & CORRIDORS PLANS SHOWING METHOD FOR SETTING GRANITE BASE COURSE |
FULL SIZE DETAIL REVISING PROFILE OF ARCHES OVER WINDOWS ROOM 337 |
DETAILS OF CAST IRON SADDLES FOR DOOR TO PRIVATE ELEVATOR ROOM 609 |
THIRD FLOOR NORTH CORRIDORS PLAN SHOWING METHOD FOR SETTING GRANITE BASE COURSE |
Folder 86 | 86 |
Contents |
---|
PLAN OF ARCH TO SENATE GALLERY MARK SG |
CHANGING ARCHED OPENING TO SQUARE HEADS ON 4TH FLOOR CORRIDORS |
PARTITION IN ROOM 609 |
FINISHING ROOMS & CORRIDORS LOCATION OF DISTRIBUTING BOXES J & I |
ALTERATIONS TO ELECTRIC WORK SECRETARY OF STATE OFFICES ROOMS 253-261 |
Folder 87 | 87 |
Contents |
---|
ALTERATION TO TOILET ROOM DOORS OPENING #401, 443, 507 & 536 |
ASSEMBLY CHAMBER-LOBBIES & OFFICES REPAIR TO CEILING BENCHES IN WOMEN'S GALLERY SPACES TO BE CARPETED |
FINISHING ROOMS & CORRIDOR |
CHANGING ARCHED DOOR OPENINGS TO SQUARE HEADS ON FOURTH FLOOR CORRIDORS |
CHANGING ARCHED OPENING 402 ON EAST CORRIDOR FOURTH FLOOR |
Folder 88 | 88 |
Contents |
---|
ASSEMBLY CHAMBER |
ALTERATION TO OFFICE OF SUPERINTENDENT OF PRISONS |
STEEL SUPPORTS FOR LIGHTING FIXTURES OF ASSEMBLY CHAMBER |
DETAIL OF DOORS TO STORE ROOMS UNDER WEST STAIRCASE FIRST FLOOR |
ENGINEERING WORK CAPITOL RECONSTRUCTION CHANGES TO EXHAUST AND STEAM PIPING IN BASEMENT |
FINISHING ROOM 608 |
Folder 89 | 89 |
Contents |
---|
EAST CORRIDOR FOURTH FLOOR WEST SIDE |
NEW STEEL LOCKERS ARCHITECTURAL DRAUGHTING RM STATE ARCHITECTS OFFICE |
DETAIL OF CEILING LIGHT ROOM 608 |
FS PROFILE OF CORNICE UNDER SOUTH MEZZANINE THIS DWG REVISES PROFILE SHOWN ON DWG 520 |
DETAILS KALAMEIN ELEVATOR DOORS |
Folder 90 | 90 |
Contents |
---|
FIXTURE DRAWING NO 2003 |
FIXTURE DRAWING NO 2015 |
FIXTURE DRAWING NO 2001 |
FICTURE DRAWING 2016 |
THIRD STORY PLAN |
Folder 91 | 91 |
Contents |
---|
CAPITOL ASSEMBLY SIDE PLAN OF ROOMS 303-4 & 5 3RD FLOOR |
UNTITLED |
LEATHER BACKS PERFORATED LEATER SEAT |
UNTITLED |
PLAN OF ALTERATIONS & FILING CASES OF ROOMS 204,205, & 206 |
FOURTH STORY PLAN |
FIFTH STORY PLAN |
Folder 92 | 92 |
Contents |
---|
PUBLIC SERVICE CMSN DISTRICT #2 CHANGES IN PARTITIONS IN SECRETARY'S OFFICES RM #104 |
FIXTURE DRAWING NO 2004 |
FIXTURE DRAWING NO 2002 |
FIXTURE DRAWING NO 2007 |
FIXTURE DWGS 2008, 2009, 2010, 2011, 2012, 2013, AND 2014 |
Folder 93 | 93 |
Contents |
---|
SUPPORT FOR MARBLE FIREPLACE MANTLE, MANTLE IN ROOM 342 |
DETAIL OF TWO TIE RODS ON TRUSS ROOM 608 |
NEW PARTITION FOR ROOM 139 DEPT OF PUBLIC BLDGS |
RENEWING STONEWORK WEST STAIRCASE CORRIDOR FOURTH FLOOR |
GROIN ARCH CEILINGS WEST STAIRCASE CORRIDOR THIRD FLOOR |
Folder 94 | 94 |
Contents |
---|
RENEWAL OF STONEWORK THIRD & FOURTH FLOORS |
NY STATE CAPITOL BLDG ALBANY, NY |
ENLARGED DOOR OPENINGS TO 4TH FLOOR & 5TH FLOOR TOILETS |
FINISHING ROOMS & CORRIDORS |
DETAIL OF DOOR JAMBS FOR GLASS CONTRACTORS INFORMATION IN CUTTING GLASS FOR DOOR REVEALS IN TOILET ROOMS |
Folder 95 | 95 |
Contents |
---|
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Folder 96 | 96 |
Contents |
---|
PLANS & SECTIONS OF ROOMS 337 A & B FINISHING CERTAIN RMS & CORRIDORS IN THE THIRD STORY |
ALTERATIONS & FINISH OF 4TH FLOOR ROOMS 407-408 -409 |
DEPT OF ARCHITECTURE FILING CASES FOR ROOM 608 |
BASE & FLOOR CONSTRUCTION ROOMS 337 A & B FINISHING RMS & CORRIDORS THIRD FLOOR |
FINISHING 5TH FLOOR ROOMS FOR NY STATE DEPT OF HEALTH |
Folder 97 | 97 |
Contents |
---|
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH |
FILING CASES & DRAWERS DEPT OF ARCHITECTURE RM 609 |
FINISHING ROOMS & CORRIDORS NORTH STAIR MARBLE MARBELITAIC LAYOUT |
3/4 IN SCALE DETAIL OF TOWER STAIRWAYS MEZZ TO SIXTH FLOOR |
FINISHING ROOMS & CORRIDORS |
Folder 98 | 98 |
Contents |
---|
ALTERATIONS FOR ROOM 426 |
SEATS IN SENATE CHAMBER |
FINISHING ROOMS & CORRIDORS DETAIL OF MEZZ LANDINGS |
DETAILS OF LOUVER VENTILATOR FOR SENATE & HEALTH DEPT VENTILATING SYSTEM |
FINISHING CERTAIN ROOMS & CORRIDORS DETAIL OF CI FASCIAS AT WINDOW ROOMS 337-A & B |
NEW TRANSOM BAR DOOR BETWEEN ASSEMBLY CLERK'S OFFICES |
Folder 99 | 99 |
Contents |
---|
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH CEMENT INCLINE & RAILING |
DETAIL OF FRAMES FOR TEMPORARY GATES IN CORRIDORS |
DETAILS OF BULLETIN BOARD & FIREBACKS FOR ROOMS 332 337 342 |
INSURANCE DEPT BOOKCASES FOR ROOMS J & RR IN BASEMENT |
FSD OF DOORS IN TOILET ROOM OF HEALTH DEPT |
Folder 100 | 100 |
Contents |
---|
GATE & SHELF FOR THE ASSEMBLY DOCUMENT ROOM |
LONGITUDINAL SECTION OF SENATE CHAMBER LOOKING SOUTH |
FIRST FLOOR ROOM #152 |
NEW QUARTERS FOR STATE DEPT OF HEALTH CONROY MARBLE & TILE WORKS TROY, NEW YORK |
FURNITURE LAYOUT FOR DEPT OF LABOR |
Folder 101 | 101 |
Contents |
---|
FURNITURE LAYOUT FOR THE DEPT OF LABOR |
DETAIL FOR MARBLE SILLS W CORRIDOR |
ALTERATIONS REPAIRS & PAINTING SECRETARY OF STATES OFFICES |
PARTITION ETC ROOM 122 ATTORNEY GENERAL'S OFFICE |
SUPPLY CASE CONSERVATION CMSN |
Folder 102 | 102 |
Contents |
---|
FINISHING 5TH FLOOR ROOMS FOR NYST DEPT OF HEALTH NEW KALAMEIN FRAME AND SASH RMS 4 AND 11 |
ALTERATIONS TO THE STATE TREASURER'S OFFICE ROOMS 135 136 137 |
ALTERATIONS & REPAIRS TO ROOMS 100 - 109 INC DEPT OF PUBLIC WORKS |
METAL EQUIPTMENT FOR THE STATE TAX COMMISSION |
PLAN OF 4TH FLOOR NORTH WEST SHOWING LAY-OUT OF METAL FILING CASES FOR THE STATE BOARD OF TAX COMM |
Folder 103 | 103 |
Contents |
---|
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQUIPMENT FOR THE TAX COMMISSION |
METAL EQUIPMENT FOR THE TAX COMMISSION |
Folder 104 | 104 |
Contents |
---|
METAL EQPT FOR THE STATE TAX COMMISSION |
