Subseries 3: Capital construction project files
Dates:
1948-1975, 1969-1977
Physical Description:
36 cubic feet of textual records
Scope and Content Note:
Contains records relating to capital construction projects involving the construction of, additions to, and rehabilitation of, buildings in the New York State school system. Many of these projects concern the maintenance of the New York State School for the Blind in Batavia and the New York State School for the Deaf in Rome. Other projects include improvements to the State Education Building in Albany and the construction and rehabilitation of schools located on Native American reservations. Included are blueprints, specifications of labor and materials required, correspondence, requests for bids, and copies of contracts.
Dates | Contents | Box | Folder |
---|---|---|---|
Accretion: W0105-93 |
|||
1970 April-December | Capital construction - State Education Building - Dehumidification Tanks | 2 | 1 |
1968 May-1972 May | Capital construction - State Education Building - Passenger Elevators - Automation of Nos. 5, 6, 7, 8 | 2 | 2 |
1969 April-May | Capital construction - State Education Building - Electrical Capacity - Main Building and Addition | 2 | 3 |
1968 August-1969 April | Capital construction - State Education Building - Heating and Air Conditioning- Phase 1 Replacement of Elevators Nos. 5, 6, 7, 8 and Appurtenant Work | 2 | |
1962 June-August | Capital construction - State Education Building - Exterior Lighting (Installation of) | 2 | 4 |
1955 June-1969 February | Capital construction - State Education Building - Museum - Conversion of 4th Floor | 2 | 5 |
March 1960-March 1965 | Capital construction - State Education Building - Fallout Shelters - General | 2 | 6 |
1963 January-April | Capital construction - State Education Building - Fallout Shelters | 2 | 7 |
1970 May-July | Capital construction - State Education Building - New Offset Press for Printing Plant | 2 | 8 |
1971 July-December | Capital construction - State Education Building - Storm Sewer (Engine Room) | 2 | 9 |
1971 August | Capital construction - State Education Building - Water Treatment System | 2 | 10 |
1969 April | Capital construction - State Education Building - Blueprints for Replacement of Elevators 5, 6, 7, 8 and Appurtenant Work | 2 | |
1971 October-1973 June | Capital construction - State Education Building - Lighting System - Kingsbridge Armory (Professional Licensing Exams) | 2 | 11 |
1970 February-1971 September | Capital construction - State Education Building - Museum Exhibit Center - 60 Commerce Ave. | 2 | 12 |
1954 November-1961 November | Capital construction - State Education Building - Addition (Offices) | 5 | 1 |
1959 February-1960 August | Capital construction - State Education Building - Addition (Offices) | 5 | 2 |
1956 April-1959 April | Capital construction - State Education Building - Addition to building - Building Committee | 5 | 3 |
1956 June-1957 October | Capital construction - State Education Building - Addition to building - Milton Musicus's notes | 5 | 4 |
1962 October-1965 November | Capital construction - State Education Building - Computer site preparation | 5 | 5 |
1967 January-1968 March | Capital construction - State Education Building - Data processing facilities | 5 | 6 |
1967 December-1968 January | Capital construction - State Education Building - Driveway | 5 | 7 |
1966 April-1967 January | Capital construction - State Education Building - New cars in passenger elevator | 5 | 8 |
1962 January-February | Capital construction - State Education Building - Fire alarm boxes | 5 | 9 |
1958 December | Capital construction - State Education Building - Fire safety | 5 | 10 |
1966 July-August | Capital construction - State Education Building - Hoistway doors (Install) | 5 | 11 |
1966 June-1967 November | Capital construction - State Education Building - Loading dock (Resurface of) | 5 | 12 |
1965 May-1966 February | Capital construction - State Education Building - Library stack elevator #12 (Repairs to) | 5 | 13 |
