New York State New Capitol Commission Plans and Drawings Pertaining to the Construction of the State Capitol
Some content may contain outdated and offensive terminology. See: New York State Archives Statement on Language in Descriptive Resources
Overview of the Records
Repository:
New York State Archives
New York State Education Department
Cultural Education Center
Albany, NY 12230
Summary:
This series consists of roughly 1,200 architectural plans and drawings documenting the construction and subsequent renovation
of the New York State Capitol building. The records include floor plans, interior and exterior elevations, alterations, proposed
projects never completed, and details of stone carvings and the building's mechanical systems.
Creator:
Title:
Plans and drawings pertaining to the construction of the State Capitol
Quantity:
Inclusive Dates:
1869-1972
Series Number:
B0700
Scope and Content Note
This series consists of roughly 1,200 architectural plans and drawings documenting the construction and subsequent renovation
of the New York State Capitol building. Much of the Capitol building's history is recorded in these items, which were executed
by Thomas Fuller, Henry Hobson Richardson, Leopold Eidlitz, Isaac Perry and their successors within the State Architect's
Office (created in 1899). The records include floor plans, interior and exterior elevations, alterations, proposed projects
never completed, and details of stone carvings and the building's mechanical systems. Most of the original drawings are on
trace or architect's linen. Plans are drawn with pencil, ink, and/or color washes.
Access Restrictions
There are no restrictions regarding access to or use of the material.
Access Terms
Corporate Name(s):
Geographic Name(s):
Subject(s):
Function(s):
Detailed Description
Contents |
Folder |
Accretion: B0700-85 |
Folder 1 |
1 |
Contents |
DATA DRAWING ASSEMBLY STAIRCASE CAPITOL ALBANY NY |
NORTH WALL NORTH GALLERY 4TH FLOOR (STAIRCASE N) |
NORTH WALLK NORTH GALLERY 4TH FLOOR (STAIRCASE N) |
UNTITLED |
Contents |
ROLL TOP DESK "R" AND LOUNGING BED "E" |
LEATHER BACKS AND PERFORATED LEATHER SEATS F, G, H |
DESKS AND DESK LAMPS D, I, Q |
DESKS O, Y, N |
PERFORATED LEATHER SEATS T, U, K, M, L |
LEATHER COVERED SEATS AND BACKS, Z, V, W, X |
LEATHER COVERED SEATS AND BACKS, E, B, C, A |
Contents |
DETAIL OF STAIRS TAX DEPT ROOM 431 CAP ALBANY NY NC CLAOSEN ARCH IRON CO |
FSD OF LUPTEN STEEL SASH |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
FLOOR AREA STATE DEPARTMENT |
FLOOR AREA STATE DEPARTMENT |
Contents |
STATE CAPITAL ALTERATION FULL SCALE DWG FOR TWO KAL. PARTITIONS SHOP DETAIL 720 |
DETAIL OF STEEL STAIR ROOM 435 STATE TAX DEPT |
DRAWING RACK FRAMES |
DETALS OF STEEL TAX DEPARTMENT ROOM 431 |
F.S. DETAILS SHOWING NEWELS AND STRING ROOM 435 |
Contents |
DUMB WAITER CABINET |
DETAIL OF TWO SPECIAL TRANSOMS IN WEST WALL OF ROOM 609 DEPT OF ARCHITECTURE |
DETAILS OF STAIR TO MEZZANINE AND TRANSOMS ROOM 609 AND STAIR TO MEZZANINE ROOM 409 |
DETAILS OF STRUCTURAL STEEL FOR NEW MEZZANINE IN ROOM 609 DEPT OF ARCHITECTURE |
DETAILS OF STAIR TO MEZZANINE AND TRANSOMS ROOM 609 AND STAIR TO MEZZANINE ROOM 409 |
Contents |
ELECTRIC REPLACEMENTOF ELECTRICAL WORK EAST SECTION INTERIOR FIXTURE FOR ASSEMBLY LOBBY |
SMALL VENTURA LANTERN T-3746081 |
REHABILITATE SLOP SINK ROOM FIRST FLOOR DETAILS |
CAPITOL CONSTRUCTION REHABILITATE SLOP SINK RM FIRST FLOOR PLANS & SECTIONS |
Contents |
FIRST FLOOR |
4TH FLOOR |
5TH FLOOR |
2ND FLOOR |
Contents |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
CONSTRUCTION CAP RESTAURANT CONSTRUCTION |
EAST FAÇADE (NORTH SECTION) |
Contents |
CENTRAL COURT |
PLAN OF FOOTINGS NORTH WEST QUARTER |
PLAN OF FOOTINGS |
PLAN OF FOOTINGS |
PLAN OF FOOTINGS OF CENTER COURT |
Contents |
NEW CAPITAL ALBANY NY NO. 4 SUB CELLAR PLAN |
NEW CAPITAL ALBANY NY NO. 5 BASEMENT FLOOR PLAN |
NEW STATE CAPITAL NY NO. 6 ENTRANCE FLOOR |
STATE LIBRARY PLAN OF GENERAL READING ROOM PRINCIPAL FLOOR #38A |
NY STATE LIBRARY N0 33 |
Contents |
Item |
Folder |
SECTION THROUGH EAST CHIMNEY OVER SENATE CHAMBER |
|
|
11 |
ASSEMBLY GALLERY MARK AS XC |
|
|
11 |
DWG SHOWING CORBELS SUPPORTING CEILING OF SENATE CHAMBER EXPOSED FACES LEFT ROUGH FOR CARVING |
|
|
11 |
UNTITLED |
|
|
11 |
UNTITLED |
|
|
11 |
Contents |
PLAN & SECTION OF RED GRANITE BEAMS FOR CEILING OF EAST CORRIDOR WESTERN |
SECOND STORY PLAN |
PLAN OF FOOTINGS OF CENTER COURT |
FIRST STORY PLAN |
ELEVATION AS BUILT OF WEST CHIMNEY SOUTH EAST PAVILION |
Contents |
DETAIL OF WEST CHIMNEY SOUTH EAST PAVILION |
SECTION THROUGH SOUTH CHIMNEY ON COURT |
DORMER WINDOWS ON NORTH SIDE OF ASSEMBLY CHAMBER |
BASEMENT PLAN |
ROOF OVER PAVILION |
Contents |
ELEVATION ON HAWK STREET NO 3 |
ELEVATION ON PARK DWG NO 1 |
ELEVATION ON WASHINGTON AVE. NO 2 |
MAP OF LOTS PROPOSED TO BE TAKEN BY THE STATE FOR ENLARGING THE NEW CAPITOL GROUNDS IN BLOCK BOUNDED BY HAWK, SWAN, STATE
STS & WASHINGTON AVE
|
MAP OF LOTS PROPOSED TO BE TAKEN BY THE STATE FOR ENLARGING THE NEW CAPITOL GROUNDS IN BLOCK BOUNDED BY HAWK, SWAN, STATE
STREETS AND WASHINGTON
|
Contents |
PLAN OF FIRST COURSE OF FOOTINGS OUTSIDE WALLS |
FRONT EAGLE STREET |
PLAN OF TOWER FOOTING |
PORTION OF MAP # 6 OF CITY OF ALBANY |
PLAN OF FIRST COURSE OF FOOTINGS OF OUTSIDE WALLS |
Contents |
WIRING PLAN FOR ROOM 260 |
UNTITLED |
EAST CORRIDOR VENTILATING PLAN OF FOURTH FLOOR TOWER |
ELEVATION SHOWING TRUSS AND POSTS SUPPORTING DIAGONAL RIBS IN LARGE CENTRAL ARCH ASSEMBLY CHAMBER |
BASEMENT FOUNDATIONS OF WEST STAIRCASE |
Contents |
SECTION THROUGH CENTER OF EASTERN APPROACH |
PLAN OF DRIVEWAY EASTERN APPROACH |
PLAN OF VENTILATING DUCTS CMSN RM 2ND FLOOR |
DRIVEWAY 798-10 |
CENTER OF DRIVEWAY 798-54 |
Contents |
SUPPORT OF GALLERY SENATE CHAMBER |
GIVING BASE OF GREAT COLUMNS OF GALLERY SENATE CHAMBER, ARRANGEMENT OF BALUSTRADE |
UNTITLED |
EAST FRONT DETAIL OF GABLE (SIDE) #10 |
ELEVATION OF SOUTH WALL STATE LIBRARY |
798-33 |
Contents |
DETAIL OF NORTH EAST CHIMNEY ON SENATE CHAMBER ROOF |
DRIVEWAY & EASTERN APPROACH |
DETAILED SECTION EAST & WEST THROUGH CENTER EASTERN APPROACH 798-20 |
ELEVATION OF OUTER FACE OF ARCH PRINCIPAL FLOOR WESTERN STAIRCASE |
UNTITLED |
Contents |
DETAIL OF NORTH WEST CHIMNEY OF SENATE CHAMBER ROOF |
DRIVEWAY 798-31 |
PLAN OF CEILING OVER DRIVEWAY EASTERN APPROACH |
798-36 |
ELEVATION ON LINE O NORTH LOOKING TOWARD STATE LIBRARY |
Contents |
798-38 |
PRINCIPAL FLOOR DETAILS HALF PLAN OF BEAMS & PANELS FOR CEILING EAST & WEST CORRIDOR WESTERN STAIRCASE |
FOUNDATION PLAN OF EASTERN APPROACH BACK TO FRONT WALL OF ROADWAY |
PLAN OF IRON BEAMS FOR PLATFORM TOP OF FOURTH RUN EASTERN APPROACH |
PLAN OF EASTERN ENTRANCE (TAKEN ON TOP OF ABACUS) SECOND FLOOR |
Contents |
CENTRAL DORMER WINDOW ON EAST FRONT |
UNTITLED |
SECTION OF FOUNDATION |
CENTRAL DORMER WINDOWS ON EAST FRONT (CORRECT DWG) |
ELEVATION OF WINDOWS SECOND FLOOR TOWER EAST SIDE OF CENTRAL COURT |
Contents |
PLAN OF CEILING EASTERN APPROACH |
ELEVATION ON TRANSVERSE TRESTLE |
PLAN SHOWING CONSTRUCTION OF TIE BEAMS |
PLAN OF ELECTRIC LIGHTING PORTICO LOBBIES & TOWER |
WEST WALL WEST CORRIDOR WESTERN STAIRCASE AT CEILING OF 4TH FLOOR |
Contents |
PLAN & ELEVATION ABOVE LINTEL OF SOUTH CORRIDOR WESTERN STAIRCASE |
PLAN OF N & S BALCONY GALLERY FLOOR WESTERN STAIRCASE |
PLAN OUTSIDE DOUBLE DOORS FOR WEST ENTRANCE LOBBY |
CLOSET PARTITION NORTH EAST SIDE OF WESTERN STAIRCASE FIRST STORY |
UNTITLED |
Contents |
UNTITLED |
UNTITLED |
NORTH & SOUTH PORCHES 1A |
FOURTH FLOOR SOUTH CORRIDOR WESTERN STAIRCASE 30 |
UNTITLED |
Contents |
WAINSCOTING ENTRANCE FLOOR NORTH WEST CORRIDOR |
MEZZ FLOOR OFFICE OF SUPT OF PRISONS |
SKYLIGHT OVER SOUTH EAST STAIRCASE, MAIN TRUSSES |
GALLERY & MEZZANINE PLAN |
SOUTH EAST STAIRCASE SECTION THROUGH LINE C-D LOOKING SOUTH |
Contents |
WINDOWS IN EAST & SOUTH WALLS OF SENATE STAIRCASE |
SOUTH EAST STAIRCASE SECTION THROUGH LINE C-D LOOKING NORTH |
PRINCIPAL FLOOR PLAN SHOWING LOCATION OF ELECTRIC LIGHT WIRES, STEAM, GAS & OTHER PIPES |
DETAIL AT E-F OF SECTION ON LINE A-B LOOKING EAST |
SOUTH EAST STAIRCASE |
Contents |