SECTION C ALTERATIONS TO ROOM 329 FOR THE STATE JUDICIARY COMMITTEE |
CEILING PLAN OF SENATE CHAMBER |
ALTERATIONS IN EXECUTIVE OFFICES |
Folder 105 | 105 |
Contents |
---|
ALTERATIONS IN EXECUTIVE OFFICES DETAIL OF STAIRWELL |
NEW DOOR OPENING WINDOW GUARD ETC ROOM 152 FOR THE US POST OFFICE |
CONSTRUCTION OF SKYLIGHTS ROOMS 444 & 445 |
SHOW CASE 2ND FLOOR CAP G A R RMS |
REVOLVING DOORS SENATE CHAMBER ENTRANCES |
Folder 106 | 106 |
Contents |
---|
ROOM 609A TOILETS LOCKER AND DARK ROOM |
METAL FILING CASES & SHELVING DEPT OF ARCHITECTURE ROOM 609 |
WATERPROOFING OF & TILE ROOF FOR NORTH & SOUTH PORTICO'S |
NEW METAL CASE FOR THE DEPT OF HEALTH ROOM 606 |
ALTERATIONS IN OFFICES OF THE SUPT OF PRISONS |
Folder 107 | 107 |
Contents |
---|
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF ROOMS 204-205 AND 206 |
ALTERATIONS TO OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
ALTERATIONS TO OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF RMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF RMS 204-205 & 206 |
Folder 108 | 108 |
Contents |
---|
TEMPORARY PLATFORM ASSEMBLY CHAMBER |
METAL FURNITURE & EQPT OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXECUTIVE STAFF RMS 204-205 & 206 |
ENGINEERING WORK ALTERATIONS AND REPAIRS TO THE OFFICES OF THE EXECUTIVE STAFF SANITARY ELEC SPEC NO HEAT-2553 SANT'Y-2554 ELEC-2555 |
RE-ARRANGEMENT OF SENATE POST OFFICE AND FINANCIAL ROOMS |
Folder 109 | 109 |
Contents |
---|
NEW PARTITION IN REAR OF SPEAKERS LOBBY ASSEMBLY CHAMBER |
NEW GLAZED PARTITION ROOM 242 EXCISE DEPT |
REPAIRS PAINTING ROOM ETC 151 ASSEMBLY MAILING DEPT (ASSEMBLY CHAMBER REPAIRS ETC.) |
TAX COMMISSION OFFICE REARRANGEMENT OF EXISTING PARTITIONS (ALSO NEW PARTITION) |
REARRANGEMENT OF SENATE POST OFFICE & FINANCIAL ROOMS |
Folder 110 | 110 |
Contents |
---|
ELEVATION METAL FURNITURE NYS DEPT OF HEALTH ROOM 607 |
PARTITION & COAT CLOSET ROOM 217 |
CONSTRUCTION OF SKYLIGHTS ROOMS 444 & 445 |
ALTERATIONS TO ROOMS 414-415 & 416 FOR THE COURT OF CLAIMS |
Folder 111 | 111 |
Contents |
---|
STORM SASH FOR ROOM 332 |
ENGINEERING WORK RECONSTRUCTION OF FORMER COURT ROOM #315 FOR LEGIS COMMITTEE HEARING |
ELEVATION SCHEME B PROPOSED STORM SASH OFFICE OF THE STATE ARCHITECT FOR WINDOWS |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
Folder 112 | 112 |
Contents |
---|
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
STEEL FILING CASES & LOCKERS ROOM 345 ASSEMBLY PRINTING AND ENGROSSING BILLS |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
Folder 113 | 113 |
Contents |
---|
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXEC STAFF |
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR EXECUTIVE OFFICES |
METAL FURNITURE & EQUIPMENT FOR THE OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
Folder 114 | 114 |
Contents |
---|
METAL FURNITURE & EQPT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXEC STAFF |
PLAN OF GROUNDS NORTH WESTERLY CORNER |
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXEC STAFF |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXEC STAFF |
Folder 115 | 115 |
Contents |
---|
CONSTRUCTION IN ROOM 135 |
CONSTRUCTION ALTERATIONS TO ROOM 132 |
CONSTRUCTION ALTERATIONS TO ROOM 132 DETAIL OF DOOR BETWEEN ROOMS 132-133 |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
Folder 116 | 116 |
Contents |
---|
DEPT OF ARCHITECTURE BOOKCASE FOR PRIVATE OFFICE |
RELAYING FLOOR ROOM 118 |
CONSTRUCTION STORM WINDOWS FOR ROOM 409 |
CONSTRUCTION ALTERATIONS TO ROOM 414A OCCUPIED BY THE CLERK OF CLAIMS |
CONSTRUCTION NEW METAL PARTITIONS ROOMS 430 - 431 |
ENGINEERING WORK CONVERTING WEST SIDE LOBBY INTO OFFICE FOR EXCISE DEPARTMENT |
Folder 117 | 117 |
Contents |
---|
PARTITION IN OFFICE OF MINORITY LEADER OF THE ASSEMBLY ROOM 340 |
WROUGHT IRON FENCE AROUND MONUMENT |
ALTERATIONS CONVERTING ROOM 238 INTO A STORE ROOM FOR USE OF THE EXCISE DEPT |
SOUNDING BOARD FOR ASSEMBLY CHAMBER |
CONSTRUCTION OF PIT ELEC ELEVATORS EAST END |
Folder 118 | 118 |
Contents |
---|
ALTERATIONS TO MEN'S TOILET 5TH FLOOR EAST |
CONSTRUCTION ALTERATION AT FIRST FLOOR ASSEMBLY ELEVATOR DOORS ELEC ELEVATORS EAST END |
CONSTRUCTION MENS TOILET 5TH FLOOR EAST DETAIL OF PARTITION CAP & DOOR TO PORTERS CLOSET |
PLANS FOR CARPETING ROOMS 201-201A-202-203 |
CONSTRUCTION PICTURE MOULD ON SOUTH WALL OF CONFERENCE ROOM |
Folder 119 | 119 |
Contents |
---|
CASES FOR STANDARDS & FLAGS MUSEUM |
METAL EQPT OFFICE OF STATE COMPTROLLER INCOME TAX BUREAU |
CONSTRUCTION METAL FILING CASE ROOM 607 DEPT OF HEALTH |
NEW CASES FOR LIBRARY OFFICE ATTORNEY GENERAL |
STORM SASH FOR ROOMS 341 & 342 |
Folder 120 | 120 |
Contents |
---|
FILE ROOM STATE DEPT OF HEALTH |
CONSTRUCTION-STEEL FILES-(STEEL FILES AND MEZZ CONSTRUCTION)- INSURANCE DEPT ROOMS 120 & 121 |
CONSTRUCTION-EXTENDING PARTITIONS TO CEILING ROOM 124 OFFICES OF STATE HOSPITAL CMSN |
FILE ROOM DIVISION OF VITAL STATISTICS STATE DEPT OF HEALTH DATA DWG SHOWING FLOOR LOADS & 5TH FLOOR CONSTRUCTION |
UNTITLED |
Folder 121 | 121 |
Contents |
---|
BASEMENT & FIRST FLOOR NORTH CORNER OF CAPITOL TUNNEL TO STATE OFFICE |
CONSTRUCTION RAILING ROOM 137 STATE TREASURER'S OFFICE |
METAL FILING CASES OFFICES OF STATE COMPTROLLER INCOME TAX BUREAU |
RECONSTRUCTION, PARTITIONS IN ROOMS 248 & 249 (OFFICES COURT OF CLAIMS) |
FOURTH AND FIFTH FLOOR PLAN |
Folder 122 | 122 |
Contents |
---|
RECONSTRUCTION, REPAIRS & EQUIPTMENT, PARTITIONS IN ATTORNEY GENERAL'S OFFICE RM 244 |
RELAYING ROOMS 204-205 EXECUTIVE CHAMBER (CAPITOL RECONSTRUCTION REPAIRS & EQUIPMENT) |