1967 April-August | Capital construction - State Education Building - Adequate lighting (Commissioner's office) | 5 | 14 |
1966 January-1967 November | Capital construction - State Education Building - Adequate lighting - State Library | 5 | 15 |
1966 June-1968 August | Capital construction - State Education Building - Opening in walls and ceilings (rehabilitate) | 5 | 16 |
1968 January-August | Capital construction - State Education Building - Museum panelboard (replace) | 5 | 17 |
1968 May-August | Capital construction - State Education Building - Painting | 5 | 18 |
1959 September-1964 July | Capital construction - State Education Building - Planting of trees | 5 | 19 |
1967 March-1968 October | Capital construction - State Education Building - Illumination (Regents Room) | 5 | 20 |
1967 September-November | Capital construction - State Education Building - Roof | 5 | 21 |
1965 May-July | Capital construction - State Education Building - Weatherstrip windows | 5 | 22 |
1955 August-1968 July | Capital construction - State Education Building - Air conditioning - Chancellor's Hall | 5 | 23 |
1969 May-1974 July | Capital construction - Batavia - Demolition of Boiler House | 7 | 1 |
1973 September-1974 August | Capital construction - Batavia - Door Hardware | 7 | 2 |
1973 July-1974 August | Capital construction - Batavia - Park Lights | 7 | 3 |
1973 December-1975 March | Capital construction - Batavia - Exit - Roller Rink | 7 | 4 |
1973 August | Capital construction - Batavia - Alterations for Improved Fire Safety | 7 | |
1973 February-1974 May | Capital construction - Rome - Cracked Ceilings | 7 | 5 |
1974 February-September | Capital construction - Rome - Fire Safety Building No. 9; Emergency Lighting Building No. 11 | 7 | 6 |
1973 December-1975 June | Capital construction - Rome - Roof Repairs | 7 | 7 |
1972 May-1973 June | Capital construction - St. Regis Mohawk Indian School - Boilers | 8 | 1 |
1972 February-1973 April | Capital construction - St. Regis Mohawk Indian School - Rehab. of Various Rooms and Appurtenant Work (Construction, Heating, and Sanitary) | 8 | 2 |
1971 July-1973 August | Capital construction - St. Regis Mohawk Indian School - Rehab. of Various Rooms and Appurtenant Work (Electric) | 8 | 3 |
1967 May-1972 September | Capital construction - St. Regis Mohawk Indian School - Roof Repairs | 8 | 4 |
1971 August-1973 March | Capital construction - Tuscarora Indian School - Boilers | 8 | 5 |
1971 September-1972 December | Capital construction - Tuscarora Indian School - Interior Plastering, Painting and Tiling | 8 | 6 |
1970 November-1973 March | Capital construction - Tuscarora Indian School - Roof Repairs | 8 | 7 |
1972 July-1973 February | Capital construction - Tuscarora Indian School - Repairs to Sewerage System | 8 | 8 |
1972 May | Capital construction - St. Regis Mohawk Indian School - Rehabilitation of Electrical System and Appurtenant Work | 8 | |
1972 May | Capital construction - St. Regis Mohawk Indian School - Rehabilitation of Various Rooms and Appurtenant Work | 8 | |
1970 September | Capital construction - St. Regis Mohawk Indian School - Rehabilitation of Toilet Rooms | 8 | |
1953 April-1974 July (bulk 1953 April-1957 June) | Capital construction - Allegany Indian Reservation - General Correspondence | 10 | 1 |
1958 November-1966 September | Capital construction - Allegany Indian Reservation - New Elementary School Building | 10 | 2 |
1953 January-1957 February | Capital construction - Allegany Indian Reservation - Transfer of Old Buildings | 10 | 3 |
1954 April-1966 March (bulk 1954 April-1961 November) | Capital construction - Cattaraugus Indian Reservation - General Correspondence | 10 | 4 |
1954 April-1961 August | Capital construction - Onondaga Indian Reservation - General Correspondence | 10 | 5 |
1954 August-1967 September | Capital construction - Onondaga Indian Reservation - General Repairs and Rehab. | 10 | 6 |
1962 November-1965 July | Capital construction - Onondaga Indian Reservation - Fallout Shelter | 10 | 7 |