GALLERY FLOOR PLAN SHOWING LOCATON OF ELECTRIC LIGHT WIRES, STEAM, GAS, WATER & OTHER PIPES |
GROUND FLOOR PLAN SHOWING LOCATION OF ELECTRIC LIGHT WIRES, STEAM, GAS & OTHER PIPES |
PRINCIPAL FLOOR ELEVATION OF STAIRCASE SIDE OF EAST & WEST CORRIDORS WESTERN STAIRCASE |
UNTITLED |
PLAN & ELEVATION ABOVE LINTEL OF NORTH CORRIDOR WESTERN STAIRCASE |
Contents |
CEILING FRAMING OF ASSEMBLY CHAMBER |
PLANS OF GIRDERS & PANELS-BEAMS FOR ASSEMBLY-CEILING FOR SULLIVAN EHLERS |
PLAN OF ASSEMBLY FLOOR |
ELEVATION OF TRANSVERSE TRESTLE |
UNTITLED |
Contents |
TRANVERSE SECTION THROUGH ASSEMBLY CHAMBER FOR SULLIVAN AND EHLERS |
LONGITUDINAL SECTION THROUGH ASSEMBLY CHAMBER FOR SULLIVAN AND EHLERS |
GIRDERS FOR STAIRCASE (ASSEMBLY) FOR SULLIVAN AND EHLERS 788-1 |
ASSEMBLY CEILING GIRDER D FOUR FOR SULLIVAN AND EHLERS |
PLAN OF FLOOR BEAMS OVER ASSEMBLY CEILING FOR SULLIVAN AND EHLERS |
Contents |
EASTERN APPROACH CIRCULAR CORNER PLAN OF NORTH CORNER THROUGH BALUSTER |
PLAN OF STAIRCASE FOUNDATION AS ORIGINALLY CONSTRUCTED |
UNTITLED |
ASSEMBLY CHAMBER CEILING |
GIRDER ON CENTER LINE WITH SECTIONS |
Contents |
ASSEMBLY CHAMBER DESIGN OF PAPIER MACHE CEILING |
DETAIL OF WINDOW OPENINGS EAST SIDE OF EAST CORRIDOR (COURT WALL) 3RD FLOOR WESTERN STAIRCASE |
UNTITLED |
NORTH WALL NORTH GALLERY 4TH FLOOR |
WESTERN STAIRCASE |
Contents |
ELEVATION OF NORTH & SOUTH SIDES OF STAIRCASE GALLERY FLOOR DETAIL |
PLAN OF FOUNDATION STONES UNDER NEW FRONT GABLE |
PLAN OF FOUNDATION STONES UNDER NEW FROUNT GABLE |
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
PLAN OF FOUNDATION STONES UNDER NEW FRONT GABLE |
Contents |
ELEVATION OF CURVED BALCONIES NORTH & SOUTH SIDE THIRD FLOOR WESTERN STAIRCASE |
TRANSVERSE SECTION THROUGH CENTRAL READING ROOM LOOKING SOUTH |
PLAN OF PORTION OF ENTRANCE SHOWING PROPOSED ALTERATIONS IN GOLDEN CORRIDOR & COURT OF APPEALS 2ND DIVISION |
PLAN OF CIRCULAR CORNERS SOUTH SIDE OF EASTERN APPROACH |
SECTION THROUGH WEST CHIMNEY SOUTH EAST PAVILION |
Contents |
GALLERY FLOOR DETAILS PANELS FOR CEILING EAST CORRIDOR |
GALLERY FLOOR DETAILS PLAN OF I BEAMS EAST CORRIDOR |
FOUNDATION PLAN SHOWING IRON BEAMS EASTERN APPOACH |
PLAN OF TERRACE SOUTH EAST CORNER |
PLAN OF AREA SOUTH SIDE EAST TERRACE |
Contents |
PLAN OF APPROACH SHOWING BASE COURSE & FOUNDATION UNDER PORTICO |
PLAN OF CIRCULAR CORNER EASTERN APPROACH |
PLAN OF TERRACE SHOWING FLAGGING 798-13 |
PLAN & ELEVATION OF NORTH SIDE OF NORTH CORRIDOR, WESTERN STAIRCASE |
EASTERN APPROACH-CIRCULAR CORNER PLAN OF NORTH CORNER THROUGH BALUSTERS |
Contents |
WEST SIDE OF WEST CORRIDOR WESTERN STAIRCASE GALLERY FLOOR |
PRINCIPAL FLOOR DETAILS, PANELS FOR CEILING, WEST CORRIDOR, WESTERN STAIRCASE |
NORTH SIDE OF NORTH CORRIDOR WESTERN STAIRCASE GALLERY FLOOR |
EAST SIDE OF WEST CORRIDOR WESTERN STAIRCASE |
NORTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
WEST ELEVATION SOUTHEAST SUPPORT GIRDERS OVER WESTERN STAIRCASE |
Contents |
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR GALLERY FLOOR |
IN SCALE DRAWING OF THIRD RUN OF STEPS EASTERN APPROACH 798-26 |
WESTERN STAIRCASE #12 SECTION ON LINE R-S ELEVATION OF EAST WALL GROUND FLOOR |
PLAN SHOWING LIGHT TELEPHONE & FIRE ALARM OUTLETS ROOMS 306 307 308 THIRD FLOOR |
UNTITLED |
Contents |
DWG OF EAST FRONT ENTRANCE FLOOR |
EASTERN APPROACH DETAILS PLAN OF IRON BEAMS SOUTH SIDE TERRACE |
ELEVATION & PLAN SHOWING RAIL CONNECTION WITH PEDESTAL AT THE EAST INTERSECTION OF DRIVEWAY & SOUTH SIDE TERRACE NO 798-42 |
PLAN OF CEILING WESTERN APPROACH & PORTICO |
FLOOR PLAN |
Contents |
PLAN & ELEVATION OF SOUTH SIDE OF WEST LOBBY |
PLAN & ELEVATION OF WEST SIDE OF WEST CORRIDOR WESTERN STAIRCASE |
SECTION THROUGH SOUTH CORRIDOR LOOKING SOUTH GALLERY & ATTIC FLOORS |
PLAN OF EAST ENTRANCE ENTRANCE FLOOR |
ELEVATION OF SOUTH WALL EAST ENTRANCE SECOND FLOOR |
Contents |
FOUNDATION PLAN WESTERN APPROACH & PORTICO |
ELEVATION OF NORTH WALL EAST ENTRANCE SECOND FLOOR |
TERRA COTTA FINIAL FOR NORTH EAST PAVILLION |
EAST SIDE OF EAST CORRIDOR GALLERY FLOOR WESTERN STAIRCASE |
PLAN OF DOME OVER WESTERN STAIRCASE |
Contents |
PLAN ELEVATION & SECTION OF NORTH CORRIDOR ROOF |
GALLERY FLOOR DETAILS HALF ELEVATION OF EAST & WEST SIDES OF STAIRCASE LOOKING FROM CENTER |
PLAN OF LIGHTING DOME OVER WESTERN STAIRCASE |
ELEVATION OF NORTH & SOUTH WALLS GALLERY FLOOR WESTERN STAIRCASE |
PLAN OF CEILING WESTERN STAIRCASE |
Contents |
SECTIONS THROUGH SOUTH EAST PAVILION SHOWING OFFICES FOR STATE HISTORIAN |
ALTERATIONS AND REPAIRS CAPITOL BOILER HOUSE ALBANY NY NO 1 |
SECOND FLOOR PLAN OF MAIN TOWER SHOWING NEW PARTITIONS ETC FOR NY DEPT OF THE GAR DWG NO 1 |
FRAMING PLAN OF EAST ENTRANCE ENTRANCE FLOOR |
ELEVATION SHOWING BALUSTERS & RAIL ON THIRD FLOOR WEST SIDE OF CENTRAL COURT |
Contents |
ENCLOSED PASSAGE IN CAPITOL COURT DWG NO 1 |
ENCLOSED PASSAGE IN CAPITOL COURT DWG NO 2 |
ELEVATION & SECTION OF NEW ROOM LOOKING EAST |
UNTITLED |
UNTITLED |
Contents |
UNTITLED |
NEW TRANSOM OPENERS FOR ROOMS 516 & 522 |
ACCESS DOOR & FRAME AT THIRD FLOOR CORRIDOR OPPOSITE RM #308 LOCK FOR WASTE PAPER CHUTE DOOR 1ST FLOOR |
UNTITLED |
UNTITLED |
Contents |
PARTITIONS & GALLERY IN GENERAL OFFICE STATE CIVIL SERVICE COMMISSION |
UNTITLED |
VENTILATING WORK & CHANGES IN GOVERNOR'S OFFICES SECTIONS SHOWING PRESENT WORK DWG NO 3 |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE EQPT OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 SECOND FLOOR |
Contents |
VENTILATING WORK GOVERNOR'S OFFICES PLANS SHOWING NY NO 4 |
GALLERY IN OFFICE OF SECRETARY OF STATE |
DORMER ON NORTH ROOF ETC |
ALTERATIONS DEPT OF LABOR N0 32 |
5TH FLOOR SOUTH EAST PAVILLION ELEVATION AND SECTION |
STANDARD DETAIL ELECTRIC FIXTURES |
Contents |
FIFTH FLOOR CORRIDOR FROM SOUTH EAST PAVILLION TO ELEVATIORS TILING |
FIFTH FLOOR SOUTH EAST PAVILION PLAN OF NEW ROOMS |
COURT OF APPEALS VENTILATING SYSTEM |
ALTERATIONS IN TOWER ROOM 5TH FLOOR |
Contents |
INSTALLING NEW ELECTRIC PLANT ENGINES GENERATORS & SWITCHBOARD |
DATA SHEET TABLE OF PRESENT PIPING NY ST CAPITOL ALBANY NY ALTERATIONS TO PLUMBING |
DATA ASSEMBLY STAIRCASE CAP ALBANY |
ASSEMBLY STAIRCASE CAPITOL ALBANY |
STANDARD DETAILS SHOWING INSTALLATION OF ELECTRIC CONDUIT BOXES & OPEN WEATHERPROOF WIRING ON CHANNEL BARS |
Contents |
PROPOSED LIBRARY SITE PORTIONS OF MAP & DIAGRAMS Q & R CITY OF ALBANY DATA DRAWING |
CAPITOL REMOVING TOWER WALLS ABOVE SIXTH STORY |
REMOVING & REPLACING COLUMNS FIRST STORY ASSEMBLY STAIRCASE |
DATA DRAWING NEW YORK STATE CAPITOL ALBANY NY |
STANDARD DETAIL COMBINATION GAS & ELECTRIC FIXTURES |
Contents |
ALTERATIONS IN TOWER ROOM 5TH FLOOR AMENDING DWG 122 |
ALTERATIONS TO PLUMBING |
NEW YORK STATE CAPITOL |
METALLIC LEDGER DESK CLERKS OFFICE EXECUTIVE DESK |
ELEVATION OF MEZZ FLOOR CLERK'S OFFICE EXEC DEPT |
Contents |
PLANS OF MEZZANINE FLOOR EXEC DEPT |
MEZZANINE FLOORS OFFICES OF PUBLIC SERVICE COMM FIRST FLOOR |
ELECTRIC TABLES & DIAGRAMS OFFICES OF PUBLIC SERVICE COMMISSION 1ST & 2ND FLOOR |
WOOD GLAZED PARTITIONS FOR OFFICES, DEPT OF PUBLIC WORKS FIRST FLOOR OF TOWERS |
NEW RAILING ANTE ROOM EXEC CHAMBER |
Contents |
MEZZ FLOOR OFFICE OF FOREST FISH & GAME COMM |
ENLARGING & IMPROVING POST OFFICE FACILITIES |
ST ARCHITECT'S OFFICE ONE CASE OF DRAWERS |
CHANGES IN STORE ROOM FISCAL SUPERVISOR'S OFFICE 5TH FLOOR |
TRANSOM SASH ENLARGING & IMPROVING POST OFFICE FACILITIES |
Contents |
OFFICES ON 1ST FLOOR SOUTH ENTRANCE DEPT OF STATE INSURANCE ELEVS PLANS & SECTIONS |
PARTITION FOR PORTER'S CLOSET UNDER ASSEMBLY STAIRCASE 1ST FLOOR |
NEW GLASS PARTITION PRISON DEPT ELEV & DETAILS |
METAL FILING CASES NY ST FISCAL SUPERVISORS OFFICE |
CHANGES IN CLERKS ROOM FISCAL SUPERVISOR'S OFFICE 5TH FLOOR |
Contents |
METAL FILING CASES FOR THE ADJUTANT GENERAL'S OFFICE |
ALTERATIONS IN OFFICE OF SUPERINTENDENT OF PRISONS CONSTRUCTION & ELECTRIC WORK |
ALTERATIONS TO GIRDER G30 |
UNTITLED |
UNTITLED |
Contents |
UNTITLED |
UNTITLED |
UNTITLED |
UNTITLED |
PLAN ONE HALF SOUTH EAST |
Contents |
DETAIL OF KALAMEINED DOORS |
OFFICES OF THE SECRETARY OF STATE NEW FINISH FLOORS |
SKETCH OF LATRINE FOR CAPITOL WORKMEN |
SKLIGHT IN PURCHASING COMMITTEE'S ROOM FISCAL SUPERVISORS OFFICE FIFTH FLOOR |