NEW PARTITION IN ROOM NO 433 FOR TAX DEPT |
STORM WINDOWS FOR ROOM 626 |
RELAYING FLOORS IN ROOMS 204-205 EXECUTIVE CHAMBER (CAPITOL RECONSTRUCTION REPAIRS & EQUIPMENT) |
Folder 123 | 123 |
Contents |
---|
CAPITOL RESTAURANT CONSTRUCTION DETAIL OF ICE BUNKER |
CONSTRUCTION CAPITOL RESTURAUNT CONSTRUCTION NY STATE CAPITOL WOOD CLEATS & SHELVING IN KITCHEN AT DISH SLIDE OPENINGS |
NEW GLAZED PARTIONS IN ROOMS NO 601 & 603 PLANS ELEV SECTIONS & FSD |
ALTERATION & EXTENSION OF ROOM 404 FLOOR PLAN SCALE DETAIL OF PARTITION, CASE AND CUPBOARD |
LEGISLATIVE REPORTERS ROOMS-REPAIRS & IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF NY STATE CAPITOL-PLAN SHOWING POSITION OF STEEL LOCKERS |
Folder 124 | 124 |
Contents |
---|
ALTERATIONS TO MEZZANINE FLOOR STATE DEPT OF ARCHITECTURE ROOM NO 409 |
LAYOUT OF TELEGRAPH OFFICES ON 3RD FLOOR |
LEGISLATURE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
PRESENT TELEGRAPH OFFICES ON 3RD FLOOR |
LAYOUT OF TELEGRAPH OFFICES 3RD FLOOR |
LEGISLATIVE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
UNTITLED |
Folder 125 | 125 |
Contents |
---|
LOUNGE PARTITION CAP FS THIS DWG IS TO SUPERCEDE LOUNGE CAP DWG SHOWN ON DWG SHEET 1099 |
LEGISLATIVE REPORTERS ROOM ( REPAIRS & IMPROVEMENTS TO ROOMS ON 3RD FLOOR ) CONSTRUCTION REVISED DETAIL OF AIR WELL & LETTER BOXES |
PLAN OF LOUNGE EQUIPMENT |
LEGISLATIVE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
Folder 126 | 126 |
Contents |
---|
REMODELING ROOM OF TRANSFER TAX BUREAU CEILING PLAN UNDER BALCONY ROOM 416 & DETAIL OF CELATEX PANELING |
NEW DOORS FOR ADDITIONAL TELEPHONE BOOTH IN SPACE UNDERNEATH STAIRS TO LOUNGE |
DEPT OF HEALTH NEW GLAZED PARTITIONIN ROOM NO 606 PLAN ELEVATION SECTION & FULL SIZE DETAILS |
CIVIL SERVICE COMMISION ALTERATIONS TO STAIRS ROOM 410-412 |
CONSTRUCTION CIVIL SERVICE COMMISSION ALTERATIONS TO STAIRS ROOMS 410 & 412 |
Folder 127 | 127 |
Contents |
---|
PLAN OF ROOM NO 409 SHOWING POSTIONS OF PARTIONS NOW LOCATED IN ROOM NO 122 |
STATE TAX DEPT REMODELING OF ROOMS TRANSFER TAX BUREAU RMS 416 418 419 420 |
REPAIRS AND EQUIPMENT FIRE SYSTEM PUMPS PIPING SANITARY WORK BASEMENT PLAN |
UNTITLED |
CIVIL SERVICE COMMISSION PLAN OF ROOM 410 SHOWING LOCATION OF PARTITIONS |
STATE TAX DEPT REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
Folder 128 | 128 |
Contents |
---|
STATE TAX DEPT REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
CONSTRUCTION DEPT OF ARCHITECTURE METAL FILE CASES ROOMS # 405 608 609 |
REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
DEPT OF ARCHITECTURE LOCKING DEVISE FOR METAL FILING CASE RM 609 |
Folder 129 | 129 |
Contents |
---|
CONSTRUCTION ALTERATIONS TO RM 320 |
LABEL- HOLDERS FOR METAL FILE CASES IN ROOMS NO 405, 606, 609 |
EXECUTIVE DEPT DIV OF THE BUDGET ELECTRIC WORK ALTERATIONS ROOM 111 |
EXECUTIVE DEPT DIV OF THE BUDGET ELECTRIC WORK ALTERATIONS RM 112 |
ALTERING PARTITION UNDER STAIRS NORTH WEST CORNER FOURTH FLOOR FOR TELEPHONE SWITCHBOARD |
Folder 130 | 130 |
Contents |
---|
HEATING REPAIRS & ALTERATIONS TO 4TH FLOOR |
PARTITION AROUND CHIMNEY? PUMP & PARTITION IN ? ( AIR CONDITIONING ) |
ALTERATIONS TO ROOM 321 |
PLAN SECTION ELEVATION DETAILS & SPECS FOR NEW BOOK CASES |
BASEMENT PLAN AT ENTRANCE FROM CAPITOL |
Folder 131 | 131 |
Contents |
---|
CONSTRUCTION DETAIL OF EASELS TYPE A-B-C |
TRACING FROM A DWG OF THE BUREAU OF ENGINEERING CITY OF ALBANY NY PROPOSED CHANGE IN ALIGNMENT OF SOUTH SWAN STREET BETWEEN WASHINGTON AVE & STATE |
CONSTRUCTION FS DETAIL OF TILE RIDGE & COPING |
DATA DWG SECOND FLOOR TOWER ROOM IN THE CAPITAL (FLAG RM) |
EQUIPTMENT ARRANGMENT IN ROOMS NOS 133 & 134 FOR STATE TAX DEPT |
Folder 132 | 132 |
Contents |
---|
CONSTRUCTION FLOOR PLAN OF LABORATORY STANDARDS & PURCHASE |
STATE BOILER HOUSE CONTSTRUCTION REPAIRS TO BOILER HOUSE NEW ROLLING STEEL DOORS DWG # 104 |
CONSTRUCTION NEW TOILET ROOM ON FOURTH FLOOR |
CONSTRUCTION NEW TOILET ROOM ON FOURTH FLOOR PLAN & DETAILS |
CONSTRUCTION PLAN OF FOURTH FLOOR SHOWING NEW OFFICE PARTITIONS REMOVALS WALL & FLOOR AREAS |
Folder 133 | 133 |
Contents |
---|
REMODELING ELECTRIC LIGHTING FIXTURES EAST APPROACH STATE |
COSTRUCTION REPAIRS & ALTERATIONS NEW PARTITONS IN ROOM # 218 ATTORNEY GENERAL'S OFFICE PLAN |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
ELECTRIC REPLACEMENT OF ELECTRICWORK EAST SECTION INTERIOR FIXTURE FOR ASSEMBLY LOBBY |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
Folder 134 | 134 |
Contents |
---|
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
DETAILS OF JAMB |
REVISED JAMB SECTION FOR OPENINGS 2D/7, 2D/8, 2D/9 WEST DOORWAYS SCHEME NO 2 |
4TH FLOOR EAST CORRIDOR |
Folder 135 | 135 |
Contents |
---|
REVISED DETAILS OF OPENING NO 2D/201 REVISED FROM DRAWING 63/500 |
REVISED DETAILS OF OPENINGS W2/205 AND 2D/205 |
REVISED DETAILS AT OPENING OF ELECTRIC SERVICE ROOM (DOOR 2D/204A) FROM THAT SHOWN ON DWG 63/498 |
PLAN OF ROOMS 246 AND 247 |
UNTITLED |
Folder 136 | 136 |
Contents |
---|
ALTERATIONS ROOM NO'S 427 & 428 PALNS SECTIONS DETAILS |
SENATE ROOM 325 |
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) STRUCTURAL DETAILS |
SECOND FLOOR PLAN |
ALTERATIONS (BOOKCASES) TO ROOMS 333 AND 334 |
Folder 137 | 137 |
Contents |
---|
SENATE ALTERATIONS TO EXISTING RMS 331 TO 336 INCL. DETAIL OF BOOKCASES |
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) NORTH WALL & ENTRANCE DOOR DETAILS |
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) MISCELLANEOUS DETAILS |