1965 January-1966 May | Capital construction - Onondaga Indian Reservation - Heating and Electrical Work | 10 | 8 |
1963 April-1964 September | Capital construction - Onondaga Indian Reservation - Parking Lot | 10 | 9 |
1954 October-November | Capital construction - Poospatuck Indian Reservation - General Correspondence | 10 | 10 |
1954 June-1967 March | Capital construction - St. Regis Indian Reservation - General Correspondence | 10 | 11 |
1957 February-1958 November | Capital construction - St. Regis Indian Reservation - General Repairs and Rehab. | 10 | 12 |
1962 March-1965 April | Capital construction - St. Regis Indian Reservation - Replacement of Boiler | 10 | 13 |
1962 June-1965 July | Capital construction - St. Regis Indian Reservation - Fallout Shelter | 10 | 14 |
1967 June-1969 September | Capital construction - St. Regis Indian Reservation - Painting | 10 | 15 |
1960 August-1968 December | Capital construction - St. Regis Indian Reservation - General Repairs and Rehab. | 10 | 16 |
1967 June-1969 March | Capital construction - St. Regis Indian Reservation - Repair and Replacement of Sidewalk | 10 | 17 |
1954 March-1967 June | Capital construction - Tuscarora Indian Reservation - General Correspondence | 10 | 18 |
1954 June-1967 July | Capital construction - Tuscarora Indian Reservation - General Repairs and Rehab. | 10 | 19 |
1963 January-1965 July | Capital construction - Tuscarora Indian Reservation - Fallout Shelter | 10 | 20 |
1967 June-1969 August | Capital construction - Tuscarora Indian Reservation - Fence Painting and Repairs | 10 | 21 |
1967 June-1968 December | Capital construction - Tuscarora Indian Reservation - Blacktop Road | 10 | 22 |
1963 May-1967 March | Capital construction - Tuscarora Indian Reservation - Roof Repairs | 10 | 23 |
1964 November-1965 April | Capital construction - Tuscarora Indian Reservation - Sanitary Work | 10 | 24 |
1967 June-1968 December | Capital construction - Tuscarora Indian Reservation - Window Frames 1967 June-1968 December | 10 | 25 |
1963 February-1964 August (bulk 1963 February-November) | Capital construction - Commissioner's residence - Fire Protection | 13 | 1 |
1964 June-1965 February | Capital construction - Commissioner's residence - Kitchen | 13 | 2 |
1959 December-1966 September | Capital construction - Commissioner's residence - Planting | 13 | 3 |
1968 May-1969 July | Capital construction - Commissioner's residence - Radiators | 13 | 4 |
1968 June-1969 November | Capital construction - Commissioner's residence - Roof Rehabilitation | 13 | 5 |
1968 November-1970 September | Capital construction - State Education Building - New Computer Room | 13 | 6 |
1958 March-1966 April | Capital construction - State Museum - Protection of Shaft to Rotunda | 13 | 7 |
1964 June-1970 August | Capital construction - State Education Building - Balustrades and Steps (Restoration of) | 13 | 8 |
1968 November | Capital construction - State Education Building - Pile Driving, Vibration Readings | 13 | 9 |
1968 June-1970 January | Capital construction - State Education Building - Valve Station | 13 | 10 |
1968 April-1969 October | Capital construction - State Education Building - Rewiring and New Fixtures | 13 | 11 |
1966 December-1969 July | Capital construction - State Education Building - Adequate Wiring - Chancellors Hall | 13 | 12 |
1971 February-1972 September | Capital construction - Rome - Demolition - Phase IV | 26 | 1 |
1970 June-November | Capital construction - Rome - Demolition - Phase III | 26 | 2 |
1972 February-June | Capital construction - Rome - Fencing | 26 | 3 |
1971 August-1973 July | Capital construction - Rome - Grounds lighting | 26 | 4 |
1973 January-1974 March | Capital construction - Rome - Swimming pool | 26 | 5 |
1973 February-October | Capital construction - Rome - Sewing room exits | 26 | 6 |
1969 April-1971 May | Capital construction - Rome - Superintendent's residence (Storage space) | 26 | 7 |
1957 December-1973 August | Capital construction - Rome - Land acquisition | 26 | 8 |