UNTITLED |
Contents |
DETAIL OF DOOR BETWWEN ROOMS 213 & 214 ATTORNEY GENERALS OFFICE |
FOURTH FLOOR MEZZ FRAMING ALTERATIONS |
ALTERATIONS TO ELEVATOR SHAFT SOUTH OF CENTER SECTION |
ALTERATIONS TO 3RD STORY PLAN SHOWING 4TH FLOOR FRAMING |
ALTERATIONS & NEW WAINSCOTING IN ROOM 200 EXEC OFFICES |
Contents |
GIRDERS G22-G27-G28-G29 |
GIRDERS G24-G25 ALTERATIONS |
GIRDERS G23 & G26 FOURTH FLOOR ALTERATIONS |
GIRDERS G14-G15-G16-G17 FIFTH FLOOR |
GIRDER G11 FIFTH FLOOR ALTERATION |
Contents |
GIRDER G21 FIFTH FLOOR ALTERATIONS |
ALTERATIONS TO 4TH STORY PLAN SHOWING 5TH FLOOR FRAMING |
ALTERATIONS TO STATE CAPITOL BUILDING |
ALTERATIONS TO FIFTH FLOOR TRUSS T2 |
FIFTH FLOOR GIRDERS G12-G13-G19-G20 |
Contents |
ALTERATIONS TO STATE CAPITOL |
GIRDERS G5 & G8 ALTERATIONS TO CEILING GIRDERS |
GIRDERS G6 & G7 ALTERATIONS TO CEILING GIRDERS |
UNTITLED |
ALTERATIONS TO 5TH STORY PLAN SHOWING CEILING FRAMING |
Contents |
HIP RAFTERS HR1 TO HR6 TOWER ALTERATIONS |
UNTITLED |
UNTITLED |
UNTITLED |
BOOKSHELVES-ATTORNEY GENERAL'S OFFICE ROOM 208 |
Contents |
VALLEYS ALTERATIONS |
CEILING GIRDERS G3-G4 ALTERATIONS |
COLUMNS C1-C2-C3-C4 ALTERATIONS |
ALTERATIONS TO FIRST SECOND & THIRD FLOOR FRAMING |
COLUMNS C5 TO C12 (INCL) ALTERATIONS |
Contents |
ALTERATIONS TO GIRDERS G9-G10 |
STEEL FILING CASES FOR INSURANCE DEPT |
DETAIL OF DORMERS SOUTH WEST TOWER ALTERATIONS |
GIRDER G2 & PLATES P2-P3-P4 TOWER GIRDERS |
GIRDER G1 & PLATE P1 ALTERATIONS TOWER GIRDERS |
Contents |
VALLYS & DORMER RAFTERS ALTERATION |
ALTERATIONS TO FRAMING IN NORTH & SOUTH ELEVATOR SHAFTS |
ALTERATION TO HIP RAFTERS R7R/L |
HIP RAFTERS ALTERATIONS |
ALTERATIONS TO ROOF FRAMING PLAN |
Contents |
TOWER RAFTERS HANGERS ETC |
OFFICE PARTITION DEPT OF WEIGHTS & MEASURES ROOM 429 |
ALTERATIONS TO VALLYS & RAFTERS SOUTH WEST TOWER |
ALTERATIONS TO TEE PLAN |
ALTERATION TO SOUTH WEST TOWER & ROOFS EAST OF TOWER |
Contents |
Accretion: 20916-07 |
PROPOSED STEEL SHELVING FOR ATTORNEY GENERAL'S ROOM 210 |
Accretion: B0700-85 |
PROPOSED STEEL FILES FOR ATTORNEY GENERAL'S ROOM 215 |
SCALE & FULL SIZE DETAILS OF 5TH STORY COURT WINDOWS |
DETAIL SECTION AT BASE OF WEST DORMERS |
EXTRA LINTELS OVER 5TH FLOOR ELEVATION OPENINGS |
Contents |
DETAIL OF FLUES IN EAST CHIMNEY OF SOUTH WEST TOWER |
DOUBLE SWING DOOR IN PARTITION OF ROOM 121, STATE FIRE MARSHALL |
STEEL FILING CASE IN OFFICE OF FISCAL SUPERVISOR OF STATE CHARITIES |
ALTERATIONS TO INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES SOUTH SIDE ALSO CONCEALED PLUMBING WORK |
ALTERATIONS DETAILS OF INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES S SIDE ALSO CONCEALED PLUMBING WORK |
Contents |
PLAN OF ST ARCHITECT'S OFFICE ON 4TH FLOOR |
STATE ARCHITECT'S OFFICE DETAILS OF CABINET |
ALTERATIONS TO NORTH & SOUTH BULKHEADS ON ROOFS EAST OF TOWERS |
FLOOR PLANS |
FLOOR PLANS |
Contents |
PLAN OF STATE ARCHITECT'S OFFICE ON 5TH FLOOR |
NEW PARTITIONS FOR ROOMS 220 & 221 SECOND FLOOR |
DETAILS OF PLASTER CORNICE FOR ROOM 218 2ND FLOOR |
DETAILS OF SOUTH ELEVATOR SHAFT & DOORS TO SAME NORTH SHAFT |
ALTERATIONS TO FLOOR FRAMING OF TOILETS SHOWING POSITION OF FLOOR BEAMS |
ALTERATIONS RESTORING SANDSTONE & SKYLIGHT OVER SOUTH CORRIDOR WEST STAIRCASE FOURTH STORY |
Contents |
RECONSTRUCTION OF CORRUGATED IRON DOORS FOR STORE ROOMS IN BASEMENT |
ALTERATIONS TO METAL WINDOW FRAMES SASH & GLAZING DETAILS |
ALTERATIONS TO SKETCH & DETAIL OF TERRA COTTA CRESTING ON MAIN ROOF AT N & S TOWERS |
ALTERATION TO HEATING & VENTILATION ELECTRIC-ATTIC FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION DETAILS OF STEAM WORK IN BASEMENT |
ALTERATIONS HEATING & VENTILATION DETAILS OF FLUES IN TOILET ROOMS |
Contents |
ALTERATIONS HEATING & VENTILATION ELEVATIONS OF INDIRECT SYSTEM IN BASEMENT |
ALTERATIONS TO HEATING & VENTILATION DETAILS OF INTAKES & DUCTS |
ALTERATIONS TO HEATING & VENTILATION PLUMBING 4TH FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION PLUMBING 5TH FLOOR PLAN |
ALTERATION TO HEATING & VENTILATION DETAILS OF STACKS DOORS & FLUES |
Contents |
PLAN SHOWING LOCATION OF OFFICES OF STATE TREASURER & STATE BOARD OF TAX CMSNS |
ALTERATIONS TO ELECTRIC WORK WIRING TABLES |
EXIT FROM ROOM 609 & IRON STAIRS ATTIC |
DETAILS OF PLASTER CORNICE FOR ROOM 244 SECOND STORY |
REVISED DETAIL OF PLASTER CORNICE FOR ROOM 218 SECOND FLOOR FULL SIZE |
Contents |
STRUCTURAL STEEL FOR MEZZANINE FLOOR REFINISHING ROOMS |
ALTERATIONS DETAILS OF INSTALLATION OF HEAT & VENT FLUES IN 1ST & 2ND STORIES NORTH SIDE ALSO CONCEALED PLUMBING WORK IN MEZZANINE
FL CONSTRUCTION RM
|
REFINISHING OFFICES OF THE STATE TEASURERS 1ST FLOOR PLAN |
REFINISHING OFFICES FOR THE EXCISE DEPT IRON CIRCULAR STAIRCASE & MEZZANINE RAILING FOR ROOM 244 |
GLAZED PARTITIONS & TELEPHONE BOOTH REPAIRS IN OFFICES OF EXCISE DEPARTMENT |
Contents |
NEW PARTITION IN ROOM 115 INSURANCE DEPT |
ALTERATIONS TO OPENINGS IN FLOOR OF ATTIC FOR CEILING LIGHTS IN CENTER SECTION |
REFINISHING OFFICES FOR THE STATE COMMISION IN LUNACY FIRST STORY |
DETAILS OF NEW WOOD WORK IN CONNECTION WITH REFINISHING ROOMS 135 & 234 |
ALTERATIONS DETAIL SHOWING VENTILATING DUCT FOR THE REAR ASSEMBLY LOBY 3RD FLOOR |
Contents |
STATE ARCHITECTS OFFICE EQUIPMENT & FILING ROOM 403 |
FULL SIZE DETAILS OF NORTH & SOUTH BULKHEADS ON DOORS EAST OF TOWERS |
DETAIL OF KALAMINED DOOR |
ALTERATIONS OF STAIRS AND DOORS TO PROVIDE FOR ACCESS TO ATTIC FROM FIFTH FLOOR |
CIVIL SERVICE COMMISSION FLOOR PLAN OF OFFICES |
Contents |
FINISHING OFFICES FOR LUNACY COMMISSION BRONZE SADDLES FOR DOORS ROOMS 124 126 127 |
NEW IRON STAIRS TO BASEMENT |
MOVING ELEVATOR TANK |
NEW PARTITION & ALTERATIONS TO CASE ROOM 413 |
REFINISHING REAR ASSEMBLY LOBBY |
Contents |
CAPITOL REPAIRS ELECTRIC MANHOLE ENGINE ROOM |
SHAFTING SUPPORTS FOR PRESENT WATER FILTERING APPARATUS |
REFINISHING OFFICES OF THE EXCISE DEPARTMENT SECOND FLOOR |
FULL SIZED DETAIL OF PLASTER COVE IN TOILET ROOMS |
PAINTING, DECORATING & CERTAIN ALTERATIONS & REFINISHING OFFICES OF SUPERINTENDANT OF INSURANCE |
Contents |
ALTERATIONS TO ST CAP ALBANY NY DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
ALTERATIONS ST CAP ALBANY NY DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
PLAN DETAIL OF SETTING & ANCHORING TERRA COTTA HIPS ALTERATIONS |
OFFICES-INSURANCE DEPT STEEL FITTING FOR OFFICE ROOM NO 117 |
OFFICES-INSURANCE DEPT STATE CAPITOL ALBANY NY STEEL FITTING FOR GENERAL OFFICE ROOM #117 PLANS AND DETAIL |
Contents |
DETAILS OF ELEVATION SCREENS DOORS & CAR ALTERATIONS |
ELEVATIONS FOR THE STATE CAPITOL DETAILS OF ELEVATIONS PITS |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
Contents |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
DETAIL FOR SETTING & LOCATION OF METAL WINDOW FRAMES |
REWIRING OF STATE CAP ALBANY NY ROOM NO 610 |
DETAIL OF RAIL & GATE BETWEEN ROOMS 244 & 245 EXCISE DEPT |
Contents |
DETAILS OF DOOR & SCREEN BETWEEN ASSEMBLY REAR LOBBY & SPEAKERS ROOM |
REWIRING OF ST CAP ALBANY NY SPECIAL FITTINGS |
PRIVATE ELEVATOR FOR THE ST ARCHITECT'S OFFICE |
ALTERATIONS OF PARTION WORK IN ROOM 138 |
DUMBWAITER FOR ST ARCHITECT OFFICE |
Contents |
WEST CORRIDOR 4TH FLOOR WEST ELEVATION |
F S D OF IRONWORK FOR CEILING CORNICE ROOM 342 |
TREASURERS OFFICE METAL FURNITURE |
PROPOSED PARTITION IN THE STATE ARCHITECTS PRIVATE OFFICE |
ROOM NO 260 PANELED PARTITION |
Contents |
NEW BOOK SHELVES IN ROOM 200 EXECUTIVE OFFICES |
FINISHING ROOMS & CORRIDORS STONEWORK AROUND DOORS TO ROOMS 435, 436 & 437 |
SAFETY PLATES FOR ELEVATOR DOOR SADDLES |
PARTITION BETWEEN ROOMS 228 & 229 |
PLAN AND DETAILS OF PARTITION FOR ST HOSPITAL COMMISSION'S OFFICE RM 124 CAPITOL ALBANY NY |
Contents |
ENTRANCE TO ASSEMBLY EAST & WEST CORRIDOR 3RD FLOOR 3/4 INCH DETAIL OF ARTIFICIAL STONE WORK CORRIDORS |
THIRD FLOOR & CORRIDORS PLANS SHOWING METHOD FOR SETTING GRANITE BASE COURSE |
FULL SIZE DETAIL REVISING PROFILE OF ARCHES OVER WINDOWS ROOM 337 |
DETAILS OF CAST IRON SADDLES FOR DOOR TO PRIVATE ELEVATOR ROOM 609 |
THIRD FLOOR NORTH CORRIDORS PLAN SHOWING METHOD FOR SETTING GRANITE BASE COURSE |
Contents |
PLAN OF ARCH TO SENATE GALLERY MARK SG |