CONSTRUCTION SENATE ALTERATIONS TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) PLANS, ELEVATION, SECTIONS & SCHEDULES |
4TH FLOOR SENATE |
Folder 138 | 138 |
Contents |
---|
ALTERATIONS AT THIRD FLOOR PLANS |
ALTERATIONS AT FIFTH FLOOR SECTION |
ALTERATIONS AT FIFTH FLOOR SECTION |
ASSEMBLY ALTERATIONS AT FOURTH FLOOR PLANS |
F.S. SECTION THRU. "D-D" (AFTER ALTERATION) |
Folder 139 | 139 |
Contents |
---|
PROPOSED OFFICES AND STORE ROOM OVER OPEN COURT AT THIRD AND FOURTH FLOOR LEVEL |
PROPOSED OFFICES AND STORE ROOM OVER OPEN COURT AT THIRD AND FOURTH FLOOR LEVELS |
1/2 PLAN OF GARAGE UNDER CAPITOL STEPS |
UNIDENTIFIED FINISH DETAIL |
REVISION ROOM 205A TOILET |
Folder 140 | 140 |
Contents |
---|
SENATE CONSTRUCTION BIRD CONTROL ABOVE 2ND FLOOR PORTIONS OF SOUTH & WEST ELEVATION |
INSTALLATION OF DOOR, TRIM-ETC. BETWEEN ROOM 207A & HALL |
SEC. THRU EAST PORCH AND BASEMENT TO TOWER FOUNDATIONS ON CENTER OF BUILDING LOOKING TOWARD STATE ST |
ALTERATIONS TO EXISTING DOOR |
PROPOSED ENTRANCE UNKNOWN LOCATION |
Folder 141 | 141 |
Contents |
---|
OFFICE SPACE ADDITION 1ST FLOOR MEZZANINE PLAN |
OFFICE SPACE ADDTION 2ND & 3RD FLOOR PLAN & 2ND FLOOR MEZZANINE PLAN |
OFFICE SPACE ADDITION NORTH ELEVATION |
OFFICE SPACE ADDITION SECTION A |
OFFICE SPACE ADDITION 1ST FLOOR PLAN |
Folder 142 | 142 |
Contents |
---|
UNTITLED |
REJECTED PLAN OF CEILING IN FLAG ROOM |
FLAG ROOM |
CONSTRUCTION LOCATION OF BRONZE DOORS TO BE INSTALLED IN FLAG ROOM SHOWS EXISTING CONDITIONS AND REVISED CONDITIONS |
PROPOSED PANELLING TREATMENT UNKNOWN ROOM |
Folder 143 | 143 |
Contents |
---|
CONSTRUCTION PLANS ELEVATIONS SECTIONS & DETAILS REVISION TO ROOM NO. 344 |
REVISED JAMB SECTION FOR OPENINGS 2D/7, 2D/8, & 2D/9 WEST DOORWAYS |
PROPOSED STORAGE UNITS FOR ASSEMBLY TELEPHONE ROOM NO 303 |
CONSTRUCTION & HEATING REHABILITATION OF FLAG ROOM SECOND FLOOR REVISED PLAN OF FLAG RM FROM THAT SHOWN ON DWG NO 63/499 |
PROPOSED PANELLING TREATMENT UNKNOWN ROOM |
Folder 144 | 144 |
Contents |
---|
CAPITOL ROOM 329 SCHEME "B" WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "C" ALL NEW WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "A" WOOD PANELLING TO TOP OF DOOR TRIM |
CONSTRUCTION PLAN SECTIONS & DETAILS REVISION TO ROOM NO 344 SCHEME "A" |
SENATE-PART 3RD FLOOR PLAN |
CONSTRUCTION ALTERATIONS TO RM 248 PLAN, SECTIONS & DETAILS |
Folder 145 | 145 |
Contents |
---|
CAPITOL ROOM 329 SCHEME "A" WOOD PANELLING TO TOP OF DOOR TRIM |
CAPITOL ROOM 329 SCHEME "B" WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "C" ALL NEW WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CONSTRUCTION PLAN, SECTIONS ELEVATIONS & DETAILS, ADDITIONAL OFFICE 4TH FLOOR, ROOM 4H |
Folder 146 | 146 |
Contents |
---|
CONSTRUCTION BULLET PROOF PARTITIONS IN SENATE GALLERY |
PRELIMINARY STUDY OF PEDESTRIAN BRIDGE IN MAIN COURT |
PROPOSED DELIVERY AREA UNDER PROMENADE DECK TO BASEMENT |
PLAN, ELEVATION & SECTION PROTECTION FOR INNER COURT VENTILATIOR HOODS |
PROPOSED HAND RAILING FOR GRAND STAIRCASE |
Folder 147 | 147 |
Contents |
---|
CONSTRUCTION REHABILITATION OF ASSEMBLY FISCAL OFFICE ROOMS 310 & 311 |
PROPOSED REVISED OFFICE LAYOUTS |
PROPOSED REVISED OFFICE LAYOUT FOR ROOM 250 |
CONSTRUCTION TUNNEL DETAILS PLAN AND SECTIONS |
PROPOSED REVISED OFFICE LAYOUTS |
Folder 148 | 148 |
Contents |
---|
CONSTRUCTION & ELECTRIC PLANS ELEVATIONS SECTION EXECUTIVE PRESS SECRETARY TELETYPE SPACE SECOND FLOOR |
CONSTRUCTION & ELECTRIC PLAN & DETAILS ASSEMBLY OFFICE ROOM 436M |
CONSTRUCTION PLANS ELEVATIONS SECTIONS & DETAILS RENOVATION SENATE OFFICE ROOMS NOS 334 & 335 |
CORRECT VENTILATION LIBRARY ASSEMBLY PLAN, ELEVATIONS, SECTIONS AND DETAILS |
CONSTRUCTION PLANS & SECTION |
CONSTUCTION AND ELECTRIC REHAB RMS 246 SECOND FLOOR AND 246, 247, 248 MEZZANINES PLANS SECTIONS AND DETAILS |
RENOVATIONS TO ASSEMBLY ROOM NO 151, CONSTRUCTION AND ELECTRIC PLAN SECTION AND LOCATION PLAN |
Folder 149 | 149 |
Contents |
---|
AIR CONDITIONING & HEATING ALTERATIONS TO QUARTERS OF LEGISLATIVE CORRESPONDENTS ASSOC 3RD FLOOR AND MEZZ PLANS AND SECTIONS |
AIR CONDITIONG & HEATING ALTERATIONS TO QUARTERS OF LEGISLATIVE CORRESPONDENTS ASSOC 3RD FLR AND MEZZ ADDENDUM TO DWG 52/2154 |
FOURTH STORY PLAN |
FIFTH STORY PLAN |
ROOF FRAMING PLAN |
THIRD STORY PLAN |
Folder 150 | 150 |
Contents |
---|
PART SECOND FLOOR PLAN |
WESTERN APPROACH |
Folder 151 | 151 |
Contents |
---|
ROOM 311 ALTERATIONS FOR MEN'S TOILET & 1ST AID STATION ROOM 312 ALTERATIONS & IMPROVEMENTS PLANS SCHEDULE SECTIONS DETAILS PAINTING PROJECT |
CONSTRUCTION LEGISLATIVE CORRESPONDENT ASSOC ROOM ALTERATIONS SECTIONS & DETAILS PAINTING PROJECT |
CONSTRUCTION LEGISLATIVE CORRESPONDENTS ASSOC ROOM ALTERATIONS PLANS & DETAILS PAINTING |
PLAN OF SEATS IN SENATE CHAMBER |
Folder 152 | 152 |
Contents |
---|
ALTERATIONS TO SENATE PORTION OF CAPITOL NORTH WEST PORTION OF 3RD FLOOR SOUTH WEST PORTION 3RD AND 4TH FLOORS AND CLG OVER GRAND STAIR |
EAST FRONT DETAIL OF GABLE (FRONT) NO 2 |
EAST FRONT DETAIL OF GABLE (FRONT) NO. 2 |
EAST FRONT DETAIL OF GABLE (FRONT) |
Folder 153 | 153 |
Contents |
---|
LONGITUDINAL SECTION OF PORTICO ON WASHINGTON AVE - PLAN OF LONGITUDINAL SECTION OF PORTICO ON STATE STREET |
GIRDER FOR TOWER ROOF |
GROUND FLOOR PLAN NORTH SIDE |
ENTRANCE FLOOR PLAN NORTH SIDE |
PRINCIPAL FLOOR PLAN NORTH SIDE |
Folder 154 | 154 |
Contents |
---|
NEW STATE CAPITOL ALBANY NY EAST HALF OF LONGITUDINAL SECTION |
WEST ENTRANCE & STAIRCASE HALLS |
NO 9 |
FIRST FLOOR NORTH WEST 779 |
EAST HALF OF LONGITUDINAL SECTION |