1966 May-August | Capital construction - Rome - Land acquisition - Map 1 | 26 | 9 |
1966 May-1968 September | Capital construction - Rome - Land acquisition - Map 2 | 26 | 10 |
1966 May-1967 June | Capital construction - Rome - Land acquisition - Map 3 | 26 | 11 |
1966 February-1968 March | Capital construction - Rome - Land acquisition - Map 4 | 26 | 12 |
1966 May-1969 February | Capital construction - Rome - Land acquisition - Map 5 | 26 | 13 |
1966 February-October | Capital construction - Rome - Land acquisition - Map 6 | 26 | 14 |
1966 May-August | Capital construction - Rome - Land acquisition - Map 7 | 26 | 15 |
1966 May-October | Capital construction - Rome - Land acquisition - Map 8 | 26 | 16 |
1966 September-November | Capital construction - Rome - Land acquisition - Map 9 | 26 | 17 |
1967 December-1968 April | Capital construction - Rome - Land acquisition - Map 10 | 26 | 18 |
1967 December-1969 January | Capital construction - Rome - Land acquisition - Map 11 | 26 | 19 |
1967 December-1969 January | Capital construction - Rome - Land acquisition - Map 12 | 26 | 20 |
1967 August-1969 January | Capital construction - Rome - Land acquisition - Map 13 | 26 | 21 |
1967 August-1969 March | Capital construction - Rome - Land acquisition - Map 14 | 26 | 22 |
1967 August-1969 February | Capital construction - Rome - Land acquisition - Map 15 | 26 | 23 |
1967 December-1969 January | Capital construction - Rome - Land acquisition - Map 16 | 26 | 24 |
1968 December-1972 November | Capital construction - Rome - Acquisition of property - Maps 17-25 | 26 | 25 |
1970 May-1971 November | Capital construction - Rome - Land acquisition - Map 17 | 26 | 26 |
1971 March-1972 February | Capital construction - Rome - Land acquisition - Map 18 | 26 | 27 |
1970 May-1973 March | Capital construction - Rome - Land acquisition - Map 19 | 26 | 28 |
1970 May-1971 December | Capital construction - Rome - Land acquisition - Map 20 | 26 | 29 |
1970 May-1972 June | Capital construction - Rome - Land acquisition - Map 21 | 26 | 30 |
1970 May-1973 April | Capital construction - Rome - Land acquisition - Map 22 | 26 | 31 |
1969 October-1973 January | Capital construction - Rome - Land acquisition - Map 23 | 26 | 32 |
1971 May-1972 February | Capital construction - Rome - Land acquisition - Map 24 | 26 | 33 |
1970 May-1971 December | Capital construction - Rome - Land acquisition - Map 25 | 26 | 34 |
1971 April-1972 September | Capital construction - Rome - Land acquisition - Map 26 | 26 | 35 |
1972 May-1975 August | Capital construction - Tuscarora Indian School - Rehabilitation work of interior and exterior | 28 | 1 |
1972 May-1974 August | Capital construction - Onondaga Indian School - Rehabilitation of basement area | 28 | 2 |
1973 April | Capital construction - Onondaga Indian School - Construction, HVAC and electrical work | 28 | |
1973 April-July | Capital construction - Onondaga Indian School - Tractor storage area | 28 | 3 |
1970 January-October | Capital construction - St. Regis Indian School - Bus garage and shower stalls | 28 | 4 |
1969 October-1972 January | Capital construction - St. Regis Indian School - Rehabilitation of toilet rooms | 28 | 5 |
1972 May-1974 July | Capital construction - St. Regis Indian School - Rehabilitation of classrooms | 28 | 6 |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Construction | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - HVAC work | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Plumbing work | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Electric work | 28 | |
1974 February | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Plumbing work | 28 | |
1974 February-March | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Construction work | 28 | |
1974 February | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Electric work | 28 | |
1974 February | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - HVAC work | 28 | |