CHANGING ARCHED OPENING TO SQUARE HEADS ON 4TH FLOOR CORRIDORS |
PARTITION IN ROOM 609 |
FINISHING ROOMS & CORRIDORS LOCATION OF DISTRIBUTING BOXES J & I |
ALTERATIONS TO ELECTRIC WORK SECRETARY OF STATE OFFICES ROOMS 253-261 |
Contents |
ALTERATION TO TOILET ROOM DOORS OPENING #401, 443, 507 & 536 |
ASSEMBLY CHAMBER-LOBBIES & OFFICES REPAIR TO CEILING BENCHES IN WOMEN'S GALLERY SPACES TO BE CARPETED |
FINISHING ROOMS & CORRIDOR |
CHANGING ARCHED DOOR OPENINGS TO SQUARE HEADS ON FOURTH FLOOR CORRIDORS |
CHANGING ARCHED OPENING 402 ON EAST CORRIDOR FOURTH FLOOR |
Contents |
ASSEMBLY CHAMBER |
ALTERATION TO OFFICE OF SUPERINTENDENT OF PRISONS |
STEEL SUPPORTS FOR LIGHTING FIXTURES OF ASSEMBLY CHAMBER |
DETAIL OF DOORS TO STORE ROOMS UNDER WEST STAIRCASE FIRST FLOOR |
ENGINEERING WORK CAPITOL RECONSTRUCTION CHANGES TO EXHAUST AND STEAM PIPING IN BASEMENT |
FINISHING ROOM 608 |
Contents |
EAST CORRIDOR FOURTH FLOOR WEST SIDE |
NEW STEEL LOCKERS ARCHITECTURAL DRAUGHTING RM STATE ARCHITECTS OFFICE |
DETAIL OF CEILING LIGHT ROOM 608 |
FS PROFILE OF CORNICE UNDER SOUTH MEZZANINE THIS DWG REVISES PROFILE SHOWN ON DWG 520 |
DETAILS KALAMEIN ELEVATOR DOORS |
Contents |
FIXTURE DRAWING NO 2003 |
FIXTURE DRAWING NO 2015 |
FIXTURE DRAWING NO 2001 |
FICTURE DRAWING 2016 |
THIRD STORY PLAN |
Contents |
CAPITOL ASSEMBLY SIDE PLAN OF ROOMS 303-4 & 5 3RD FLOOR |
UNTITLED |
LEATHER BACKS PERFORATED LEATER SEAT |
UNTITLED |
PLAN OF ALTERATIONS & FILING CASES OF ROOMS 204,205, & 206 |
FOURTH STORY PLAN |
FIFTH STORY PLAN |
Contents |
PUBLIC SERVICE CMSN DISTRICT #2 CHANGES IN PARTITIONS IN SECRETARY'S OFFICES RM #104 |
FIXTURE DRAWING NO 2004 |
FIXTURE DRAWING NO 2002 |
FIXTURE DRAWING NO 2007 |
FIXTURE DWGS 2008, 2009, 2010, 2011, 2012, 2013, AND 2014 |
Contents |
SUPPORT FOR MARBLE FIREPLACE MANTLE, MANTLE IN ROOM 342 |
DETAIL OF TWO TIE RODS ON TRUSS ROOM 608 |
NEW PARTITION FOR ROOM 139 DEPT OF PUBLIC BLDGS |
RENEWING STONEWORK WEST STAIRCASE CORRIDOR FOURTH FLOOR |
GROIN ARCH CEILINGS WEST STAIRCASE CORRIDOR THIRD FLOOR |
Contents |
RENEWAL OF STONEWORK THIRD & FOURTH FLOORS |
NY STATE CAPITOL BLDG ALBANY, NY |
ENLARGED DOOR OPENINGS TO 4TH FLOOR & 5TH FLOOR TOILETS |
FINISHING ROOMS & CORRIDORS |
DETAIL OF DOOR JAMBS FOR GLASS CONTRACTORS INFORMATION IN CUTTING GLASS FOR DOOR REVEALS IN TOILET ROOMS |
Contents |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Contents |
PLANS & SECTIONS OF ROOMS 337 A & B FINISHING CERTAIN RMS & CORRIDORS IN THE THIRD STORY |
ALTERATIONS & FINISH OF 4TH FLOOR ROOMS 407-408 -409 |
DEPT OF ARCHITECTURE FILING CASES FOR ROOM 608 |
BASE & FLOOR CONSTRUCTION ROOMS 337 A & B FINISHING RMS & CORRIDORS THIRD FLOOR |
FINISHING 5TH FLOOR ROOMS FOR NY STATE DEPT OF HEALTH |
Contents |
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH |
FILING CASES & DRAWERS DEPT OF ARCHITECTURE RM 609 |
FINISHING ROOMS & CORRIDORS NORTH STAIR MARBLE MARBELITAIC LAYOUT |
3/4 IN SCALE DETAIL OF TOWER STAIRWAYS MEZZ TO SIXTH FLOOR |
FINISHING ROOMS & CORRIDORS |
Contents |
ALTERATIONS FOR ROOM 426 |
SEATS IN SENATE CHAMBER |
FINISHING ROOMS & CORRIDORS DETAIL OF MEZZ LANDINGS |
DETAILS OF LOUVER VENTILATOR FOR SENATE & HEALTH DEPT VENTILATING SYSTEM |
FINISHING CERTAIN ROOMS & CORRIDORS DETAIL OF CI FASCIAS AT WINDOW ROOMS 337-A & B |
NEW TRANSOM BAR DOOR BETWEEN ASSEMBLY CLERK'S OFFICES |
Contents |
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH CEMENT INCLINE & RAILING |
DETAIL OF FRAMES FOR TEMPORARY GATES IN CORRIDORS |
DETAILS OF BULLETIN BOARD & FIREBACKS FOR ROOMS 332 337 342 |
INSURANCE DEPT BOOKCASES FOR ROOMS J & RR IN BASEMENT |
FSD OF DOORS IN TOILET ROOM OF HEALTH DEPT |
Contents |
GATE & SHELF FOR THE ASSEMBLY DOCUMENT ROOM |
LONGITUDINAL SECTION OF SENATE CHAMBER LOOKING SOUTH |
FIRST FLOOR ROOM #152 |
NEW QUARTERS FOR STATE DEPT OF HEALTH CONROY MARBLE & TILE WORKS TROY, NEW YORK |
FURNITURE LAYOUT FOR DEPT OF LABOR |
Contents |
FURNITURE LAYOUT FOR THE DEPT OF LABOR |
DETAIL FOR MARBLE SILLS W CORRIDOR |
ALTERATIONS REPAIRS & PAINTING SECRETARY OF STATES OFFICES |
PARTITION ETC ROOM 122 ATTORNEY GENERAL'S OFFICE |
SUPPLY CASE CONSERVATION CMSN |
Contents |
FINISHING 5TH FLOOR ROOMS FOR NYST DEPT OF HEALTH NEW KALAMEIN FRAME AND SASH RMS 4 AND 11 |
ALTERATIONS TO THE STATE TREASURER'S OFFICE ROOMS 135 136 137 |
ALTERATIONS & REPAIRS TO ROOMS 100 - 109 INC DEPT OF PUBLIC WORKS |
METAL EQUIPTMENT FOR THE STATE TAX COMMISSION |
PLAN OF 4TH FLOOR NORTH WEST SHOWING LAY-OUT OF METAL FILING CASES FOR THE STATE BOARD OF TAX COMM |
Contents |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQPT FOR THE STATE TAX COMMISSION |
METAL EQUIPMENT FOR THE TAX COMMISSION |
METAL EQUIPMENT FOR THE TAX COMMISSION |
Contents |
METAL EQPT FOR THE STATE TAX COMMISSION |
SECTION C ALTERATIONS TO ROOM 329 FOR THE STATE JUDICIARY COMMITTEE |
CEILING PLAN OF SENATE CHAMBER |
ALTERATIONS IN EXECUTIVE OFFICES |
Contents |
ALTERATIONS IN EXECUTIVE OFFICES DETAIL OF STAIRWELL |
NEW DOOR OPENING WINDOW GUARD ETC ROOM 152 FOR THE US POST OFFICE |
CONSTRUCTION OF SKYLIGHTS ROOMS 444 & 445 |
SHOW CASE 2ND FLOOR CAP G A R RMS |
REVOLVING DOORS SENATE CHAMBER ENTRANCES |
Contents |
ROOM 609A TOILETS LOCKER AND DARK ROOM |
METAL FILING CASES & SHELVING DEPT OF ARCHITECTURE ROOM 609 |
WATERPROOFING OF & TILE ROOF FOR NORTH & SOUTH PORTICO'S |
NEW METAL CASE FOR THE DEPT OF HEALTH ROOM 606 |
ALTERATIONS IN OFFICES OF THE SUPT OF PRISONS |
Contents |
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF ROOMS 204-205 AND 206 |
ALTERATIONS TO OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
ALTERATIONS TO OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF RMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXEC STAFF RMS 204-205 & 206 |
Contents |
TEMPORARY PLATFORM ASSEMBLY CHAMBER |
METAL FURNITURE & EQPT OFFICES OF EXECUTIVE STAFF ROOMS 204-205 & 206 |
METAL FURNITURE & EQPT OFFICES OF EXECUTIVE STAFF RMS 204-205 & 206 |
ENGINEERING WORK ALTERATIONS AND REPAIRS TO THE OFFICES OF THE EXECUTIVE STAFF SANITARY ELEC SPEC NO HEAT-2553 SANT'Y-2554
ELEC-2555
|
RE-ARRANGEMENT OF SENATE POST OFFICE AND FINANCIAL ROOMS |
Contents |
NEW PARTITION IN REAR OF SPEAKERS LOBBY ASSEMBLY CHAMBER |
NEW GLAZED PARTITION ROOM 242 EXCISE DEPT |
REPAIRS PAINTING ROOM ETC 151 ASSEMBLY MAILING DEPT (ASSEMBLY CHAMBER REPAIRS ETC.) |
TAX COMMISSION OFFICE REARRANGEMENT OF EXISTING PARTITIONS (ALSO NEW PARTITION) |
REARRANGEMENT OF SENATE POST OFFICE & FINANCIAL ROOMS |
Contents |
ELEVATION METAL FURNITURE NYS DEPT OF HEALTH ROOM 607 |
PARTITION & COAT CLOSET ROOM 217 |
CONSTRUCTION OF SKYLIGHTS ROOMS 444 & 445 |
ALTERATIONS TO ROOMS 414-415 & 416 FOR THE COURT OF CLAIMS |
Contents |
STORM SASH FOR ROOM 332 |
ENGINEERING WORK RECONSTRUCTION OF FORMER COURT ROOM #315 FOR LEGIS COMMITTEE HEARING |
ELEVATION SCHEME B PROPOSED STORM SASH OFFICE OF THE STATE ARCHITECT FOR WINDOWS |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
Contents |
ENGINEERING WORK FORMER COURT ROOM 315 FOR LEGIS COMMITTEE ELECTRIC |
STEEL FILING CASES & LOCKERS ROOM 345 ASSEMBLY PRINTING AND ENGROSSING BILLS |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
Contents |
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXEC STAFF |
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR EXECUTIVE OFFICES |
METAL FURNITURE & EQUIPMENT FOR THE OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQUIPMENT FOR OFFICES OF THE EXECUTIVE STAFF |
Contents |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXECUTIVE STAFF |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXEC STAFF |
PLAN OF GROUNDS NORTH WESTERLY CORNER |
CONSTRUCTION ALTERATIONS & REPAIRS TO OFFICES OF THE EXEC STAFF |
METAL FURNITURE & EQPT FOR OFFICES OF THE EXEC STAFF |
Contents |
CONSTRUCTION IN ROOM 135 |
CONSTRUCTION ALTERATIONS TO ROOM 132 |
CONSTRUCTION ALTERATIONS TO ROOM 132 DETAIL OF DOOR BETWEEN ROOMS 132-133 |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
CONSTRUCTION RESTAURANT & BARBER'S SHOP |
Contents |
DEPT OF ARCHITECTURE BOOKCASE FOR PRIVATE OFFICE |
RELAYING FLOOR ROOM 118 |
CONSTRUCTION STORM WINDOWS FOR ROOM 409 |