Folder 155 | 155 |
Contents |
---|
SECOND FLOOR PLAN SECOND FLOOR NORTH WEST DWG 7 WIRING PLAN |
SECOND FLOOR |
FIRST FLOOR NORTH EAST 779 |
EAST ELEVATION NORTH ELEVATION & SECTION SOUTH WEST TOWER |
WEST ELEVATION SOUTH ELEVATION SOUTHWEST TOWER |
Folder 156 | 156 |
Contents |
---|
WESTERN STAIRCASE SECTION ON LINE G.H. NO 10 |
SECTION ON LINE D EASTERN APPROACH DETAILS |
ATTIC FLOOR PLAN |
798-44 |
BASEMENT FLOOR PLAN |
Folder 157 | 157 |
Contents |
---|
818-1 |
WESTERN STAIRCASE PLAN OF GALLERY FLOOR |
IN SCALE SECTION ON LINE E. F. WESTERN STAIRCASE |
PLAN OF ELELCTRIC LIGHTING EASTERN APPROACH LOBBY & TOWER |
ATTIC FLOOR PLAN |
Folder 158 | 158 |
Contents |
---|
FOUNDATION PLAN OF NORTH PORTICO |
PLAN OF SOUTH PORTICO |
UNTITLED |
EAST FRONT DETAIL OF GABLE FRONT #2A |
BASEMENT FLOOR PLAN |
Folder 159 | 159 |
Contents |
---|
EAST FRONT DETAIL OF GABLE (FRONT) #2 |
798-37 |
PLAN OF NORTH PORTICO |
ENTRANCE FLOOR PLAN |
ELEVATION NORTH TERRACE |
Folder 160 | 160 |
Contents |
---|
SCALE DETAIL OF TERRA COTTA FINIALS FOR ROOF OF EAST CENTER SECTION |
SECTION ON LINE D EASTERN APPROACH DETAILS |
PLAN & SECTIONS OF SENATE FIRE PLACE FLUE E |
GALLERY FLOOR PLAN |
DORMER ON EAST FRONT |
Folder 161 | 161 |
Contents |
---|
SECTION THROUGH EAST ENTRANCE (TAKEN OF CENTER LINE LOOKING S) |
UNTITLED |
UNTITLED |
WEST GABLE |
DOMERS ON CURTAIN WALL ASSEMBLY CHAMBER FRONT |
Folder 162 | 162 |
Contents |
---|
DETAIL OF STONE DORMERS ON NORTH FRONT ASSEMBLY CHAMBER |
WESTERN STAIRCASE ON LINE A-B NO 7 |
BASEMENT FLOOR |
ONE HALF SCALE DWG OF DOME CEILING IN TOWER |
WESTERN STAIRCASE SECTION ON LINE A-B LOOKING SOUTH |
Folder 163 | 163 |
Contents |
---|
WEST STAIRCASE SECTION ON LINE E-F LOOKING E |
WEST STAIRCASE GROUND FLOOR |
UNTITLED |
GALLERY FLOOR DETAILS, WESTERN STAIRCASE 1/4 PLAN |
DETAILS OF S.E. STAIRCASE (SECTION C-D) |
Folder 164 | 164 |
Contents |
---|
FOUNDATION PLAN OF EASTERN APPROACH |
ROOF PLAN |
ELEVATION OF NORTH & SOUTH SIDE OF STAIRCASE GALLERY FLOOR DETAILS |
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
ONE INCH SCALE SECTION THROUGH EAST ENTRANCE GROUND FLOOR LOOKING EAST |
Folder 165 | 165 |
Contents |
---|
ELEVATION ON LINE H 798-7 |
ELEVATION ON LINE E 798-3 |
SECTION ON LINE C |
SECTION ON LINE C 798-10 |
GALLERY FLOOR PLAN |
Folder 166 | 166 |
Contents |
---|
SECTION THROUGH TOWER LOOKING EAST |
WESTERN STAIRCASE PLAN OF GROUND FLOOR NO 3 |
SOUTH ELEVATION NORTH CORIDOR WESTERN STAIRCASE SECTION THROUGH NORTH CORRIDOR LOOKING EAST |
SECTION THROUGH SOUTH CORRIDOR LOOKING EAST SECTION THROUGH SOUTH CORRIDOR LOOKING SOUTH |
SECTIONS OF ASSEMBLY STAIRCASE AS ORIGINALLY COSTRUCTED |
Folder 167 | 167 |
Contents |
---|
WESTERN STAIRCASE SECTION ON LINE P-Q #11 |
WESTERN STAIRCASE PLAN OF ENTRANCE FLOOR #4 |
LONGITUDINAL SECTION OF CENTRAL READING ROOM |
FOUNDATION PLAN OF EASTERN APPROACH |
SECTION ON LINE B 798-50 |
Folder 168 | 168 |
Contents |
---|
SECTION ON LINE B |
DETAIL OF EASTERN APPROACH ELEVATION SECTION ON LINE A |
ELEVATION OF THIRD RUN OF STEPS EASTERN APPROACH |
UNTITLED |
EASTERN APPROACH DETAILS PLAN OF IRON BEAMS NORTH SIDE TERRACE |
Folder 169 | 169 |
Contents |
---|
WESTERN STAIRCASE SECTION ON LINE A-B #7 |
RECORD WIRING |
SECOND FLOOR NORTH EAST SECTION |
WESTERN STAIRCASE SECTION ON LINE E-F NO 9 |
FOUNDATION PLAN SOUTH PORTICO |
Folder 170 | 170 |
Contents |
---|
ELEVATION OF SOUTH EAST SIDE OF DRIVEWAY SHOWING STEPS TO TERRACE |
PLAN & ELEVATION OF SIDE TERRACES NORTH & SOUTH OF THIRD RUN OF STEPS NO 798-32 |
PLAN OF BASE COURSE PLANS & ELEVATION OF EASTERN WALL OF SOUTHERN DRIVEWAY EASTERN APPROACH 798-30 |
PLANS & ELEVATIONS OF EASTERN SIDE OF NORTHERN DRIVEWAY |
PLAN & ELEVATION OF TERRACE & PORTICO SOUTH SIDE |
Folder 171 | 171 |
Contents |
---|
PLAN & ELEVATION WESTERN SIDE OF NORTHERN DRIVEWAY |
798-53 |
798-9 |
PLAN OF EAST ENTRANCE GROUND FLOOR |
Folder 172 | 172 |
Contents |
---|
PRINCIPAL FLOOR PLAN |
ENTRANCE FLOOR PLAN |
PLAN WESTERN APPROACH & PORTICO |
FRONT ELEVATION WESTERN APPROACH & PORTICO |
FRONT ELEVATION WESTERN APPROACH & PORTICO |
Folder 173 | 173 |
Contents |
---|
WESTERN STAIRCASE # 5 PLAN OF PRINCIPAL FLOOR |
SIDE ELEVATION WESTERN APPROACH & PORTICO |
TRANVERSE SECTION WESTERN APPROACH & PORTICO |
PLAN WESTERN APPROACH & PORTICO |
LONGITUDINAL SECTION WESTERN APPROACH & PORTICO |
Folder 174 | 174 |
Contents |
---|
TILING PLAN 3RD FLOOR WESTERN STAIR CASE |
FRAMING PLANS OF TOWER |
SECTION OF EAST FRONT AT CENTER OF BUILDING |
TILING PLAN 3RD FLOOR WESTREN STAIRCASE |
PLANS OF TOWER FLOORS SHOWING STONE FLAGGING & TOWER CEILING |
Folder 175 | 175 |
Contents |
---|
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
Folder 176 | 176 |
Contents |
---|
UNTITLED |
UNTITLED |
SECTION OF DOME-LIGHT OVER SENATE STAIRCASE |
UNTITLED |
TOWER |
Folder 177 | 177 |
Contents |
---|
ATTIC OF FIFTH FLOOR |
ELECTRIC PLANT STEAM PIPING IN POWER HOUSE CONDUIT & CAPITOL BASEMENT PLAN OF ENGINE ROOM |
ALTERATIONS TO ROOMS |
ELEVATION ON LINE G |
GROUND PLAN OF EAST FRONT CENTER PORTION AS IT IS AT PRESENT |
Folder 178 | 178 |
Contents |
---|
GALLERY FLOOR PLAN ALTERATIONS TO PLUMBING |
DATA SHEET DIAGRAMATIC ELEVATIONS SHOWING PRESENT CONDITIONS; ALTERATIONS TO PLUMBING |
ALTERATIONS IN OFFICE OF SUPERINTENDENT OF PRISONS CONSTRUCTION & ELEC WORK |
UNTITLED |
UNTITLED |
Folder 179 | 179 |
Contents |
---|
ALTERATIONS TO ROOF FRAMING PLAN |
FIFTH STORY PLAN |
FOURTH STORY PLAN |
SECOND STORY PLAN |
FIRST STORY PLAN |