1973 September | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Basement floor plan | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Construction work | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Basement plan | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - HVAC work | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Plumbing work | 28 | |
1974 January | Capital construction - Tuscarora Indian School - Rehabilitation of interior and exterior - Electric work | 28 | |
1965 December-1968 April | Capital construction - Batavia - Superintendent's residence | 29 | 1 |
1971 October-1972 December | Capital construction - Batavia - Superintendent's residence - Chimney repairs and Severne Hall - Masonry repairs | 29 | 2 |
1968 December-1971 June | Capital construction - Batavia - Soundproof doors | 29 | 3 |
1970 April-1971 September | Capital construction - Batavia - Severne Hall - Brickwork | 29 | 4 |
1972 May-1973 August | Capital construction - Batavia - Brickwork and rehabilitation of steps | 29 | 5 |
1971 July-1972 August | Capital construction - Batavia - Filtration plant (swimming pool) | 29 | 6 |
1967 August-1968 January | Capital construction - Batavia - Former superintendent's residence | 29 | 7 |
1973 February-March | Capital construction - Batavia - Superintendent's residence - Drain tile | 29 | 8 |
1969 December-1971 December | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Construction | 29 | 9 |
1969 October-1971 December | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Electric | 29 | 10 |
1969 October-1973 March | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Heating | 29 | 11 |
1969 November-1972 April | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Sanitary | 29 | 12 |
1968 July-1973 February | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex | 29 | 13 |
1969 August | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Construction | 29 | |
1969 August | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Heating | 29 | |
1969 August | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Sanitary | 29 | |
1969 March | Capital construction - Batavia - Heating plant, maintenance shops, vehicle and equipment storage complex - Construction | 29 | |
1968 April | Capital construction - Batavia - Vehicle and equipment storage building - Construction | 29 | |
1968 April | Capital construction - Batavia - Vehicle and equipment storage building - Heating | 29 | |
1968 April-May | Capital construction - Batavia - Vehicle and equipment storage building - Sanitary | 29 | |
1968 April | Capital construction - Batavia - Vehicle and equipment storage building - Electric | 29 | |
1964 January-1967 August | Capital construction - Rome and Batavia - Escape windows | 30 | 1 |
1959 November-1963 October | Capital construction - Rome and Batavia - Primary building | 30 | 2 |
1964 October-November | Capital construction - Rome and Batavia - Burglar alarm system | 30 | 3 |
1965 August-1968 July | Capital construction - Rome - Superintendent's residence | 30 | 4 |
1966 June-1968 August | Capital construction - Rome and Batavia - Repair coal bunker | 30 | 5 |
1961 April-1965 October | Capital construction - Batavia - Superintendent's residence | 30 | 6 |
1949 December-1954 December | Capital construction - Rome and Batavia - Gymnasium building | 30 | 7 |
Capital construction - Videotape "...gestion des dechete radioacti...(SECAM)" | 30 | ||
1965 January-November | Capital construction - Rome - Replacement data | 30 | 8 |
1963 January-1964 November | Capital construction - Rome - Replacement data | 30 | 9 |
1954 November-1962 December | Capital construction - Rome - Replacement data | 30 | 10 |
1967 January | Capital construction - Rome - Superintendent's residence - Heating | 30 | |
1967 January | Capital construction - Rome - Superintendent's residence - Construction | 30 | |
1967 January | Capital construction - Rome - Superintendent's residence - Sanitary Work | 30 | |
1959 March-1966 August | Capital construction - Rome - Installation of boiler | 30 | 11 |