CONSTRUCTION ALTERATIONS TO ROOM 414A OCCUPIED BY THE CLERK OF CLAIMS |
CONSTRUCTION NEW METAL PARTITIONS ROOMS 430 - 431 |
ENGINEERING WORK CONVERTING WEST SIDE LOBBY INTO OFFICE FOR EXCISE DEPARTMENT |
Contents |
PARTITION IN OFFICE OF MINORITY LEADER OF THE ASSEMBLY ROOM 340 |
WROUGHT IRON FENCE AROUND MONUMENT |
ALTERATIONS CONVERTING ROOM 238 INTO A STORE ROOM FOR USE OF THE EXCISE DEPT |
SOUNDING BOARD FOR ASSEMBLY CHAMBER |
CONSTRUCTION OF PIT ELEC ELEVATORS EAST END |
Contents |
ALTERATIONS TO MEN'S TOILET 5TH FLOOR EAST |
CONSTRUCTION ALTERATION AT FIRST FLOOR ASSEMBLY ELEVATOR DOORS ELEC ELEVATORS EAST END |
CONSTRUCTION MENS TOILET 5TH FLOOR EAST DETAIL OF PARTITION CAP & DOOR TO PORTERS CLOSET |
PLANS FOR CARPETING ROOMS 201-201A-202-203 |
CONSTRUCTION PICTURE MOULD ON SOUTH WALL OF CONFERENCE ROOM |
Contents |
CASES FOR STANDARDS & FLAGS MUSEUM |
METAL EQPT OFFICE OF STATE COMPTROLLER INCOME TAX BUREAU |
CONSTRUCTION METAL FILING CASE ROOM 607 DEPT OF HEALTH |
NEW CASES FOR LIBRARY OFFICE ATTORNEY GENERAL |
STORM SASH FOR ROOMS 341 & 342 |
Contents |
FILE ROOM STATE DEPT OF HEALTH |
CONSTRUCTION-STEEL FILES-(STEEL FILES AND MEZZ CONSTRUCTION)- INSURANCE DEPT ROOMS 120 & 121 |
CONSTRUCTION-EXTENDING PARTITIONS TO CEILING ROOM 124 OFFICES OF STATE HOSPITAL CMSN |
FILE ROOM DIVISION OF VITAL STATISTICS STATE DEPT OF HEALTH DATA DWG SHOWING FLOOR LOADS & 5TH FLOOR CONSTRUCTION |
UNTITLED |
Contents |
BASEMENT & FIRST FLOOR NORTH CORNER OF CAPITOL TUNNEL TO STATE OFFICE |
CONSTRUCTION RAILING ROOM 137 STATE TREASURER'S OFFICE |
METAL FILING CASES OFFICES OF STATE COMPTROLLER INCOME TAX BUREAU |
RECONSTRUCTION, PARTITIONS IN ROOMS 248 & 249 (OFFICES COURT OF CLAIMS) |
FOURTH AND FIFTH FLOOR PLAN |
Contents |
RECONSTRUCTION, REPAIRS & EQUIPTMENT, PARTITIONS IN ATTORNEY GENERAL'S OFFICE RM 244 |
RELAYING ROOMS 204-205 EXECUTIVE CHAMBER (CAPITOL RECONSTRUCTION REPAIRS & EQUIPMENT) |
NEW PARTITION IN ROOM NO 433 FOR TAX DEPT |
STORM WINDOWS FOR ROOM 626 |
RELAYING FLOORS IN ROOMS 204-205 EXECUTIVE CHAMBER (CAPITOL RECONSTRUCTION REPAIRS & EQUIPMENT) |
Contents |
CAPITOL RESTAURANT CONSTRUCTION DETAIL OF ICE BUNKER |
CONSTRUCTION CAPITOL RESTURAUNT CONSTRUCTION NY STATE CAPITOL WOOD CLEATS & SHELVING IN KITCHEN AT DISH SLIDE OPENINGS |
NEW GLAZED PARTIONS IN ROOMS NO 601 & 603 PLANS ELEV SECTIONS & FSD |
ALTERATION & EXTENSION OF ROOM 404 FLOOR PLAN SCALE DETAIL OF PARTITION, CASE AND CUPBOARD |
LEGISLATIVE REPORTERS ROOMS-REPAIRS & IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF NY STATE CAPITOL-PLAN SHOWING POSITION OF STEEL
LOCKERS
|
Contents |
ALTERATIONS TO MEZZANINE FLOOR STATE DEPT OF ARCHITECTURE ROOM NO 409 |
LAYOUT OF TELEGRAPH OFFICES ON 3RD FLOOR |
LEGISLATURE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
PRESENT TELEGRAPH OFFICES ON 3RD FLOOR |
LAYOUT OF TELEGRAPH OFFICES 3RD FLOOR |
LEGISLATIVE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
UNTITLED |
Contents |
LOUNGE PARTITION CAP FS THIS DWG IS TO SUPERCEDE LOUNGE CAP DWG SHOWN ON DWG SHEET 1099 |
LEGISLATIVE REPORTERS ROOM ( REPAIRS & IMPROVEMENTS TO ROOMS ON 3RD FLOOR ) CONSTRUCTION REVISED DETAIL OF AIR WELL & LETTER
BOXES
|
PLAN OF LOUNGE EQUIPMENT |
LEGISLATIVE REPORTERS ROOMS (REPAIRS AND IMPROVEMENTS TO ROOMS ON 3RD FLOOR OF CAPITOL) |
Contents |
REMODELING ROOM OF TRANSFER TAX BUREAU CEILING PLAN UNDER BALCONY ROOM 416 & DETAIL OF CELATEX PANELING |
NEW DOORS FOR ADDITIONAL TELEPHONE BOOTH IN SPACE UNDERNEATH STAIRS TO LOUNGE |
DEPT OF HEALTH NEW GLAZED PARTITIONIN ROOM NO 606 PLAN ELEVATION SECTION & FULL SIZE DETAILS |
CIVIL SERVICE COMMISION ALTERATIONS TO STAIRS ROOM 410-412 |
CONSTRUCTION CIVIL SERVICE COMMISSION ALTERATIONS TO STAIRS ROOMS 410 & 412 |
Contents |
PLAN OF ROOM NO 409 SHOWING POSTIONS OF PARTIONS NOW LOCATED IN ROOM NO 122 |
STATE TAX DEPT REMODELING OF ROOMS TRANSFER TAX BUREAU RMS 416 418 419 420 |
REPAIRS AND EQUIPMENT FIRE SYSTEM PUMPS PIPING SANITARY WORK BASEMENT PLAN |
UNTITLED |
CIVIL SERVICE COMMISSION PLAN OF ROOM 410 SHOWING LOCATION OF PARTITIONS |
STATE TAX DEPT REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
Contents |
STATE TAX DEPT REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
CONSTRUCTION DEPT OF ARCHITECTURE METAL FILE CASES ROOMS # 405 608 609 |
REMODELING ROOMS OF TRANSFER TAX BUREAU ROOMS 416 418 419 420 |
DEPT OF ARCHITECTURE LOCKING DEVISE FOR METAL FILING CASE RM 609 |
Contents |
CONSTRUCTION ALTERATIONS TO RM 320 |
LABEL- HOLDERS FOR METAL FILE CASES IN ROOMS NO 405, 606, 609 |
EXECUTIVE DEPT DIV OF THE BUDGET ELECTRIC WORK ALTERATIONS ROOM 111 |
EXECUTIVE DEPT DIV OF THE BUDGET ELECTRIC WORK ALTERATIONS RM 112 |
ALTERING PARTITION UNDER STAIRS NORTH WEST CORNER FOURTH FLOOR FOR TELEPHONE SWITCHBOARD |
Contents |
HEATING REPAIRS & ALTERATIONS TO 4TH FLOOR |
PARTITION AROUND CHIMNEY? PUMP & PARTITION IN ? ( AIR CONDITIONING ) |
ALTERATIONS TO ROOM 321 |
PLAN SECTION ELEVATION DETAILS & SPECS FOR NEW BOOK CASES |
BASEMENT PLAN AT ENTRANCE FROM CAPITOL |
Contents |
CONSTRUCTION DETAIL OF EASELS TYPE A-B-C |
TRACING FROM A DWG OF THE BUREAU OF ENGINEERING CITY OF ALBANY NY PROPOSED CHANGE IN ALIGNMENT OF SOUTH SWAN STREET BETWEEN
WASHINGTON AVE & STATE
|
CONSTRUCTION FS DETAIL OF TILE RIDGE & COPING |
DATA DWG SECOND FLOOR TOWER ROOM IN THE CAPITAL (FLAG RM) |
EQUIPTMENT ARRANGMENT IN ROOMS NOS 133 & 134 FOR STATE TAX DEPT |
Contents |
CONSTRUCTION FLOOR PLAN OF LABORATORY STANDARDS & PURCHASE |
STATE BOILER HOUSE CONTSTRUCTION REPAIRS TO BOILER HOUSE NEW ROLLING STEEL DOORS DWG # 104 |
CONSTRUCTION NEW TOILET ROOM ON FOURTH FLOOR |
CONSTRUCTION NEW TOILET ROOM ON FOURTH FLOOR PLAN & DETAILS |
CONSTRUCTION PLAN OF FOURTH FLOOR SHOWING NEW OFFICE PARTITIONS REMOVALS WALL & FLOOR AREAS |
Contents |
REMODELING ELECTRIC LIGHTING FIXTURES EAST APPROACH STATE |
COSTRUCTION REPAIRS & ALTERATIONS NEW PARTITONS IN ROOM # 218 ATTORNEY GENERAL'S OFFICE PLAN |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
ELECTRIC REPLACEMENT OF ELECTRICWORK EAST SECTION INTERIOR FIXTURE FOR ASSEMBLY LOBBY |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
Contents |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION EXTERIOR FIXTURES |
DETAILS OF JAMB |
REVISED JAMB SECTION FOR OPENINGS 2D/7, 2D/8, 2D/9 WEST DOORWAYS SCHEME NO 2 |
4TH FLOOR EAST CORRIDOR |
Contents |
REVISED DETAILS OF OPENING NO 2D/201 REVISED FROM DRAWING 63/500 |
REVISED DETAILS OF OPENINGS W2/205 AND 2D/205 |
REVISED DETAILS AT OPENING OF ELECTRIC SERVICE ROOM (DOOR 2D/204A) FROM THAT SHOWN ON DWG 63/498 |
PLAN OF ROOMS 246 AND 247 |
UNTITLED |
Contents |
ALTERATIONS ROOM NO'S 427 & 428 PALNS SECTIONS DETAILS |
SENATE ROOM 325 |
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) STRUCTURAL DETAILS |
SECOND FLOOR PLAN |
ALTERATIONS (BOOKCASES) TO ROOMS 333 AND 334 |
Contents |
SENATE ALTERATIONS TO EXISTING RMS 331 TO 336 INCL. DETAIL OF BOOKCASES |
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) NORTH WALL & ENTRANCE
DOOR DETAILS
|
CONSTRUCTION SENATE ALTERATION TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) MISCELLANEOUS DETAILS |
CONSTRUCTION SENATE ALTERATIONS TO 3RD FLOOR SPACE FOR WOMENS LOUNGE & TOILET (ROOMS NO 3-84 & 3-85) PLANS, ELEVATION, SECTIONS
& SCHEDULES
|
4TH FLOOR SENATE |
Contents |
ALTERATIONS AT THIRD FLOOR PLANS |
ALTERATIONS AT FIFTH FLOOR SECTION |
ALTERATIONS AT FIFTH FLOOR SECTION |
ASSEMBLY ALTERATIONS AT FOURTH FLOOR PLANS |
F.S. SECTION THRU. "D-D" (AFTER ALTERATION) |
Contents |
PROPOSED OFFICES AND STORE ROOM OVER OPEN COURT AT THIRD AND FOURTH FLOOR LEVEL |
PROPOSED OFFICES AND STORE ROOM OVER OPEN COURT AT THIRD AND FOURTH FLOOR LEVELS |
1/2 PLAN OF GARAGE UNDER CAPITOL STEPS |
UNIDENTIFIED FINISH DETAIL |
REVISION ROOM 205A TOILET |
Contents |
SENATE CONSTRUCTION BIRD CONTROL ABOVE 2ND FLOOR PORTIONS OF SOUTH & WEST ELEVATION |
INSTALLATION OF DOOR, TRIM-ETC. BETWEEN ROOM 207A & HALL |
SEC. THRU EAST PORCH AND BASEMENT TO TOWER FOUNDATIONS ON CENTER OF BUILDING LOOKING TOWARD STATE ST |
ALTERATIONS TO EXISTING DOOR |
PROPOSED ENTRANCE UNKNOWN LOCATION |
Contents |
OFFICE SPACE ADDITION 1ST FLOOR MEZZANINE PLAN |