BASEMENT PLAN |
ALTERATIONS TO STATE CAPITOL ALBANY NY SECTIONS |
Folder 180 | 180 |
Contents |
---|
ALERATIONS TO LONGITUDINAL SECTIONS |
SECTIONS |
ALTERATIONS NORTH & SOUTH ELEVATIONS |
ALTERATIONS TO ELEVATION OF NORTH SIDE NORTH WALL CENTER SECTION |
THREE QUARTER INCH DETAILS OF NEW STONE DORMERS ON WEST ELEVATION |
Folder 181 | 181 |
Contents |
---|
DETAILS & ELEVATION OF GRANITE WALLS ABOVE 5TH FLOOR LEVEL IN N & S COURTS |
ELEVATION OF WEST CORRIDOR WALL ABOVE THE 3RD FLOOR LOOKING EAST |
ELEVATION OF SOUTH SIDE SOUTH WALL CENTER SECTION |
DETAIL OF STONE & BRICK WORK OF NW TOWER |
ALTERATIONS TO DETAIL OF STONE & BRICK WORK OF SOUTH WEST TOWER |
Folder 182 | 182 |
Contents |
---|
ELEVATION OF EAST CORRIDOR WALL LOOKING EAST |
THREE QUARTER INCH DETAILS OF STONE LOGGIA AT 5TH FLOOR WEST ELEVATION |
DATA DRAWING ELEVATOR SHAFTS AND TOILETS |
PLAN OF SOUTH WEST TOWER FOR MASONRY & STRUCTURAL STEEL ALTERATIONS |
ALTERATIONS FULL SIZE DETAIL OF VENTILATING RIDGE SHOWING ADDITIONAL BRACING |
Folder 183 | 183 |
Contents |
---|
ALTERATIONS DETAILS OF CHIMNEY BASES |
ALTERATIONS TO VENTILATING RIDGE BETWEEN SKYLIGHT & MAIN RIDGE OF CENTER |
F.S. DETAILS OF PARTITIONS ROOMS 220 & 221 2ND FLOOR |
F.S. DETAILS OF COPPER CANOPY OVER VENT FLUES & TOILET ROOMS |
LAYOUT OF WOOD CEILING BEAMS IN ROOM 332 WITH MEASUREMENTS THEREON TO WHICH WOOD WORK WILL BE MADE. WALLS AT BUILDING TO BE GROUNDED TO SUIT |
Folder 184 | 184 |
Contents |
---|
DETAILS OF SETTING BEAMS AROUND STAIR WELL & STAIR PLATFORM |
FULL DETAILS OF SKYLIGHT OVER NORTH & SOUTH CORRIDORS WESTERN STAIRCASE |
ALTERATIONS RESTORING SANDSTONE & SKYLIGHT OVER NORTH CORRIDOR WESTERN STAIRCASE 4TH STORY |
ALTERATIONS TO ATTIC PLANS ELEVATOR & DETAILS METAL WINDOW FRAMES SASH & GLAZING |
ALTERATION TO PLUMBING DWG BSMT PLAN |
Folder 185 | 185 |
Contents |
---|
WAINSCOT AND NEW PARTITION CASES FOR OFFICES OF STATE COMMISSION IN LUNACY 1ST FL RM 124 |
REFINISHING OFFICES FOR THE STATE COMMISSION LUNACY FIRST FLOOR |
REFINISHING OFFICES OF THE EXCISE DEPT SECOND FLOOR |
FULL SIZE DETAILS OF MEZZANINE FLOOR IN ROOM 244 EXCISE DEPT |
STATE ARCHITECTS OFFICE EQUIPMENT FOR FILING ROOM 403 DETAILS |
Folder 186 | 186 |
Contents |
---|
ALTERATION DETAIL OF TOILET ROOM WINDOWS NORTH OF CENTER SECTION |
RESTORATION OF WESTERN STAIRCASE |
DETAILS OF THREE NORTH DORMERS |
FINISHING ROOMS & CORRIDORS THIRD FLOOR PLAN |
FINISHING ROOMS & CORRIDORS PLAN 3RD FLOOR CORRIDORS |
Folder 187 | 187 |
Contents |
---|
DETAIL OF TOILET RM WINDOWS SOUTH OF CENTER SECTION |
TOILET ROOM DOORS NORTH AND SOUTH OF CENTER |
SECRETARY OF STATE'S OFFICE ROOMS 256, 257, & 258 PANELED PARTITIONS |
F S D SHOWING STEEL FURRING & TEMPORARY PLASTERING WEST CORRIDOR 3RD FLOOR UNDER MEZZ FLOORS |
FINISHING ROOMS & CORRIDORS DETAIL MEASUREMENTS ROOMS 332 333 |
Folder 188 | 188 |
Contents |
---|
FOURTH FLOOR EAST SIDE WEST CORRIDOR |
FINISHING ROOMS & CORRIDORS ROOM 332 DETAIL OF FLOOR WALLS & CEILING |
PLANS & ELEVATION OF MARBLE WORK AT INTERSCETIONS OF 3RD FLOOR CORRIDORS ALTERATION |
FINISHING ROOMS & CORRIDORS ROOM 333 DETAIL OF FLOOR, WALLS, AND CEILING |
FINISHING ROOMS & CORRIDORS DETAILS MEASUREMENTS OF ROOMS 334 335 336 338 339 340 |
Folder 189 | 189 |
Contents |
---|
MEASUREMENT IN ROOMS 332 & 342 PLANS WI SIDE WALLS LAID DOWN |
DETAILS OF PRIVATE ELEVATOR & LADDER FOR THE STATE ARCHITECT'S OFFICE RM 609 |
WOOD & GLASS PARTITION FOR CITIES COMMITTEE 4TH FLOOR |
DETAILS OF DOORS TO CORRIDOR ROOMS 435, 436 & 437 |
FULL SIZE DETAIL OF CAPITOL FOR LARGE PILASTER FOR ROOM 337 |
Folder 190 | 190 |
Contents |
---|
ES SIDE ELEVATION OF PILASTER CAPS (FOR OTHER DETAILS SEE SHEET 452) CAPITOL ALBANY NY |
DETAIL OF STAND PIPE & CONNECTION FOR NORTH & SOUTH CORRIDORS ON 3RD & 5TH FLOORS |
FINISHING ROOM 608 |
STEEL FRAMING FOR CEILING INTERSECTION NORTH & WEST & SOUTH & WEST INTERSECTIONS |
3/4 IN DETAILS OF ARTIFICIAL STONE CEILING AT INTERSECTION OF S & W CORRIDORS |
Folder 191 | 191 |
Contents |
---|
REARRANGEMENT OF SENATE CHAMBER FOR IMPEACHMENT TRIAL |
STEEL FRAMING FOR CEILING INTERSECTIONS SOUTH & EAST |
DETAIL OF VENTILATOR SASH & SKYLIGHT FOR RM NO 608 |
DWG SHOWING POSITION OF OPENINGS IN THE CARS FOR THE NEW ELEVATORS CAPITOL RECONSTRUCTION |
CONSTRUCTION STORM WINDOWS & VESTIBULES FOR ROOM 517 |
Folder 192 | 192 |
Contents |
---|
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
RENEWING STONE WORK WITH STAIRCASE CORRIDOR 4TH FLOOR |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Folder 193 | 193 |
Contents |
---|
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Folder 194 | 194 |
Contents |
---|
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Folder 195 | 195 |
Contents |
---|
FINISHING ROOMS & CORRIDORS DETAIL HOLLOW METAL WORK |
FULL DETAIL OF STAIRS ON LANDING B DOWN |
FINISHING ROOMS & CORRIDORS DETAIL OF HOLLOW METAL WORK |
FULL SIZE DETAIL OF NORTH STAIRS ON LANDINGS & PLATFORMS |
DETAILS OF STAIRS FROM 5TH FLOOR MEZZ TO 6TH FLOOR N & S TOWERS |
Folder 196 | 196 |
Contents |
---|
DESIGN FOR 4TH FLOOR TYPICAL FOR THE 5TH FLOOR |
PLAN OF THE 4TH FLOOR NORTH WEST SHOWING FURNITURE LAYOUT FOR THE STATE BOARD OF TAX CMSN |
READING TABLE ROOM NO 337 |
FSD OF CHAIR FOR LEGISLATIVE LIBRARY |
ELECTRIC WIRING EAST WING SECOND FLOOR |
Folder 197 | 197 |
Contents |
---|
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
RESTORATION OF INTERIOR SKYLIGHTS OVER WEST STAIRCASE |
Folder 198 | 198 |
Contents |
---|
FSD OF DESK FOR LEGISLATIVE LIBRARY |