1959 June-1965 December | Capital construction - Specifications for labor and materials | 30 | |
1972 May-1973 August | Capital construction, FY 1973-1974 | 36 | 1 |
1969 May-1972 September | Capital construction, FY 1972-1973 | 36 | 2 |
1970 March-1971 February | Capital construction, FY 1971-1972 | 36 | 3 |
1967 November-1973 March | Capital construction, FY 1970-1971 | 36 | 4 |
1968 March-1971 July | Capital construction, FY 1969-1970 | 36 | 5 |
1961 October-1967 February | Proposed 5-year capital construction program (FY 1966-1967 to 1969-1970) | 36 | 6 |
1965 October-1970 January | Capital construction, FY 1965-1966 | 36 | |
1963 April-1967 April | Capital construction, FY 1965-1966 | 36 | 7 |
1967 May-1968 March | Capital construction, FY 1967 | 36 | |
1964 June-1970 June | Capital construction, FY 1966-1967 | 36 | 8 |
circa 1963-1967 | Proposed five-year capital construction program, 1963-1964 to 1967-1968. | 36 | 9 |
1965 September-1968 April | Capital construction, FY 1967-1968 | 36 | 10 |
1967 April-1969 April | Capital construction | 36 | 11 |
1967 September-1973 July | Capital construction, FY 1968-1969 | 36 | 12 |
1971 April-1972 November | Capital construction, FY 1971 | 36 | 13 |
1948 August-October | Capital construction, FY 1949-1950 | 36 | 14 |
1971 July-1974 June | Capital construction - Rome - Administration and classroom building | 41 | 1 |
1971 June | Capital construction - Rome - Blueprints - Improvement of grounds, athletic fields, and entrance road | 41 | 2 |
1965 July-1972 July | Capital construction - Rome - Administration and classroom building | 41 | 3 |
1969 February-1971 August | Capital construction - Rome - Administration and classroom building | 41 | 4 |
1963 June | Capital construction - Rome - Vehicle and food storage building | 41 | 5 |
1968 August-1969 September | Capital construction - Rome - Temporary kitchen, dining, administration and classroom facilities, building 2 | 41 | 6 |
circa 1968 | Capital construction - Rome - Equipment and furnishings for administration, high school, library wing of new school complex | 41 | 7 |
1965 September-1974 August | Capital construction - Rome - Athletic facilities | 41 | 8 |
1969 May-1973 September | Capital construction - Rome - Administrative and classroom building - Electric | 41 | 9 |
1969 May-1972 May | Capital construction - Rome - Administrative and classroom building - Elevator | 41 | 10 |
1969 June-1972 February | Capital construction - Rome - Administrative and classroom building - Equipment | 41 | 11 |
1969 May-1972 March | Capital construction - Rome - Administrative and classroom building - Food service equipment | 41 | 12 |
1969 May-1974 November | Capital construction - Rome - Administrative and classroom building - Heating | 41 | 13 |
1969 April-1973 March | Capital construction - Rome - Administrative and classroom building - Laundry equipment | 41 | 14 |
1969 May-1973 September | Capital construction - Rome - Administrative and classroom building - Sanitary | 41 | 15 |
1968 December-1971 July | Capital construction - Rome - Administrative and classroom building - Storm sewer lines | 41 | 16 |
1966 March-April | Capital construction - Rome - Replacement data, 1966 | 41 | 17 |
1968 November-1969 May | Capital construction - Rome - Specifications of labor and materials | 41 | 18 |
1957 December-1958 May | Capital construction - Commissioner's residence - Bathrooms | 42 | 1 |
1965 October-1967 January | Capital construction - Commissioner's residence - Driveway | 42 | 2 |
1961 May-1962 January | Capital construction - Commissioner's residence - Electric service | 42 | 3 |
1964 September-1966 March | Capital construction - Commissioner's residence - Fence | 42 | 4 |
1959 June-November | Capital construction - Commissioner's residence - Pump | 42 | 5 |
1958 June-November | Capital construction - Commissioner's residence - Paving roadway | 42 | 6 |
1958 January-1965 July | Capital construction - Commissioner's residence - Rehabilitation (general) | 42 | 7 |