OFFICE SPACE ADDTION 2ND & 3RD FLOOR PLAN & 2ND FLOOR MEZZANINE PLAN |
OFFICE SPACE ADDITION NORTH ELEVATION |
OFFICE SPACE ADDITION SECTION A |
OFFICE SPACE ADDITION 1ST FLOOR PLAN |
Contents |
UNTITLED |
REJECTED PLAN OF CEILING IN FLAG ROOM |
FLAG ROOM |
CONSTRUCTION LOCATION OF BRONZE DOORS TO BE INSTALLED IN FLAG ROOM SHOWS EXISTING CONDITIONS AND REVISED CONDITIONS |
PROPOSED PANELLING TREATMENT UNKNOWN ROOM |
Contents |
CONSTRUCTION PLANS ELEVATIONS SECTIONS & DETAILS REVISION TO ROOM NO. 344 |
REVISED JAMB SECTION FOR OPENINGS 2D/7, 2D/8, & 2D/9 WEST DOORWAYS |
PROPOSED STORAGE UNITS FOR ASSEMBLY TELEPHONE ROOM NO 303 |
CONSTRUCTION & HEATING REHABILITATION OF FLAG ROOM SECOND FLOOR REVISED PLAN OF FLAG RM FROM THAT SHOWN ON DWG NO 63/499 |
PROPOSED PANELLING TREATMENT UNKNOWN ROOM |
Contents |
CAPITOL ROOM 329 SCHEME "B" WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "C" ALL NEW WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "A" WOOD PANELLING TO TOP OF DOOR TRIM |
CONSTRUCTION PLAN SECTIONS & DETAILS REVISION TO ROOM NO 344 SCHEME "A" |
SENATE-PART 3RD FLOOR PLAN |
CONSTRUCTION ALTERATIONS TO RM 248 PLAN, SECTIONS & DETAILS |
Contents |
CAPITOL ROOM 329 SCHEME "A" WOOD PANELLING TO TOP OF DOOR TRIM |
CAPITOL ROOM 329 SCHEME "B" WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CAPITOL ROOM 329 SCHEME "C" ALL NEW WOOD PANELLING TO BOTTOM OF PLASTER CORNICE |
CONSTRUCTION PLAN, SECTIONS ELEVATIONS & DETAILS, ADDITIONAL OFFICE 4TH FLOOR, ROOM 4H |
Contents |
CONSTRUCTION BULLET PROOF PARTITIONS IN SENATE GALLERY |
PRELIMINARY STUDY OF PEDESTRIAN BRIDGE IN MAIN COURT |
PROPOSED DELIVERY AREA UNDER PROMENADE DECK TO BASEMENT |
PLAN, ELEVATION & SECTION PROTECTION FOR INNER COURT VENTILATIOR HOODS |
PROPOSED HAND RAILING FOR GRAND STAIRCASE |
Contents |
CONSTRUCTION REHABILITATION OF ASSEMBLY FISCAL OFFICE ROOMS 310 & 311 |
PROPOSED REVISED OFFICE LAYOUTS |
PROPOSED REVISED OFFICE LAYOUT FOR ROOM 250 |
CONSTRUCTION TUNNEL DETAILS PLAN AND SECTIONS |
PROPOSED REVISED OFFICE LAYOUTS |
Contents |
CONSTRUCTION & ELECTRIC PLANS ELEVATIONS SECTION EXECUTIVE PRESS SECRETARY TELETYPE SPACE SECOND FLOOR |
CONSTRUCTION & ELECTRIC PLAN & DETAILS ASSEMBLY OFFICE ROOM 436M |
CONSTRUCTION PLANS ELEVATIONS SECTIONS & DETAILS RENOVATION SENATE OFFICE ROOMS NOS 334 & 335 |
CORRECT VENTILATION LIBRARY ASSEMBLY PLAN, ELEVATIONS, SECTIONS AND DETAILS |
CONSTRUCTION PLANS & SECTION |
CONSTUCTION AND ELECTRIC REHAB RMS 246 SECOND FLOOR AND 246, 247, 248 MEZZANINES PLANS SECTIONS AND DETAILS |
RENOVATIONS TO ASSEMBLY ROOM NO 151, CONSTRUCTION AND ELECTRIC PLAN SECTION AND LOCATION PLAN |
Contents |
AIR CONDITIONING & HEATING ALTERATIONS TO QUARTERS OF LEGISLATIVE CORRESPONDENTS ASSOC 3RD FLOOR AND MEZZ PLANS AND SECTIONS |
AIR CONDITIONG & HEATING ALTERATIONS TO QUARTERS OF LEGISLATIVE CORRESPONDENTS ASSOC 3RD FLR AND MEZZ ADDENDUM TO DWG 52/2154 |
FOURTH STORY PLAN |
FIFTH STORY PLAN |
ROOF FRAMING PLAN |
THIRD STORY PLAN |
Contents |
PART SECOND FLOOR PLAN |
WESTERN APPROACH |
Contents |
ROOM 311 ALTERATIONS FOR MEN'S TOILET & 1ST AID STATION ROOM 312 ALTERATIONS & IMPROVEMENTS PLANS SCHEDULE SECTIONS DETAILS
PAINTING PROJECT
|
CONSTRUCTION LEGISLATIVE CORRESPONDENT ASSOC ROOM ALTERATIONS SECTIONS & DETAILS PAINTING PROJECT |
CONSTRUCTION LEGISLATIVE CORRESPONDENTS ASSOC ROOM ALTERATIONS PLANS & DETAILS PAINTING |
PLAN OF SEATS IN SENATE CHAMBER |
Contents |
ALTERATIONS TO SENATE PORTION OF CAPITOL NORTH WEST PORTION OF 3RD FLOOR SOUTH WEST PORTION 3RD AND 4TH FLOORS AND CLG OVER
GRAND STAIR
|
EAST FRONT DETAIL OF GABLE (FRONT) NO 2 |
EAST FRONT DETAIL OF GABLE (FRONT) NO. 2 |
EAST FRONT DETAIL OF GABLE (FRONT) |
Contents |
LONGITUDINAL SECTION OF PORTICO ON WASHINGTON AVE - PLAN OF LONGITUDINAL SECTION OF PORTICO ON STATE STREET |
GIRDER FOR TOWER ROOF |
GROUND FLOOR PLAN NORTH SIDE |
ENTRANCE FLOOR PLAN NORTH SIDE |
PRINCIPAL FLOOR PLAN NORTH SIDE |
Contents |
NEW STATE CAPITOL ALBANY NY EAST HALF OF LONGITUDINAL SECTION |
WEST ENTRANCE & STAIRCASE HALLS |
NO 9 |
FIRST FLOOR NORTH WEST 779 |
EAST HALF OF LONGITUDINAL SECTION |
Contents |
SECOND FLOOR PLAN SECOND FLOOR NORTH WEST DWG 7 WIRING PLAN |
SECOND FLOOR |
FIRST FLOOR NORTH EAST 779 |
EAST ELEVATION NORTH ELEVATION & SECTION SOUTH WEST TOWER |
WEST ELEVATION SOUTH ELEVATION SOUTHWEST TOWER |
Contents |
WESTERN STAIRCASE SECTION ON LINE G.H. NO 10 |
SECTION ON LINE D EASTERN APPROACH DETAILS |
ATTIC FLOOR PLAN |
798-44 |
BASEMENT FLOOR PLAN |
Contents |
818-1 |
WESTERN STAIRCASE PLAN OF GALLERY FLOOR |
IN SCALE SECTION ON LINE E. F. WESTERN STAIRCASE |
PLAN OF ELELCTRIC LIGHTING EASTERN APPROACH LOBBY & TOWER |
ATTIC FLOOR PLAN |
Contents |
FOUNDATION PLAN OF NORTH PORTICO |
PLAN OF SOUTH PORTICO |
UNTITLED |
EAST FRONT DETAIL OF GABLE FRONT #2A |
BASEMENT FLOOR PLAN |
Contents |
EAST FRONT DETAIL OF GABLE (FRONT) #2 |
798-37 |
PLAN OF NORTH PORTICO |
ENTRANCE FLOOR PLAN |
ELEVATION NORTH TERRACE |
Contents |
SCALE DETAIL OF TERRA COTTA FINIALS FOR ROOF OF EAST CENTER SECTION |
SECTION ON LINE D EASTERN APPROACH DETAILS |
PLAN & SECTIONS OF SENATE FIRE PLACE FLUE E |
GALLERY FLOOR PLAN |
DORMER ON EAST FRONT |
Contents |
SECTION THROUGH EAST ENTRANCE (TAKEN OF CENTER LINE LOOKING S) |
UNTITLED |
UNTITLED |
WEST GABLE |
DOMERS ON CURTAIN WALL ASSEMBLY CHAMBER FRONT |
Contents |
DETAIL OF STONE DORMERS ON NORTH FRONT ASSEMBLY CHAMBER |
WESTERN STAIRCASE ON LINE A-B NO 7 |
BASEMENT FLOOR |
ONE HALF SCALE DWG OF DOME CEILING IN TOWER |
WESTERN STAIRCASE SECTION ON LINE A-B LOOKING SOUTH |
Contents |
WEST STAIRCASE SECTION ON LINE E-F LOOKING E |
WEST STAIRCASE GROUND FLOOR |
UNTITLED |
GALLERY FLOOR DETAILS, WESTERN STAIRCASE 1/4 PLAN |
DETAILS OF S.E. STAIRCASE (SECTION C-D) |
Contents |
FOUNDATION PLAN OF EASTERN APPROACH |
ROOF PLAN |
ELEVATION OF NORTH & SOUTH SIDE OF STAIRCASE GALLERY FLOOR DETAILS |
PLAN & ELEVATION OF SOUTH SIDE OF SOUTH CORRIDOR WESTERN STAIRCASE |
ONE INCH SCALE SECTION THROUGH EAST ENTRANCE GROUND FLOOR LOOKING EAST |
Contents |
ELEVATION ON LINE H 798-7 |
ELEVATION ON LINE E 798-3 |
SECTION ON LINE C |
SECTION ON LINE C 798-10 |
GALLERY FLOOR PLAN |
Contents |
SECTION THROUGH TOWER LOOKING EAST |
WESTERN STAIRCASE PLAN OF GROUND FLOOR NO 3 |
SOUTH ELEVATION NORTH CORIDOR WESTERN STAIRCASE SECTION THROUGH NORTH CORRIDOR LOOKING EAST |
SECTION THROUGH SOUTH CORRIDOR LOOKING EAST SECTION THROUGH SOUTH CORRIDOR LOOKING SOUTH |
SECTIONS OF ASSEMBLY STAIRCASE AS ORIGINALLY COSTRUCTED |
Contents |
WESTERN STAIRCASE SECTION ON LINE P-Q #11 |
WESTERN STAIRCASE PLAN OF ENTRANCE FLOOR #4 |
LONGITUDINAL SECTION OF CENTRAL READING ROOM |
FOUNDATION PLAN OF EASTERN APPROACH |
SECTION ON LINE B 798-50 |
Contents |
SECTION ON LINE B |
DETAIL OF EASTERN APPROACH ELEVATION SECTION ON LINE A |
ELEVATION OF THIRD RUN OF STEPS EASTERN APPROACH |
UNTITLED |
EASTERN APPROACH DETAILS PLAN OF IRON BEAMS NORTH SIDE TERRACE |
Contents |
WESTERN STAIRCASE SECTION ON LINE A-B #7 |
RECORD WIRING |
SECOND FLOOR NORTH EAST SECTION |
WESTERN STAIRCASE SECTION ON LINE E-F NO 9 |
FOUNDATION PLAN SOUTH PORTICO |
Contents |
ELEVATION OF SOUTH EAST SIDE OF DRIVEWAY SHOWING STEPS TO TERRACE |
PLAN & ELEVATION OF SIDE TERRACES NORTH & SOUTH OF THIRD RUN OF STEPS NO 798-32 |
PLAN OF BASE COURSE PLANS & ELEVATION OF EASTERN WALL OF SOUTHERN DRIVEWAY EASTERN APPROACH 798-30 |
PLANS & ELEVATIONS OF EASTERN SIDE OF NORTHERN DRIVEWAY |
PLAN & ELEVATION OF TERRACE & PORTICO SOUTH SIDE |
Contents |
PLAN & ELEVATION WESTERN SIDE OF NORTHERN DRIVEWAY |
798-53 |
798-9 |
PLAN OF EAST ENTRANCE GROUND FLOOR |
Contents |
PRINCIPAL FLOOR PLAN |
ENTRANCE FLOOR PLAN |
PLAN WESTERN APPROACH & PORTICO |
FRONT ELEVATION WESTERN APPROACH & PORTICO |
FRONT ELEVATION WESTERN APPROACH & PORTICO |
Contents |
WESTERN STAIRCASE # 5 PLAN OF PRINCIPAL FLOOR |
SIDE ELEVATION WESTERN APPROACH & PORTICO |
TRANVERSE SECTION WESTERN APPROACH & PORTICO |
PLAN WESTERN APPROACH & PORTICO |
LONGITUDINAL SECTION WESTERN APPROACH & PORTICO |
Contents |
TILING PLAN 3RD FLOOR WESTERN STAIR CASE |
FRAMING PLANS OF TOWER |
SECTION OF EAST FRONT AT CENTER OF BUILDING |