FSD CHAIR FOR LEGISLATIVE LIBRARY |
FSD READING TABLE FOR LEGISLATIVE LIBRARY |
FSD OF DESK LEGISLATIVE LIBRARY |
ALTERATIONS IN EXECUTIVE OFFICES STAIR DETAILS |
Folder 199 | 199 |
Contents |
---|
ALTERATIONS IN EXECUTIVE OFFICES WOOD DETAILS |
FINISHING ROOMS & CORRIDORS |
REPAIRS PAINTING ETC ROOM 151 ASSEMBLY MAILING DEPT (ASSEMBLY CHAMBER REPAIRS ETC.) |
MISC DETAILS NEW TOILET ROOM 609A |
CHANGING 4TH FLOOR SENATE CORRIDOR INTO ROOMS |
2 DIRECTORY BOARDS INDUSTRIAL COMMISSION 5TH FLOOR CORRIDORS |
Folder 200 | 200 |
Contents |
---|
LEGISLATIVE REPORTERS ROOMS REPAIRS AND IMPROVEMENTS TO ROOMS ON THIRD FLOOR OF NY STATE CAPITOL CONSTRUCTION STAIR DETAILS |
CHANGING 4TH FLOOR SENATE CORRIDOR INTO ROOMS |
CONVERTING WEST LOBBY INTO OFFICE FOR EXCISE DEPT |
PLAN OF ROOMS 246 - 250 |
CONVERTING WEST LOBBY INTO OFFICE FOR EXCISE DEPT |
Folder 201 | 201 |
Contents |
---|
HEATING BASEMENT EAST DWG # B/E |
HEATING BASEMENT PLAN WEST DWG # B/W |
ELECTRIC WORK ALARM WATCHMAKER'S CLOCK, TIME CLOCK & SIGNAL WIRING DIAGRAMS LIGHTING PANEL & INTERCONNECTING CABINET SCHEDULES DWG |
PUMPS, PIPING & COVERING PART BASEMENT PLAN, SECTIONS AND DETAILS REPAIRS AND EQPT WATER SYSTEM |
COSTRUCTION NEW STAIRS TO BALCONY IN ROOM 435 ELEVATION & SECTIONS |
Folder 202 | 202 |
Contents |
---|
SECOND FLOOR EAST DWG # 2/E |
SECOND FLOOR WEST DWG # 2/W |
THIRD FLOOR EAST DWG # 3/E |
THIRD FLOOR WEST DWG # 3/W |
FOURTH FLOOR EAST DWG # 4/E |
Folder 203 | 203 |
Contents |
---|
FOURTH FLOOR WEST DWG # 4/W |
FIFTH & SIXTH FLOOR EAST DWG # 5-6/E |
SIXTH FLOOR WEST DWG # 6/W |
CAPITOL ALBANY NY SANITARY REPAIRS & ALTERATIONS |
ELECTRIC REPLACEMENT OF ELECTRIC EAST SECTION 3RD FLOOR PLAN |
Folder 204 | 204 |
Contents |
---|
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION FOURTH FLOOR PLAN |
REPLACEMENT OF ELECTRIC WORK EAST SECTION 6TH FLOOR PLAN |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION PARTIAL FIRST & SIXTH FLOOR PLANS |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION BASEMENT FLOOR PLAN & DETAILS |
REPLACEMENT OF ELECTRIC WORK EAST SECTION UNDERGROUND SERVICE & PLOT |
Folder 205 | 205 |
Contents |
---|
REWIRING & NEW SERVICE FOR WEST STAIRWAY SECTIONS & DETAILS |
ELECTRIC REWIRING OF WESTERN STAIRCASE 3RD FLOOR |
REWIRING OF WEST STAIRWAY 4TH FLOOR PROJECT |
CAPITOL POWER HOUSE ALBANY NY CONSTRUCTION BOILER WALKWAYS & PLATFORMS |
ELECTRIC REWIRING OF WESTERN STAIRCASE SECOND FLOOR |
Folder 206 | 206 |
Contents |
---|
ELECTRIC CONSERVATION ELECTRIC SERVICE ETC 3RD, 5TH, 6TH & ATTIC PLANS |
ELECTRIC CONVERSION OF ELECTRIC SERVICE ETC CONSTRUCTION DETAILS TRANSFORMER ROOM |
LEGISLATIVE CORRESPONDENTS ASSOCIATION ROOM ALTERATIONS FLOORM& PLANS DETAILS & DIAGRAMS |
UNTITLED |
3RD FLOOR CORRIDOR |
Folder 207 | 207 |
Contents |
---|
SANITARY LEGISLATIVE CORRESPONDENTS ASSOCIATION ROOM ALTERATIONS PLANS & SECTIONS |
LEGIS CORRESPONDENTS ASSOC ROOM ALTERATIONS |
HEATING 4TH FLOOR PLAN WEST MEZZANINE |
CONSTRUCTION FIRST FLOOR PLAN EAST |
CONSTRUCTION 1ST FLOOR PLAN WEST |
Folder 208 | 208 |
Contents |
---|
HEATING 5TH FLOOR PLAN EAST |
HEATING 5TH FLOOR PLAN WEST |
HEATING FIRST FLOOR PLAN EAST |
HEATING FIRST FLOOR PLAN WEST |
HEATING SECOND FLOOR PLAN EAST |
Folder 209 | 209 |
Contents |
---|
HEATING THIRD FLOOR PLAN EAST MEZZANINE |
HEATING THIRD FLOOR PLAN WEST |
HEATING THIRD FLOOR PLAN WEST MEZZANINE |
HEATING FOURTH FLOOR PLAN EAST |
HEATING FOURTH FLOOR PLAN EAST MEZZANINE |
Folder 210 | 210 |
Contents |
---|
HEATING 4TH FLOOR PLAN WEST |
HEATING & VENTILATING CONSTRUCTION & ELECTRIC AIR CONDITION FOR ROOMS NO. 341, 342, 343 & UNDER FLOOR DUCT SYSTEM IN ROOM NO. 342 PLANS ELEVATIONS & SECTIONS |
HEATING & VENTILATING CONSTRUCTION & ELECTRIC AIR CONDITION FOR ROOMS NO. 341, 342, 343 & UNDER FLOOR DUCT SYSTEM IN ROOM NO. 342 PLANS ELEVATIONS & SECTIONS |
SEQUENCE OF PITS ELEVATORS 3 AND 4 CAPITOL SOUTH LOBBY MODIFICATIONS |
NORTH/SOUTH SECTION |
Folder 211 | 211 |
Contents |
---|
BASEMENT FLOOR |
GALLERY FLOOR |
ENTRANCE FLOOR |
ATTIC FLOOR |
Folder 212 | 212 |
Folder 213 | 213 |
Contents |
---|
DETAILS OF MEZZ 4TH FLOOR DOORS #426-427-428-429-442 & 443 |
FULL SIZE DETAIL OF STAIRS AT 4TH STORY UP |
Folder 214 | 214 |
Contents |
---|
798-35 |
PLAN & ELEVATION OF TERRACE & PORTICO NORTH SIDE |
Folder 215 | 215 |
Contents |
---|
F.S.DETAILS OF CORRIDOR DOORS TO RMS. 333 AND 341 |
F.S. DETAILS OF WAINSCOTING ROOM 333 |
F.S. DETAIL OF CEILING PANELS ROOM 333 |
F.S. DETAILS OF CEILING CORNICE IN ROOM 333 |
Folder 216 | 216 |
Contents |
---|
UNTITLED |
ALTERATIONS TO HOUSE OVER ELEVATOR SHAFTS & DETAIL OF SKYLIGHTS |
Folder 217 | 217 |
Contents |
---|
PRINCIPAL FLOOR PLAN ALTERATIONS TO PLUMBING |
DETAILED SECTION EAST & WEST THROUGH CENTER EASTERN APPROACH |
FULL SIZE DETAILS OF MANTLE (WOOD) IN ROOM? 533 |
GALLERY FLOOR PLAN |
Folder 218 | 218 |
Contents |
---|
ELEVATION ON LINE F |
DETAIL OF ENTABLATURE 3RD STORY FLOOR LEVEL OVER NORTH & SOUTH PORTICOS |
Folder 219 | 219 |
Contents |
---|
NORTH WEST ELEVATION & SECTION - NORTHWEST TOWER |
SOUTH ELEVATION/NORTH ELEVATION |
Folder 220 | 220 |
Contents |
---|
DETAIL OF BRONZE ELEVATOR CAR ALTERATIONS |
FULL SIZE DETAILS OF ELEVATOR SCREEN & DOORS 1ST, 2ND, 3RD, 4TH FLOORS ALTERATIONS |
Folder 221 | 221 |
Contents |
---|
FULL DETAIL OF STAIRS ON 4TH STORY |
FULL SIZE DETAIL OF STAIRS ON LANDING A & C DOWN |
FULL SIZE DETAIL OF STAIR WALL STRING AT 4TH FLOOR |
FULL SIZE DETAILS OF STAIRS |
Folder 222 | 222 |
Contents |
---|
F.S. DETAILS OF BOOKCASE, WARDROBE AND WAINSCOTING ROOMS 344, 345, 346 |