1958 February-1965 June | Capital construction - Commissioner's residence - Septic tank and sewage disposal | 42 | 8 |
1964 July-1967 August | Capital construction - State Education Building - Clock system | 42 | 9 |
1959 August-1961 October | Capital construction - State Education Building - Annex - Equipment items | 42 | 10 |
1965 February-1967 May | Capital construction - State Education Building - Freight elevator #10 | 42 | 11 |
1962 August-1967 April | Capital construction - State Education Building - Engine room instrumental panel board | 42 | 12 |
1966 June-1967 December | Capital construction - State Education Building - Lighting fixtures | 42 | 13 |
1964 September-1967 February | Capital construction - State Education Building - Sidewalks | 42 | 14 |
1965 February-1967 April | Capital construction - State Education Building - Vacuum pumps | 42 | 15 |
1961 August-1962 June | Capital construction - State Education Building - State Library - Archives building | 42 | 16 |
1959 January-1967 February | Capital construction - State Education Building - Fire protection | 42 | 17 |
1962 August-1966 August | Capital construction - State Education Building - Security cages | 42 | 18 |
1964 June-1967 July | Capital construction - Rome - Fire detection system | 42 | 19 |
1959 March-1967 June | Capital construction - Rome - Fire safety | 42 | 20 |
1964 June-1966 January | Capital construction - Rome - Floodlights | 42 | 21 |
1961 December-1964 September | Capital construction - Rome - Floors | 42 | 22 |
1962 February-April | Capital construction - Rome - Removal of hospital building #8 | 42 | 23 |
1965 May-1966 April | Capital construction - Rome - Sanitary sewer line | 42 | 24 |
1962 July-August | Capital construction - Rome - Sidewalks | 42 | 25 |
1959 January-1970 February | Capital construction - Rome - Dormitories | 43 | 1 |
1967 March-1970 February | Capital construction - Rome - Dormitories | 43 | 2 |
1967 June-1969 April | Capital construction - Rome - Dormitories - Electrical work | 43 | 3 |
1966 October-1969 March | Capital construction - Rome - Dormitories - Elevator | 43 | 4 |
1968 April-1970 January | Capital construction - Rome - Dormitories - Equipment | 43 | 5 |
1969 May-1970 January | Capital construction - Rome - Heating | 43 | 6 |
1967 January-1969 April | Capital construction - Rome - Sanitary | 43 | 7 |
1967 April | Capital construction - Rome - Specifications of labor and materials | 43 | |
1962 November-1965 October | Capital construction - Rome - Fallout shelter | 43 | 8 |
1967 February-1969 January | Capital construction - Rome - Heating service connections | 43 | 9 |
1967 June | Capital construction - Rome - Swimming pool | 43 | 10 |
1966 May-1969 February | Capital construction - Rome - Pre-primary building | 43 | 11 |
1966 May-1968 September | Capital construction - Rome - Pre-primary building - Electrical work | 43 | 12 |
1967 April-June | Capital construction - Rome - Pre-primary building - Elevator work | 43 | 13 |
1966 May-June | Capital construction - Rome - Pre-primary building - Food service equipment | 43 | 14 |
1966 May-1968 May | Capital construction - Rome - Pre-primary building - Heating work | 43 | 15 |
1966 May-1968 May | Capital construction - Rome - Pre-primary building - Sanitary work | 43 | 16 |
1962 September-1967 March | Capital construction - Batavia - Civil defense control center | 43 | 17 |
1959 December-1965 July | Capital construction - Batavia - Fallout shelter | 43 | 18 |
1968 June-December | Capital construction - Rome - Demolition-Phase II | 43 | 19 |
1964 May-1968 May | Capital construction - Rome - Pre-primary building - General | 43 | 20 |
1960 November-1961 June | Capital construction - Batavia - - Fire safety 1960 November-1961 June | 43 | 21 |
1959 August-1967 January | Capital construction - Batavia - Vehicle and equipment storage building | 43 | 22 |
1962 May-1965 July | Capital construction - Batavia - Resurfacing of Richmond Avenue | 43 | 23 |
1967 January-1968 February | Capital construction - Batavia - Vehicle and equipment storage building | 43 | 24 |