TILING PLAN 3RD FLOOR WESTREN STAIRCASE |
PLANS OF TOWER FLOORS SHOWING STONE FLAGGING & TOWER CEILING |
Contents |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
TILING PLAN 4TH FLOOR WESTERN STAIRCASE |
Contents |
UNTITLED |
UNTITLED |
SECTION OF DOME-LIGHT OVER SENATE STAIRCASE |
UNTITLED |
TOWER |
Contents |
ATTIC OF FIFTH FLOOR |
ELECTRIC PLANT STEAM PIPING IN POWER HOUSE CONDUIT & CAPITOL BASEMENT PLAN OF ENGINE ROOM |
ALTERATIONS TO ROOMS |
ELEVATION ON LINE G |
GROUND PLAN OF EAST FRONT CENTER PORTION AS IT IS AT PRESENT |
Contents |
GALLERY FLOOR PLAN ALTERATIONS TO PLUMBING |
DATA SHEET DIAGRAMATIC ELEVATIONS SHOWING PRESENT CONDITIONS; ALTERATIONS TO PLUMBING |
ALTERATIONS IN OFFICE OF SUPERINTENDENT OF PRISONS CONSTRUCTION & ELEC WORK |
UNTITLED |
UNTITLED |
Contents |
ALTERATIONS TO ROOF FRAMING PLAN |
FIFTH STORY PLAN |
FOURTH STORY PLAN |
SECOND STORY PLAN |
FIRST STORY PLAN |
BASEMENT PLAN |
ALTERATIONS TO STATE CAPITOL ALBANY NY SECTIONS |
Contents |
ALERATIONS TO LONGITUDINAL SECTIONS |
SECTIONS |
ALTERATIONS NORTH & SOUTH ELEVATIONS |
ALTERATIONS TO ELEVATION OF NORTH SIDE NORTH WALL CENTER SECTION |
THREE QUARTER INCH DETAILS OF NEW STONE DORMERS ON WEST ELEVATION |
Contents |
DETAILS & ELEVATION OF GRANITE WALLS ABOVE 5TH FLOOR LEVEL IN N & S COURTS |
ELEVATION OF WEST CORRIDOR WALL ABOVE THE 3RD FLOOR LOOKING EAST |
ELEVATION OF SOUTH SIDE SOUTH WALL CENTER SECTION |
DETAIL OF STONE & BRICK WORK OF NW TOWER |
ALTERATIONS TO DETAIL OF STONE & BRICK WORK OF SOUTH WEST TOWER |
Contents |
ELEVATION OF EAST CORRIDOR WALL LOOKING EAST |
THREE QUARTER INCH DETAILS OF STONE LOGGIA AT 5TH FLOOR WEST ELEVATION |
DATA DRAWING ELEVATOR SHAFTS AND TOILETS |
PLAN OF SOUTH WEST TOWER FOR MASONRY & STRUCTURAL STEEL ALTERATIONS |
ALTERATIONS FULL SIZE DETAIL OF VENTILATING RIDGE SHOWING ADDITIONAL BRACING |
Contents |
ALTERATIONS DETAILS OF CHIMNEY BASES |
ALTERATIONS TO VENTILATING RIDGE BETWEEN SKYLIGHT & MAIN RIDGE OF CENTER |
F.S. DETAILS OF PARTITIONS ROOMS 220 & 221 2ND FLOOR |
F.S. DETAILS OF COPPER CANOPY OVER VENT FLUES & TOILET ROOMS |
LAYOUT OF WOOD CEILING BEAMS IN ROOM 332 WITH MEASUREMENTS THEREON TO WHICH WOOD WORK WILL BE MADE. WALLS AT BUILDING TO BE
GROUNDED TO SUIT
|
Contents |
DETAILS OF SETTING BEAMS AROUND STAIR WELL & STAIR PLATFORM |
FULL DETAILS OF SKYLIGHT OVER NORTH & SOUTH CORRIDORS WESTERN STAIRCASE |
ALTERATIONS RESTORING SANDSTONE & SKYLIGHT OVER NORTH CORRIDOR WESTERN STAIRCASE 4TH STORY |
ALTERATIONS TO ATTIC PLANS ELEVATOR & DETAILS METAL WINDOW FRAMES SASH & GLAZING |
ALTERATION TO PLUMBING DWG BSMT PLAN |
Contents |
WAINSCOT AND NEW PARTITION CASES FOR OFFICES OF STATE COMMISSION IN LUNACY 1ST FL RM 124 |
REFINISHING OFFICES FOR THE STATE COMMISSION LUNACY FIRST FLOOR |
REFINISHING OFFICES OF THE EXCISE DEPT SECOND FLOOR |
FULL SIZE DETAILS OF MEZZANINE FLOOR IN ROOM 244 EXCISE DEPT |
STATE ARCHITECTS OFFICE EQUIPMENT FOR FILING ROOM 403 DETAILS |
Contents |
ALTERATION DETAIL OF TOILET ROOM WINDOWS NORTH OF CENTER SECTION |
RESTORATION OF WESTERN STAIRCASE |
DETAILS OF THREE NORTH DORMERS |
FINISHING ROOMS & CORRIDORS THIRD FLOOR PLAN |
FINISHING ROOMS & CORRIDORS PLAN 3RD FLOOR CORRIDORS |
Contents |
DETAIL OF TOILET RM WINDOWS SOUTH OF CENTER SECTION |
TOILET ROOM DOORS NORTH AND SOUTH OF CENTER |
SECRETARY OF STATE'S OFFICE ROOMS 256, 257, & 258 PANELED PARTITIONS |
F S D SHOWING STEEL FURRING & TEMPORARY PLASTERING WEST CORRIDOR 3RD FLOOR UNDER MEZZ FLOORS |
FINISHING ROOMS & CORRIDORS DETAIL MEASUREMENTS ROOMS 332 333 |
Contents |
FOURTH FLOOR EAST SIDE WEST CORRIDOR |
FINISHING ROOMS & CORRIDORS ROOM 332 DETAIL OF FLOOR WALLS & CEILING |
PLANS & ELEVATION OF MARBLE WORK AT INTERSCETIONS OF 3RD FLOOR CORRIDORS ALTERATION |
FINISHING ROOMS & CORRIDORS ROOM 333 DETAIL OF FLOOR, WALLS, AND CEILING |
FINISHING ROOMS & CORRIDORS DETAILS MEASUREMENTS OF ROOMS 334 335 336 338 339 340 |
Contents |
MEASUREMENT IN ROOMS 332 & 342 PLANS WI SIDE WALLS LAID DOWN |
DETAILS OF PRIVATE ELEVATOR & LADDER FOR THE STATE ARCHITECT'S OFFICE RM 609 |
WOOD & GLASS PARTITION FOR CITIES COMMITTEE 4TH FLOOR |
DETAILS OF DOORS TO CORRIDOR ROOMS 435, 436 & 437 |
FULL SIZE DETAIL OF CAPITOL FOR LARGE PILASTER FOR ROOM 337 |
Contents |
ES SIDE ELEVATION OF PILASTER CAPS (FOR OTHER DETAILS SEE SHEET 452) CAPITOL ALBANY NY |
DETAIL OF STAND PIPE & CONNECTION FOR NORTH & SOUTH CORRIDORS ON 3RD & 5TH FLOORS |
FINISHING ROOM 608 |
STEEL FRAMING FOR CEILING INTERSECTION NORTH & WEST & SOUTH & WEST INTERSECTIONS |
3/4 IN DETAILS OF ARTIFICIAL STONE CEILING AT INTERSECTION OF S & W CORRIDORS |
Contents |
REARRANGEMENT OF SENATE CHAMBER FOR IMPEACHMENT TRIAL |
STEEL FRAMING FOR CEILING INTERSECTIONS SOUTH & EAST |
DETAIL OF VENTILATOR SASH & SKYLIGHT FOR RM NO 608 |
DWG SHOWING POSITION OF OPENINGS IN THE CARS FOR THE NEW ELEVATORS CAPITOL RECONSTRUCTION |
CONSTRUCTION STORM WINDOWS & VESTIBULES FOR ROOM 517 |
Contents |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
RENEWING STONE WORK WITH STAIRCASE CORRIDOR 4TH FLOOR |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Contents |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Contents |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
FINISHING ROOMS & CORRIDORS |
Contents |
FINISHING ROOMS & CORRIDORS DETAIL HOLLOW METAL WORK |
FULL DETAIL OF STAIRS ON LANDING B DOWN |
FINISHING ROOMS & CORRIDORS DETAIL OF HOLLOW METAL WORK |
FULL SIZE DETAIL OF NORTH STAIRS ON LANDINGS & PLATFORMS |
DETAILS OF STAIRS FROM 5TH FLOOR MEZZ TO 6TH FLOOR N & S TOWERS |
Contents |
DESIGN FOR 4TH FLOOR TYPICAL FOR THE 5TH FLOOR |
PLAN OF THE 4TH FLOOR NORTH WEST SHOWING FURNITURE LAYOUT FOR THE STATE BOARD OF TAX CMSN |
READING TABLE ROOM NO 337 |
FSD OF CHAIR FOR LEGISLATIVE LIBRARY |
ELECTRIC WIRING EAST WING SECOND FLOOR |
Contents |
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
ELECTRIC WIRING EAST WING |
RESTORATION OF INTERIOR SKYLIGHTS OVER WEST STAIRCASE |
Contents |
FSD OF DESK FOR LEGISLATIVE LIBRARY |
FSD CHAIR FOR LEGISLATIVE LIBRARY |
FSD READING TABLE FOR LEGISLATIVE LIBRARY |
FSD OF DESK LEGISLATIVE LIBRARY |
ALTERATIONS IN EXECUTIVE OFFICES STAIR DETAILS |
Contents |
ALTERATIONS IN EXECUTIVE OFFICES WOOD DETAILS |
FINISHING ROOMS & CORRIDORS |
REPAIRS PAINTING ETC ROOM 151 ASSEMBLY MAILING DEPT (ASSEMBLY CHAMBER REPAIRS ETC.) |
MISC DETAILS NEW TOILET ROOM 609A |
CHANGING 4TH FLOOR SENATE CORRIDOR INTO ROOMS |
2 DIRECTORY BOARDS INDUSTRIAL COMMISSION 5TH FLOOR CORRIDORS |
Contents |
LEGISLATIVE REPORTERS ROOMS REPAIRS AND IMPROVEMENTS TO ROOMS ON THIRD FLOOR OF NY STATE CAPITOL CONSTRUCTION STAIR DETAILS |
CHANGING 4TH FLOOR SENATE CORRIDOR INTO ROOMS |
CONVERTING WEST LOBBY INTO OFFICE FOR EXCISE DEPT |
PLAN OF ROOMS 246 - 250 |
CONVERTING WEST LOBBY INTO OFFICE FOR EXCISE DEPT |
Contents |
HEATING BASEMENT EAST DWG # B/E |
HEATING BASEMENT PLAN WEST DWG # B/W |
ELECTRIC WORK ALARM WATCHMAKER'S CLOCK, TIME CLOCK & SIGNAL WIRING DIAGRAMS LIGHTING PANEL & INTERCONNECTING CABINET SCHEDULES
DWG
|
PUMPS, PIPING & COVERING PART BASEMENT PLAN, SECTIONS AND DETAILS REPAIRS AND EQPT WATER SYSTEM |
COSTRUCTION NEW STAIRS TO BALCONY IN ROOM 435 ELEVATION & SECTIONS |
Contents |
SECOND FLOOR EAST DWG # 2/E |
SECOND FLOOR WEST DWG # 2/W |
THIRD FLOOR EAST DWG # 3/E |
THIRD FLOOR WEST DWG # 3/W |
FOURTH FLOOR EAST DWG # 4/E |
Contents |
FOURTH FLOOR WEST DWG # 4/W |
FIFTH & SIXTH FLOOR EAST DWG # 5-6/E |
SIXTH FLOOR WEST DWG # 6/W |
CAPITOL ALBANY NY SANITARY REPAIRS & ALTERATIONS |
ELECTRIC REPLACEMENT OF ELECTRIC EAST SECTION 3RD FLOOR PLAN |
Contents |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION FOURTH FLOOR PLAN |
REPLACEMENT OF ELECTRIC WORK EAST SECTION 6TH FLOOR PLAN |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION PARTIAL FIRST & SIXTH FLOOR PLANS |
ELECTRIC REPLACEMENT OF ELECTRIC WORK EAST SECTION BASEMENT FLOOR PLAN & DETAILS |
REPLACEMENT OF ELECTRIC WORK EAST SECTION UNDERGROUND SERVICE & PLOT |
Contents |
REWIRING & NEW SERVICE FOR WEST STAIRWAY SECTIONS & DETAILS |
ELECTRIC REWIRING OF WESTERN STAIRCASE 3RD FLOOR |
REWIRING OF WEST STAIRWAY 4TH FLOOR PROJECT |