F.S. DETAIL OF DOOR TRIM BETWEEN ROOMS 345 AND 346 AND IN T.S. PART BET. RMS 344 AND 345 |
FULL SIZE DETAIL OF MAIN CORNICE ROOM NO 337 |
FULL SIZE DETAILS OF MARBLE WORK OF DOORS TO ROOMS 337A AND B FROM ROOM 337 |
FULL SIZE DETAILS OF MARBLE CORNICE FOR ROOM 337 |
F.S. DETAILS OF MARBLE WORK OF DOOR OPENING TO CORRIDOR FROM ROOM 337 |
Folder 223 | 223 |
Contents |
---|
WESTERN SECTION OF BASEMENT FLOOR PLAN SHOWING HEATING & VENTILATING SYSTEM |
Folder 224 | 224 |
Contents |
---|
FS DETAILS OF WAINSCOT & MARBLE WORK RM 341 |
F S D WAINSCOTTING DOOR & DOOR TRIM FOR PARTITION IN PRIVATE OFFICE OF THE STATE ARCHITECT |
DETAILS OF ARCHED OPENINGS LEADING TO ROOM 350 FROM E CORRIDOR N STATE CAP ALBANY NY |
Folder 225 | 225 |
Contents |
---|
F.S. DETAILS OF PILASTER CORNICE AND WAINSCOTING ROOM 332 |
PLANS AND ELEVATIONS OF WINDOWS WITH FULL SIZE DETAILS THIRD FLOOR CORRIDOR |
F.S. DETAILS OF WAINSCOT PARTITIONS RMS 334 TO 340 AND 346 |
F.S. DETAIL OF CORRIDOR FOR TRIM ROOMS 334, 335, 336, 338, 339, 340 |
Folder 226 | 226 |
Contents |
---|
FULL SIZE DETAIL OF SOUTH STAIRS ON LANDING & PLATFORMS |
FULL DETAIL OF STAIRS B LANDING |
FULL SIZE DETAIL OF STAIRS 5TH FLOOR LANDING |
FULL SIZE DETAIL OF STAIRS I WALL STRING & MARBLE BASES |
Folder 227 | 227 |
Contents |
---|
FULL SIZE DETAILS OF MARBLE ARCH OVER WINDOWS ROOM 337 |
F.S. DETAILS OF CORRIDOR DOOR TO RM 332 |
F.S. DETAIL OF DESIGN OF CEILING PANELS |
CORNICE AND PART OF CEILING ROOM 332 |
Folder 228 | 228 |
Contents |
---|
ENTRANCE FLOOR PLAN |
PLAN & ELEVATION OF EASTERN TERRACE |
TILING PLAN 2ND FLOOR WESTERN STAIRCASE |
Folder 229 | 229 |
Contents |
---|
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SESTIONS |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS AND GENERAL NOTES |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS DOORWAY 247-A |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 PLANS AND ELEVATIONS |
Folder 230 | 230 |
Contents |
---|
TILING PLAN 3RD FLOOR WESTERN STAIRCASE |
ALTERATIONS TO DOORWAY TO ROOM 417 ELEVATION & DETAILS |
Folder 231 | 231 |
Contents |
---|
DETAILS OF ELEVATOR SCREEN DOORS 1ST, 2ND, 3RD & 4TH FLOORS |
FULL SIZE DETAIL OF RIB CORNICE ROOM 337 |
SIGN FULL SIZE INCISED LETTERING LAYOUT |
PRINCIPAL FLOOR PLAN |
Folder 232 | 232 |
Contents |
---|
GROUND FLOOR PLAN |
HALF PLAN OF EASTERN APPROACH ABOVE TERRACE BACK TO CENTER OF ROADWAY 798-39 |
798-29 |
BASEMENT FLOOR PLAN NY STATE CAPITOL SHOWING FRESH AIR DUCTS W END |
WESTERN SECTION BASEMENT FLOOR PLAN |
Folder 233 | 233 |
Contents |
---|
EAST ELEVATION |
DATA DRAWING OF PRESENT CONDITIONS 1ST FLOOR PLAN |
PRINCIPAL FLOOR PLAN |
ALTERATIONS DETAILS OF NORTH & SOUTH ELEVATOR SHAFTS |
ALTERATIONS TO VENTILATOR BACK OF SOUTH CHIMNEY OF NORTH WEST TOWER |
Folder 234 | 234 |
Contents |
---|
DATA DWG |
SECTION THROUGH EAST ENTRANCE LOOKING WEST |
UNTITLED |
SOUTH SIDE ELEVATION OF EASTERN APPROACH PORTICO & DORMERS |
UNTITLED |
Folder 235 | 235 |
Contents |
---|
TILING PLAN 2ND FLOOR WESTERN STAIRCASE |
WESTERN STAIRCASE PLAN OF GALLERY FLOOR |
WESTERN STAIRCASE PLAN OF GROUND FLOOR |
Folder 236 | 236 |
Contents |
---|
DETAIL OF CORNICES IN WEST CORRIDORS NORTH AT INTERSECTION & IN WEST CORRIDOR SOUTH AT INTERSECTION |
DETAILS OF CORNICES ARCHES KEY BLOCKS BANDS PANELS BASES & CORNER BEADS IN N S W & E CORRIDORS & CORNERS BEADS IN RMS ON FOURTH FL ELEV OF CORNER BEADS IN |
FINISHING ROOMS & CORRIDORS DETAILS OF PLASTER FURRING & BRACKETS UNDER LANDING B |
Folder 237 | 237 |
Contents |
---|
LEGISLATIVE REPORTERS ROOMS REPAIRS & IMPROVEMENTS TO ROOMS 3RD FLOOR |
REPAIRS FURNISHING & EQUIPMENT OF ASSEMBLY CHAMBER DETAILS OF SEATS IN LADIES GALLERY |
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH |
Folder 238 | 238 |
Contents |
---|
SECTION THROUGH TOWER LOOKING EAST |
FRAMING PLANS OF TOWER |
PLAN & ELEVATION TERRACE & PORTICO NORTH SIDE |
ELEVATION OF EAST FRONT & APPROACH |
Folder 239 | 239 |
Contents |
---|
NORTH OR SOUTH APPROACH |
Folder 240 | 240 |
Contents |
---|
BIRD CONTROL ABOVE SECOND FLOOR PORTIONS OF SOUTH AND WEST ELEVATIONS |
Folder 241 | 241 |
Contents |
---|
DETAILS OF ELEVATOR SCREEN & DOOR 1ST, 2ND, 3RD & 4TH FLOORS |
FS DETAILS 5TH FLOOR LOGGIA WINDOW FRAMES ALTERATIONS |
FULL SCALE DETAILS OF ROUGH CONCRETE FILLING AROUND WINDOWS FOURTH FLOOR |
Folder 242 | 242 |
Contents |
---|
DETAIL OF BASE & CORNICES ETC WEST CORRIDOR ON 1ST & 2ND FLOORS |
FINISHING ROOMS & CORRIDORS F. S. D. OF MAIN CORNICE AT N & S ENDS OF MAIN CORRIDOR FOURTH FLOOR CEILING |
FULL SIZE DETAILS OF STONE STILLS, ETC |
FINISHING ROOMS & CORRIDORS |
Folder 243 | 243 |
Contents |
---|
WESTERN STAIRCASE NO 8 SECTION ON LINE C-D |
Folder 244 | 244 |
Contents |
---|
DETAIL OF ELEVATOR SCREEN & DOOR 5TH FLOOR ALTERATIONS |
DETAILS OF ELEVATOR SCREEN DOORS 1ST, 2ND, 3RD & 4TH FLOORS |
PLAN OF TERRACE EAST SIDE |
FULL SIZE DETAIL OF ROSETTE & ORNAMENT FOR GROINED CEILINGS AT INTERSECTIONS OF W & S, S&E, & W&N CORRIDORS |
FULL SIZE SECTION THROUGH WINDOW & CORNICE NEW STONE DORMERS WEST ELEVATION |
Folder 245 | 245 |
Contents |
---|
FULL SIZE DETAIL OF SHELL IN PEDIMENT OF NEW STONE DORMER WEST ELEVATION |
FULL SIZE DETAIL OF CORNICE PILASTER & WINDOW NEW STONE DORMERS W ELEVATION |
FULL SIZE DETAILS OF FINIALL AT TOP OF NEW STONE DOMERS WEST ELEVATION |
FULL SIZE DETAILS OF STONE WORK IN LOGGIA WEST ELEVATION |
Folder 246 | 246 |
Contents |
---|
UNTITLED |
UNTITLED |
Folder 247 | 247 |
Contents |
---|
DATA SAVE ALL |