CAPITOL POWER HOUSE ALBANY NY CONSTRUCTION BOILER WALKWAYS & PLATFORMS |
ELECTRIC REWIRING OF WESTERN STAIRCASE SECOND FLOOR |
Contents |
ELECTRIC CONSERVATION ELECTRIC SERVICE ETC 3RD, 5TH, 6TH & ATTIC PLANS |
ELECTRIC CONVERSION OF ELECTRIC SERVICE ETC CONSTRUCTION DETAILS TRANSFORMER ROOM |
LEGISLATIVE CORRESPONDENTS ASSOCIATION ROOM ALTERATIONS FLOORM& PLANS DETAILS & DIAGRAMS |
UNTITLED |
3RD FLOOR CORRIDOR |
Contents |
SANITARY LEGISLATIVE CORRESPONDENTS ASSOCIATION ROOM ALTERATIONS PLANS & SECTIONS |
LEGIS CORRESPONDENTS ASSOC ROOM ALTERATIONS |
HEATING 4TH FLOOR PLAN WEST MEZZANINE |
CONSTRUCTION FIRST FLOOR PLAN EAST |
CONSTRUCTION 1ST FLOOR PLAN WEST |
Contents |
HEATING 5TH FLOOR PLAN EAST |
HEATING 5TH FLOOR PLAN WEST |
HEATING FIRST FLOOR PLAN EAST |
HEATING FIRST FLOOR PLAN WEST |
HEATING SECOND FLOOR PLAN EAST |
Contents |
HEATING THIRD FLOOR PLAN EAST MEZZANINE |
HEATING THIRD FLOOR PLAN WEST |
HEATING THIRD FLOOR PLAN WEST MEZZANINE |
HEATING FOURTH FLOOR PLAN EAST |
HEATING FOURTH FLOOR PLAN EAST MEZZANINE |
Contents |
HEATING 4TH FLOOR PLAN WEST |
HEATING & VENTILATING CONSTRUCTION & ELECTRIC AIR CONDITION FOR ROOMS NO. 341, 342, 343 & UNDER FLOOR DUCT SYSTEM IN ROOM
NO. 342 PLANS ELEVATIONS & SECTIONS
|
HEATING & VENTILATING CONSTRUCTION & ELECTRIC AIR CONDITION FOR ROOMS NO. 341, 342, 343 & UNDER FLOOR DUCT SYSTEM IN ROOM
NO. 342 PLANS ELEVATIONS & SECTIONS
|
SEQUENCE OF PITS ELEVATORS 3 AND 4 CAPITOL SOUTH LOBBY MODIFICATIONS |
NORTH/SOUTH SECTION |
Contents |
BASEMENT FLOOR |
GALLERY FLOOR |
ENTRANCE FLOOR |
ATTIC FLOOR |
Contents |
Item |
Folder |
LEGISLATIVE REPORTERS ROOM (REPAIRS & IMPROVEMENTS TO RMS ON THIRD FLOOR OF NY STATE CAPITOL CONSTRUCTION AIR WELL & LETTER
BOXES)
|
|
|
212 |
LEGISLATIVE REPORTERS ROOM (REPAIRS & IMPROVEMENTS TO RMS) 3RD FLOOR OF NY STATE [CAPITOL] |
|
|
212 |
LEGISLATIVE REPORTERS ROOMS (REPAIRS & IMPROVEMENTS TO RMS ON THIRD FLOOR OF NY STATE CAPITOL CONSTRUCTION CEILING GRILL PANELLED
BEAM & PANELLED WORK
|
|
|
212 |
Contents |
DETAILS OF MEZZ 4TH FLOOR DOORS #426-427-428-429-442 & 443 |
FULL SIZE DETAIL OF STAIRS AT 4TH STORY UP |
Contents |
798-35 |
PLAN & ELEVATION OF TERRACE & PORTICO NORTH SIDE |
Contents |
F.S.DETAILS OF CORRIDOR DOORS TO RMS. 333 AND 341 |
F.S. DETAILS OF WAINSCOTING ROOM 333 |
F.S. DETAIL OF CEILING PANELS ROOM 333 |
F.S. DETAILS OF CEILING CORNICE IN ROOM 333 |
Contents |
UNTITLED |
ALTERATIONS TO HOUSE OVER ELEVATOR SHAFTS & DETAIL OF SKYLIGHTS |
Contents |
PRINCIPAL FLOOR PLAN ALTERATIONS TO PLUMBING |
DETAILED SECTION EAST & WEST THROUGH CENTER EASTERN APPROACH |
FULL SIZE DETAILS OF MANTLE (WOOD) IN ROOM? 533 |
GALLERY FLOOR PLAN |
Contents |
ELEVATION ON LINE F |
DETAIL OF ENTABLATURE 3RD STORY FLOOR LEVEL OVER NORTH & SOUTH PORTICOS |
Contents |
NORTH WEST ELEVATION & SECTION - NORTHWEST TOWER |
SOUTH ELEVATION/NORTH ELEVATION |
Contents |
DETAIL OF BRONZE ELEVATOR CAR ALTERATIONS |
FULL SIZE DETAILS OF ELEVATOR SCREEN & DOORS 1ST, 2ND, 3RD, 4TH FLOORS ALTERATIONS |
Contents |
FULL DETAIL OF STAIRS ON 4TH STORY |
FULL SIZE DETAIL OF STAIRS ON LANDING A & C DOWN |
FULL SIZE DETAIL OF STAIR WALL STRING AT 4TH FLOOR |
FULL SIZE DETAILS OF STAIRS |
Contents |
F.S. DETAILS OF BOOKCASE, WARDROBE AND WAINSCOTING ROOMS 344, 345, 346 |
F.S. DETAIL OF DOOR TRIM BETWEEN ROOMS 345 AND 346 AND IN T.S. PART BET. RMS 344 AND 345 |
FULL SIZE DETAIL OF MAIN CORNICE ROOM NO 337 |
FULL SIZE DETAILS OF MARBLE WORK OF DOORS TO ROOMS 337A AND B FROM ROOM 337 |
FULL SIZE DETAILS OF MARBLE CORNICE FOR ROOM 337 |
F.S. DETAILS OF MARBLE WORK OF DOOR OPENING TO CORRIDOR FROM ROOM 337 |
Contents |
WESTERN SECTION OF BASEMENT FLOOR PLAN SHOWING HEATING & VENTILATING SYSTEM |
Contents |
FS DETAILS OF WAINSCOT & MARBLE WORK RM 341 |
F S D WAINSCOTTING DOOR & DOOR TRIM FOR PARTITION IN PRIVATE OFFICE OF THE STATE ARCHITECT |
DETAILS OF ARCHED OPENINGS LEADING TO ROOM 350 FROM E CORRIDOR N STATE CAP ALBANY NY |
Contents |
F.S. DETAILS OF PILASTER CORNICE AND WAINSCOTING ROOM 332 |
PLANS AND ELEVATIONS OF WINDOWS WITH FULL SIZE DETAILS THIRD FLOOR CORRIDOR |
F.S. DETAILS OF WAINSCOT PARTITIONS RMS 334 TO 340 AND 346 |
F.S. DETAIL OF CORRIDOR FOR TRIM ROOMS 334, 335, 336, 338, 339, 340 |
Contents |
FULL SIZE DETAIL OF SOUTH STAIRS ON LANDING & PLATFORMS |
FULL DETAIL OF STAIRS B LANDING |
FULL SIZE DETAIL OF STAIRS 5TH FLOOR LANDING |
FULL SIZE DETAIL OF STAIRS I WALL STRING & MARBLE BASES |
Contents |
FULL SIZE DETAILS OF MARBLE ARCH OVER WINDOWS ROOM 337 |
F.S. DETAILS OF CORRIDOR DOOR TO RM 332 |
F.S. DETAIL OF DESIGN OF CEILING PANELS |
CORNICE AND PART OF CEILING ROOM 332 |
Contents |
ENTRANCE FLOOR PLAN |
PLAN & ELEVATION OF EASTERN TERRACE |
TILING PLAN 2ND FLOOR WESTERN STAIRCASE |
Contents |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SESTIONS |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS AND GENERAL NOTES |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 FS SECTIONS DOORWAY 247-A |
REHABILITATE CORRIDOR ENTRANCE DOORWAYS TO ROOMS 246 247 248 249 252 253 254 PLANS AND ELEVATIONS |
Contents |
TILING PLAN 3RD FLOOR WESTERN STAIRCASE |
ALTERATIONS TO DOORWAY TO ROOM 417 ELEVATION & DETAILS |
Contents |
DETAILS OF ELEVATOR SCREEN DOORS 1ST, 2ND, 3RD & 4TH FLOORS |
FULL SIZE DETAIL OF RIB CORNICE ROOM 337 |
SIGN FULL SIZE INCISED LETTERING LAYOUT |
PRINCIPAL FLOOR PLAN |
Contents |
GROUND FLOOR PLAN |
HALF PLAN OF EASTERN APPROACH ABOVE TERRACE BACK TO CENTER OF ROADWAY 798-39 |
798-29 |
BASEMENT FLOOR PLAN NY STATE CAPITOL SHOWING FRESH AIR DUCTS W END |
WESTERN SECTION BASEMENT FLOOR PLAN |
Contents |
EAST ELEVATION |
DATA DRAWING OF PRESENT CONDITIONS 1ST FLOOR PLAN |
PRINCIPAL FLOOR PLAN |
ALTERATIONS DETAILS OF NORTH & SOUTH ELEVATOR SHAFTS |
ALTERATIONS TO VENTILATOR BACK OF SOUTH CHIMNEY OF NORTH WEST TOWER |
Contents |
DATA DWG |
SECTION THROUGH EAST ENTRANCE LOOKING WEST |
UNTITLED |
SOUTH SIDE ELEVATION OF EASTERN APPROACH PORTICO & DORMERS |
UNTITLED |
Contents |
TILING PLAN 2ND FLOOR WESTERN STAIRCASE |
WESTERN STAIRCASE PLAN OF GALLERY FLOOR |
WESTERN STAIRCASE PLAN OF GROUND FLOOR |
Contents |
DETAIL OF CORNICES IN WEST CORRIDORS NORTH AT INTERSECTION & IN WEST CORRIDOR SOUTH AT INTERSECTION |
DETAILS OF CORNICES ARCHES KEY BLOCKS BANDS PANELS BASES & CORNER BEADS IN N S W & E CORRIDORS & CORNERS BEADS IN RMS ON FOURTH
FL ELEV OF CORNER BEADS IN
|
FINISHING ROOMS & CORRIDORS DETAILS OF PLASTER FURRING & BRACKETS UNDER LANDING B |
Contents |
LEGISLATIVE REPORTERS ROOMS REPAIRS & IMPROVEMENTS TO ROOMS 3RD FLOOR |
REPAIRS FURNISHING & EQUIPMENT OF ASSEMBLY CHAMBER DETAILS OF SEATS IN LADIES GALLERY |
FINISHING 5TH FLOOR ROOMS FOR DEPT OF HEALTH |
Contents |
SECTION THROUGH TOWER LOOKING EAST |
FRAMING PLANS OF TOWER |
PLAN & ELEVATION TERRACE & PORTICO NORTH SIDE |
ELEVATION OF EAST FRONT & APPROACH |
Contents |
NORTH OR SOUTH APPROACH |
Contents |
BIRD CONTROL ABOVE SECOND FLOOR PORTIONS OF SOUTH AND WEST ELEVATIONS |
Contents |
DETAILS OF ELEVATOR SCREEN & DOOR 1ST, 2ND, 3RD & 4TH FLOORS |
FS DETAILS 5TH FLOOR LOGGIA WINDOW FRAMES ALTERATIONS |
FULL SCALE DETAILS OF ROUGH CONCRETE FILLING AROUND WINDOWS FOURTH FLOOR |
Contents |
DETAIL OF BASE & CORNICES ETC WEST CORRIDOR ON 1ST & 2ND FLOORS |
FINISHING ROOMS & CORRIDORS F. S. D. OF MAIN CORNICE AT N & S ENDS OF MAIN CORRIDOR FOURTH FLOOR CEILING |
FULL SIZE DETAILS OF STONE STILLS, ETC |
FINISHING ROOMS & CORRIDORS |
Contents |
WESTERN STAIRCASE NO 8 SECTION ON LINE C-D |
Contents |
DETAIL OF ELEVATOR SCREEN & DOOR 5TH FLOOR ALTERATIONS |
DETAILS OF ELEVATOR SCREEN DOORS 1ST, 2ND, 3RD & 4TH FLOORS |
PLAN OF TERRACE EAST SIDE |
FULL SIZE DETAIL OF ROSETTE & ORNAMENT FOR GROINED CEILINGS AT INTERSECTIONS OF W & S, S&E, & W&N CORRIDORS |
FULL SIZE SECTION THROUGH WINDOW & CORNICE NEW STONE DORMERS WEST ELEVATION |
Contents |
FULL SIZE DETAIL OF SHELL IN PEDIMENT OF NEW STONE DORMER WEST ELEVATION |
FULL SIZE DETAIL OF CORNICE PILASTER & WINDOW NEW STONE DORMERS W ELEVATION |
FULL SIZE DETAILS OF FINIALL AT TOP OF NEW STONE DOMERS WEST ELEVATION |
FULL SIZE DETAILS OF STONE WORK IN LOGGIA WEST ELEVATION |
Contents |
UNTITLED |
UNTITLED |